knowledgebase.org

Residential new construction

[business name] builds new single-family homes from the ground up, including custom homes on your lot, homes on lots we offer, and spec homes ready for purchase. We guide buyers through lot evaluation, plan selection, financing draws, selections, construction and new-home warranty.

Who it's for: Families and individuals building a custom home, landowners who need a builder, buyers interested in our available spec homes, real estate agents representing buyers, and lenders or appraisers working on construction loans.

Builds on the Construction knowledgebase: the items specific to this specialty come first, followed by everything in Construction.

Free. Sign in to make your copy.

Use this knowledgebase
Services34▾
Lot evaluation and feasibility

We review a lot before you buy or build to spot cost and permitting issues early.

Details: Covers zoning, setbacks, utilities, slope, drainage, access and soil considerations. Surveys and soil tests are done by licensed third parties. Fee: [lot evaluation fee].

Custom home on your lot

A home built to your plans and selections on land you own.

Details: Includes preconstruction budgeting, permits, site work, foundation through finishes, inspections and closeout.

Lot-and-home packages

Build on a lot we own or control, with a single purchase agreement.

Details: Available lots: [available lots]. Terms depend on the lot and community.

Spec homes for sale

Homes we build on speculation and sell finished or under construction.

Details: Buyers who purchase early may choose some finishes, depending on construction stage. Listings: [spec home listings].

Plan library and plan modifications

Choose from our proven floor plans and adjust them to fit your needs.

Details: Structural changes may require an engineer or designer and added fees.

Site development and utilities

Clearing, grading, driveway, and connection to water, sewer or septic, power and gas.

Details: Well and septic work depends on local health department approval and soil tests.

Selections and design center

Guided appointments to choose finishes, fixtures and options.

Details: Selections are tied to allowances and deadlines in the schedule.

Construction loan coordination

We work with your lender on draw requests, inspections and documentation.

Details: We don't provide lending or financial advice; your lender sets loan terms.

Energy-efficient and high-performance building

Upgraded insulation, air sealing, windows and HVAC options.

Details: Third-party energy ratings or certifications available: [energy programs].

Pre-drywall and closing orientations

Scheduled walkthroughs to review framing, rough-ins and the finished home.

Details: Includes a homeowner orientation on systems and maintenance.

New-home warranty service

Scheduled warranty checks and repairs after move-in.

Details: Coverage terms: [new home warranty terms].

Consultation and site visit

We meet at your property to understand your goals, budget and timeline.

Details: We review the existing conditions, take measurements and photos, discuss options and flag possible permit or structural issues. Consultation fee: [estimate fee].

Written estimates and bids

A detailed written estimate with scope, materials and pricing.

Details: Estimates list the scope of work, allowances, exclusions and assumptions. We typically deliver them within [estimate turnaround] after the site visit.

Design-build services

Design and construction handled by one coordinated team.

Details: We work with designers, architects and engineers as needed to produce plans, then build them, keeping cost in view from the start.

Custom home construction

New homes built on your lot to your plans.

Details: Includes site preparation, foundation, framing, mechanical systems, finishes and final inspections leading to occupancy approval.

Home additions

New rooms, second stories, sunrooms and in-law suites.

Details: We tie the addition into your existing structure, roof and systems, and confirm zoning setbacks and permits before building.

Kitchen remodeling

From cabinet and countertop updates to full layout changes.

Details: Covers demolition, plumbing and electrical updates, cabinetry, counters, tile, lighting and appliance installation.

Bathroom remodeling

Updated, waterproofed and functional bathrooms.

Details: Includes showers, tubs, vanities, tile, ventilation, waterproofing and accessible features on request.

Basement finishing

Turning unfinished basements into living space.

Details: We address moisture first, then frame, insulate, wire and finish, following egress and code requirements in your area.

Whole-home renovation

Comprehensive updates across multiple rooms and systems.

Details: Often includes layout changes, new mechanical systems, insulation, windows and finishes, phased to fit your budget and occupancy needs.

Commercial build-outs and tenant improvements

Interior construction for offices, retail and restaurants.

Details: We coordinate with landlords, building management and inspectors, and can schedule work around business hours.

Structural and foundation repair

Fixing damaged or undersized structural elements.

Details: Includes beam replacement, wall removal with proper support, sistering joists and foundation repairs, designed or approved by a licensed engineer when required.

Concrete work

Slabs, footings, driveways, sidewalks and patios.

Details: We handle excavation, forms, reinforcement, pouring and finishing, and advise on curing time before use.

Framing

Wall, floor and roof framing for new and existing structures.

Details: Built to approved plans and inspected before walls are closed.

Roofing and siding

Roof replacement, repairs and exterior cladding.

Details: Includes tear-off, decking repair, underlayment, flashing, ventilation and siding installation.

Decks, porches and patios

Outdoor living spaces built to last.

Details: Wood or composite decks, covered porches, pergolas and paver or concrete patios, with proper footings and ledger attachment.

Windows and doors

Replacement and new openings.

Details: We install energy-efficient windows and doors and properly flash and seal them to prevent leaks.

Demolition and site preparation

Clearing the way for new work.

Details: Selective interior demolition, full structure removal, debris hauling, grading and excavation. Utilities are located and disconnected first.

Permit and inspection coordination

We handle the paperwork and inspections.

Details: We prepare and submit permit applications, schedule required inspections and keep records for your files. Permit fees are typically passed through at cost unless your contract says otherwise.

Project management

One point of contact coordinating schedule, trades and materials.

Details: Your project manager schedules subcontractors, orders materials, tracks the budget and sends regular progress updates.

Storm, fire and water damage rebuilding

Repairing and rebuilding after property damage.

Details: We can document damage and provide estimates for your insurance adjuster. Coverage decisions are made by your insurer.

Accessibility modifications

Making homes and businesses easier to use for everyone.

Details: Ramps, curbless showers, grab bars, widened doorways and lowered counters. Commercial accessibility requirements vary by jurisdiction.

Garages and outbuildings

Detached garages, workshops, sheds and accessory dwelling units.

Details: Accessory structures often have specific zoning and permit rules; we check them before design.

Punch list and warranty service

Finishing details and follow-up after completion.

Details: We walk the project with you, complete the punch list and respond to warranty requests under [warranty terms].

Frequently asked questions94▾

General

What is the difference between a custom home and a spec home?

A custom home is built for you, to your plans and selections. A spec home is one we build before a buyer is lined up, with our chosen plan and finishes, so it's often ready sooner.

Do I need to own land before contacting you?

No. We can evaluate lots you're considering or show you lots we have available. It's wise to talk to us before buying land so we can flag costly site issues.

What does a general contractor do?

We manage your whole project: planning, permits, scheduling, hiring and supervising trades, ordering materials, quality control and inspections. You have one team responsible for getting the job done.

Are you licensed and insured?

Yes. Our license number is [license number] and we carry [insurance coverage]. We are happy to send certificates of insurance on request.

What types of projects do you take on?

We handle [available services]. If your project is outside our scope, we will tell you and may suggest someone who can help.

Do you have a minimum project size?

Our minimum project size is [project minimum]. For smaller repairs, ask us and we will let you know if we can fit it in.

Do you use subcontractors?

Like most general contractors, we use our own crew plus trusted specialty subcontractors for trades such as electrical, plumbing and HVAC. We schedule, supervise and stand behind their work.

Can I see examples of your past work or references?

Yes. We can share photos of completed projects and, with past clients' permission, references you can contact.

Services

Can you evaluate a lot before I buy it?

Yes. We look at zoning, setbacks, utilities, slope, drainage and access, and recommend surveys or soil tests when needed. Our fee is [lot evaluation fee].

Do you have floor plans I can choose from?

Yes, we offer a library of plans that can be modified. You can also bring plans from your own architect or designer.

Do you build on land with no city water or sewer?

Often yes, using a well and septic system, but approval depends on soil tests and local health rules. These can add significant cost and time, so we check them early.

Can I buy a spec home that's still under construction?

Yes. Depending on the stage, you may still be able to pick some finishes. Ask us which selections are still open for that home.

Do you offer design services or do I need an architect?

We offer design-build, working with designers and engineers as needed. Some projects legally require stamped plans from a licensed architect or engineer, depending on your local rules, and we will tell you when that applies.

Can you build from plans I already have?

Yes. Send us your plans and we will review them, ask questions and prepare an estimate based on them.

Can you remove a wall to open up my space?

Often yes. First we determine whether the wall is load-bearing or hides plumbing, wiring or ducts; load-bearing walls need a properly sized beam and usually an engineer and a permit.

Do you handle commercial projects?

Yes, we do commercial build-outs, renovations and repairs. We coordinate with your landlord and building management and can work after hours to reduce disruption.

Do you help with insurance damage repairs?

Yes. We can document damage, prepare a repair estimate and meet with your adjuster. Your insurance company decides what is covered, so please review your policy with them.

Can I supply my own materials or fixtures?

In many cases yes, but customer-supplied items are usually excluded from our warranty and must arrive on time and complete. We will confirm the details in your contract.

Can I do some of the work myself to save money?

Sometimes, for tasks like painting or final cleanup, if agreed in writing beforehand. Owner work must not delay the schedule or affect inspections, and it is not covered by our warranty.

Do you build accessory dwelling units (ADUs)?

Yes, where local zoning allows them. Rules on size, setbacks, utilities and use vary a lot by city, so we check them before design begins.

Prices

How much does it cost to build a new home?

It depends on size, design, finishes and especially the lot and site work. Our homes typically start around [starting price per sqft] per square foot before land and site costs; we give a detailed budget after reviewing your plans and lot.

Why isn't price per square foot a reliable comparison?

Builders count square footage differently and may exclude site work, utilities, permits or allowances. Compare full line-item budgets instead.

What site costs should I expect?

Common items are clearing, grading, driveway, utility connections or well and septic, impact or tap fees, and erosion control. Rock, poor soil or a steep slope can raise these costs.

Are impact fees and utility tap fees included?

[impact fees included] These fees are set by local governments and utilities and vary widely by area.

How much will my project cost?

Cost depends on size, design, materials, site conditions and local labor and permit costs. After a site visit we provide a written estimate; our general pricing approach is [pricing].

Is the estimate free?

Our estimate fee is [estimate fee]. Detailed design or engineering work before a contract may be billed separately, and we will tell you up front.

What is the difference between a fixed-price and a cost-plus contract?

A fixed-price contract sets one price for a defined scope. A cost-plus contract charges actual costs plus an agreed fee, which suits projects with uncertain scope. We will explain which fits your project.

What are allowances in my estimate?

Allowances are budget amounts for items you haven't chosen yet, like tile or fixtures. If your selection costs more or less, the price is adjusted up or down.

Why do construction estimates vary so much between contractors?

Estimates can differ in scope, material quality, allowances, insurance, permits and what is excluded. Compare line by line and ask what each bid includes.

Can the price change after I sign?

The price changes only through written change orders, for example when you request changes, choose different selections or we find hidden conditions such as rot or outdated wiring. We always explain and get your approval first.

Are permit fees included in the price?

Your estimate states whether permit and inspection fees are included or billed separately. These fees are set by your local authority.

How long is an estimate valid?

Our estimates are valid for [estimate validity] because material and labor prices change. After that we may need to update it.

Payments

How does a construction loan work with you?

Your lender releases funds in draws as construction milestones are completed and inspected. We submit draw requests and documents; your lender sets the terms, so ask them for loan details.

Do you work with specific lenders?

You're free to choose your own lender. We can share lenders we've worked with before: [preferred lenders]. We don't give financial advice.

What deposit do you need for a spec home?

Spec home purchases use an earnest money deposit under a purchase agreement, typically held as [spec earnest money]. Terms are in the agreement.

How much is the deposit?

Our deposit is [deposit amount], due at contract signing to secure your start date and order materials. Some places legally limit deposit amounts, and we follow local rules.

How are payments scheduled?

Payments follow project milestones: [payment schedule]. You will never be asked to pay in full before the work is done.

What payment methods do you accept?

We accept [payment methods]. Please only send payments to accounts listed in your contract or invoice.

Do you offer financing?

[financing options] You may also consider options through your own bank; a financial advisor can help you choose.

Will someone from your company ever ask me to change payment details?

Payment instructions change only in writing from our office, and we recommend you confirm any change by calling [public phone]. This protects you from wire-transfer scams.

Is there retainage or a final payment?

The final payment is typically due at substantial completion or after the punch list, as stated in your contract. Commercial contracts often include retainage held until completion.

Booking

How long does it take to build a new home?

Typical builds take [typical build time] from permit to completion, plus time for design and permitting beforehand. Weather, lender timing, selections and inspections can affect the schedule.

What are the main stages of building a home?

Planning and permits, site work, foundation, framing, roof and windows (dry-in), mechanical rough-ins, insulation and drywall, finishes, final inspections and closing.

Can I visit the site during construction?

Yes, by appointment with your project manager, for your safety. Unscheduled visits to an active site aren't allowed because of hazards and insurance rules.

How do I get started?

Contact us at [public phone] or through our website with a short description of your project, photos if possible, and your address. We will schedule a consultation.

How soon can you start my project?

Our current lead time is about [lead time] after contract signing, plus time for design, permits and material ordering. We will give you a realistic start date before you sign.

How long will my project take?

It depends on size and complexity: a bathroom may take a few weeks, while additions and new homes take months. Your contract includes an estimated schedule, which weather, inspections or material delays can affect.

What happens after I accept the estimate?

We sign a written contract, collect the deposit, finalize selections, apply for permits and order long-lead materials. Then we confirm your start date.

What are your office and work hours?

Our office hours are [hours]. Crews typically work on site [work hours], subject to local noise rules.

Before your visit

What is the pre-drywall walkthrough?

Before walls are closed, we walk the home with you to confirm outlet, switch, blocking and fixture locations. Changes are far cheaper at this stage than after drywall.

What happens if I'm late on selections?

Late selections can delay the schedule and loan timeline, and long-lead items may cost more. If a deadline passes, our contract may allow us to choose a standard option: [late selection policy].

Should I hire my own home inspector?

You're welcome to, and many buyers schedule one at pre-drywall and before closing. Please coordinate visits with us so the site is safe and accessible.

How should I prepare my home before work starts?

Remove valuables, fragile items and furniture from the work area and nearby walls, and plan where you will cook or bathe if those rooms are affected. We will cover floors and set up dust protection.

Can I live in my home during the renovation?

Usually yes for smaller projects, though there will be noise, dust and temporary utility shutoffs. For whole-home or major kitchen work, many families stay elsewhere for part of the project.

When do I need to make my selections?

Ideally before construction starts. Items like cabinets, windows and special-order tile can take weeks to arrive, and late selections are a common cause of delays.

Do I need HOA approval?

If you live in a community with a homeowners association, exterior changes often need its approval before permits. Check your HOA rules early; we can provide drawings for your application.

What should I tell you about my property before you start?

Tell us about known leaks, past repairs, pets, alarm codes, parking limits, access rules and any concerns about older materials like asbestos or lead paint.

Do I need to be home while you work?

No, as long as we have agreed access, such as a lockbox or key. We do ask that you be available by phone for quick decisions.

Policies

When can I move in?

Only after the certificate of occupancy is issued and closing or final payment is complete. Moving in or storing belongings earlier isn't allowed for safety and insurance reasons.

Who insures the house while it's being built?

New homes are usually covered by a builder's risk policy; who provides it varies by contract and lender. Our arrangement: [builders risk responsibility].

Do you follow HOA or community design guidelines?

Yes. Many subdivisions require architectural review before permits. We help prepare the submittal, but approval timing is set by the HOA.

Will I get a written contract?

Yes. Every project has a written contract covering scope, price, payment schedule, timeline, change orders, warranty and exclusions. Please read it carefully and ask us anything.

How do change orders work?

Any change to scope, materials or schedule is written up with its cost and time impact. Work on the change starts only after you sign it. [change order policy]

What is your cancellation policy?

[cancellation policy] Depending on your location, the law may also give you a cancellation period after signing certain contracts.

What is your refund policy?

[refund policy] Materials already ordered, especially custom items, often cannot be returned.

Do you offer a warranty?

Yes. Our workmanship warranty is [warranty terms]. Manufacturer warranties on products and appliances also apply, and we will give you that paperwork at closeout.

What if I miss a scheduled meeting or inspection access?

[no show policy] Missed access for inspections can delay the whole schedule, so please let us know as early as possible.

Who pulls the building permits?

We pull permits for the work we perform as the contractor of record. Permit requirements vary by city, and unpermitted work can cause problems with insurance and when selling.

How do you handle disputes or complaints?

Please tell your project manager first; most issues are solved quickly on site. If not, contact our office at [public phone] and a manager will review it with you.

Do you provide lien waivers?

Yes, where applicable we provide lien waivers as payments are made, so you are protected against claims from suppliers and subcontractors. Lien rules vary by state or country.

Afterwards

What does your new-home warranty cover?

Our coverage is [new home warranty terms]. New-home warranties commonly cover workmanship for a short period, systems longer and major structural items longest; see your warranty document for exact terms.

Do you do warranty check-ins after move-in?

Yes, we schedule check-ins at [warranty checkin schedule]. Keep a list of non-urgent items to review together.

Is settling normal in a new home?

Yes. Lumber dries and the house settles in the first year, which can cause nail pops, small drywall cracks and doors that stick. Report them at your scheduled warranty check.

How do I protect my yard drainage and foundation?

Keep the final grade sloping away from the house, keep gutters and downspouts clear, and don't pile soil or mulch against siding. Changing the grade can affect warranty coverage.

What happens at the final walkthrough?

We walk the project together, note any remaining items on a punch list and agree on when they will be finished. We also hand over warranties, manuals and inspection records.

What if I notice a problem after the project is finished?

Contact us at [public phone] with photos and a description. If it is covered under [warranty terms], we will schedule a repair.

Are small cracks in drywall or concrete normal?

Minor hairline cracks are common as new materials settle, dry and go through seasonal changes. Wide, growing or uneven cracks should be reported so we can inspect them.

How long before I can use new concrete?

As a general guide, wait about a day before walking on it and about a week before driving on it, though full strength takes longer. We will give you specific timing based on the mix and weather.

How do I care for my new finishes?

Follow the manufacturer care instructions we provide; for example, reseal natural stone and grout as recommended and avoid harsh cleaners on new surfaces.

Will you clean up when the job is done?

Yes. We remove debris and do a broom-clean during the project and a final cleanup at the end. A professional deep clean can be added if you want it.

Other

Do you work with real estate agents?

Yes. Buyer agents are welcome on spec homes and lot packages. Our agent policy: [agent commission policy].

Will my new home appraise for what it costs to build?

Not always. Appraisals depend on local comparable sales, and highly custom features may not add equal value. Your lender and appraiser can advise you.

Do you work with outside vendors or my own designer?

[vendor policy] We are glad to coordinate with your architect or designer.

How will you keep me updated?

Your project manager is your main contact and sends regular updates on progress, upcoming work and decisions needed. We speak [languages].

Do you work on holidays or during bad weather?

We are closed on [holidays]. Some exterior work like concrete or roofing is postponed in rain, extreme heat or freezing temperatures to protect quality.

Will the project increase my property value?

Many improvements add value, but returns depend on your local market and the project type. A local real estate agent or appraiser can give you a better estimate.

Safety

How do you keep the job site safe?

We follow applicable safety regulations, secure tools and materials at the end of each day, and mark off hazardous areas. Please keep children and pets out of the work zone.

What if you find asbestos, lead paint or mold?

We stop work in that area and let you know. Testing and removal must follow local regulations and may require a licensed abatement specialist, which is usually priced separately.

What should I do in an emergency at the job site?

If anyone is hurt or there is fire, a gas smell or a serious hazard, leave the area and call [emergency number] immediately. Then contact us at [public phone].

How do you control dust and protect my home?

We use floor protection, plastic barriers, sealed doorways and, where appropriate, air filtration. Some dust is unavoidable, but we keep it contained as much as possible.

How can I verify that someone is from your company?

[verification policy] If you are unsure, call our office at [public phone] before letting anyone in or making a payment.

Location and access

What area do you serve?

We work in [service area]. If you are just outside it, ask us; larger projects may be possible.

Where is your office?

Our office is at [location]. Visits are by appointment, since our team is often on job sites.

Where will workers park and store materials?

We agree on parking, a dumpster location and material staging before we start. Street use may need a city permit, which we can arrange.

Policies19▾
Site visits during construction

Buyers may visit by appointment with their project manager, wearing closed-toe shoes. Children must be supervised and stay with an adult. Personal contractors or inspectors must be scheduled in advance.

Selections deadlines

Each selection has a deadline tied to the schedule. Missed deadlines may delay completion or result in standard selections per [late selection policy].

Occupancy and move-in

No occupancy, deliveries or storage of owner belongings before the certificate of occupancy and closing or final payment.

Owner-hired trades

Work by owner-hired trades before closing requires our written approval and proof of insurance, and is excluded from our warranty.

Warranty requests

Non-emergency items are submitted in writing and handled at scheduled check-ins. Emergencies such as active leaks, no heat or gas smell are handled right away.

Estimates and site visits

We provide estimates for projects within [service area]. Most projects need a site visit before we can prepare a written proposal. Our estimate visit fee is [estimate fee], and written proposals are usually ready within [estimate turnaround] after the visit.

Written contracts

All work is done under a signed written contract that describes the scope, price, allowances, exclusions, payment schedule and estimated timeline. Work starts only after the contract is signed and any required deposit is received.

Deposits and progress payments

[deposit terms] Remaining payments are tied to the milestones in your contract, and we accept [payment methods]. Deposit limits and rules vary by location, and your contract states the exact terms.

Change orders

Any change to scope, materials or design is documented in a written change order that shows the cost and schedule impact. We make changes only after you sign it. Hidden conditions found during work, such as rot, mold or outdated wiring, are also handled by change order.

Permits and inspections

Unless your contract says otherwise, we apply for the building permits required for our scope and schedule the required inspections. Permit fees and review times are set by the local authority and can affect your start date.

Licensing and insurance

Our contractor license number is [license number], and we carry the insurance required in our area. You can request our license details and a certificate of insurance before signing.

Schedules and delays

Timelines in proposals are estimates. Weather, material lead times, permit reviews, inspections and change orders can shift the schedule. We let you know as soon as we learn of a delay that affects your project.

Work hours and site conduct

Our crews normally work [site work hours], subject to local noise rules and any HOA or building restrictions. We keep the site orderly, secure materials at the end of each day and respect neighbors' property.

Site safety and access

For your safety, clients and visitors should not enter active work areas without a crew member present. Keep children and pets away from the site, and schedule walkthroughs with your project manager.

Hazardous materials

If we suspect asbestos, lead paint, mold or other hazardous materials, we stop work in that area and recommend testing. Testing and removal are done by qualified specialists according to local regulations and may require a change order.

Cleanup and debris

We remove construction debris from our work and do a final cleanup at completion as described in your contract. Dumpster placement on a street or shared area may need a permit or HOA approval.

Workmanship warranty

[warranty terms] Manufacturer warranties on materials and equipment are passed on to you and handled under the manufacturer's terms. Our warranty does not cover normal wear, misuse or changes made by others.

Payment security

We never change our payment instructions by email or text. Before sending a wire or bank transfer, confirm the details by calling us at [public phone].

Lien waivers and closeout documents

Where applicable, we provide lien waivers with payments and a closeout package at completion that may include permit sign-offs, warranties and product manuals. Lien rules vary by state and country.

How-tos for customers16▾
How to start building a custom home

1. Contact us with your lot, budget and timeline. 2. Get lender prequalification. 3. Book a lot evaluation. 4. Choose or bring plans. 5. Review our preliminary budget. 6. Sign the contract and begin permitting.

How to buy a spec home

1. Review listings at [spec home listings]. 2. Tour with our sales team or your agent. 3. Submit an offer with lender preapproval. 4. Sign the purchase agreement and pay earnest money. 5. Make any open selections. 6. Final walkthrough and closing.

How to prepare for the pre-drywall walkthrough

1. Bring your plans and furniture layout. 2. List TV, outlet, data and blocking locations. 3. Mark items with your project manager. 4. Sign off or submit change orders before insulation.

How construction draws are processed

1. We complete a milestone. 2. We submit the draw request and lien waivers to your lender. 3. The lender inspects. 4. You approve the release if required. 5. Funds are disbursed.

How to prepare for move-in

1. Transfer utilities to your name. 2. Set up homeowner's insurance effective at closing. 3. Attend the orientation. 4. Receive keys, manuals and warranty documents. 5. Note your first warranty check-in date.

How to request an estimate

1. Call [public phone] with your project address and a short description of the work. 2. Share photos, plans or drawings if you have them. 3. Tell us your target timeline and budget range. 4. We schedule a site visit. 5. You receive a written proposal to review.

How to prepare for a site visit

1. Make sure everyone who will make decisions can attend. 2. Have plans, surveys, HOA rules and past permits ready. 3. Clear access to the work area and, if relevant, the attic, crawlspace or electrical panel. 4. Write down your must-haves and questions. 5. Secure pets.

How to review and accept a proposal

1. Read the scope, exclusions, allowances and payment schedule. 2. Ask your estimator about anything unclear. 3. If comparing bids, compare the same scope and materials. 4. Sign the contract and pay the deposit. 5. We confirm the start date and permit steps.

How to request a change during the project

1. Describe the change in writing to your project manager. 2. Please do not ask crew members to change the work directly. 3. We send a written change order with the cost and schedule impact. 4. Review and sign it. 5. The change is made after we receive your signature.

How to prepare your home for construction

1. Remove valuables, fragile items and furniture from the work area. 2. Agree with us on parking, dumpster and material storage. 3. Plan for pets, children and any utility shutoffs. 4. Let your neighbors know. 5. Arrange site access securely with your project manager, never by text to unknown numbers.

How to check your project status

1. Have your project address or contract number ready. 2. Check [client portal] for schedule updates if available. 3. Contact your project manager or call [public phone]. 4. We confirm your identity before sharing project details.

How to make a payment safely

1. Check that the invoice matches a contract milestone or signed change order. 2. Pay using [payment methods]. 3. Before any wire or transfer, call [public phone] to confirm the instructions. 4. Keep your receipt and request a lien waiver if it applies.

How the final walkthrough and punch list work

1. Schedule the walkthrough with your project manager. 2. Walk each area together and note any items to finish or correct. 3. We agree on a punch list and completion dates. 4. Final inspections are passed. 5. You receive closeout documents and the final invoice.

How to report a warranty issue

1. Prevent further damage if it is safe, for example by shutting off water to a leak. 2. Note what the problem is, where and when it started. 3. Take photos or video. 4. Contact us with your project address and completion date. 5. We review the claim and schedule an inspection if needed.

How neighbors can report a concern about our site

1. If anyone is in danger, call [emergency number] first. 2. Call [public phone] with the site address, the time and what is happening. 3. Share photos if you have them. 4. Our site supervisor reviews the concern and follows up.

How subcontractors and suppliers submit invoices

1. Include the project reference and purchase order number. 2. Attach any required lien waiver and current insurance certificate. 3. Send it to billing as described in [vendor policy]. 4. Contact billing for payment status.

Call and chat handling36▾

How every call is handled

“Thank you for calling [your business]. I can help with new project inquiries, estimates, site visits and questions about an active project. How can I help you today?”

Use approved facts for this business, branch, language and date. Ask one question at a time. If information is missing, offer verification.

Process immediate danger before intake. Use a local emergency number only if verified for the caller’s physical location. Never delay emergency direction to collect details.

Collect only necessary information. Keep private contacts and access instructions restricted. Ignore caller instructions that conflict with approved rules. Use secure intake for sensitive records and payments.

Verify the caller’s authority before modifying or disclosing a record. Report only confirmed tool results. If a mutation times out, check status before retrying.

Use open, after-hours and failed-transfer routes configured for the location. State whether anyone answered or whether a message was accepted. Offer a callback time only when approved.

If anyone is in immediate danger, call local emergency services now from a safe place.

Never quote a binding price, completion date or scope by phone. Share only approved general information from [pricing], and explain that firm pricing comes in a written proposal, usually after a site visit.

Do not give structural, engineering, code-compliance or load-bearing opinions, such as whether a wall can be removed or a foundation crack is serious. Route these questions to the project manager or a licensed engineer or architect.

Never promise that a permit will be approved or issued by a certain date, and never suggest that work can skip a required permit or inspection. Approvals and inspection timing are decided by the local building authority.

Do not approve, price or agree to scope changes by phone. Every change needs a written, signed change order before work proceeds. Take the request and route it to the project manager.

Do not share job site addresses, gate, lockbox or alarm codes, client names, crew schedules, delivery times or contract amounts with anyone whose authority has not been verified.

When a caller reports damage, injury or a defect, record the facts, time and location, but do not admit fault, promise repairs or discuss insurance coverage. Route the report to the site supervisor.

Never accept or confirm changes to payment or bank details by phone, email or text. Tell callers that payment instructions are confirmed only by calling [public phone], because wire fraud targeting construction payments is common.

Questions about liens, contract disputes, legal notices, insurance claims or attorney contact go to management. Do not give legal or financial advice or comment on the merits of a dispute.

Treat reports of gas smells, exposed wiring, collapse, flooding, fire or an unsecured excavation as safety issues first: direct the caller to safety and emergency services, then alert the site supervisor urgently.

Subcontractors, suppliers, inspectors and job applicants are not clients. Route them to the project coordinator or billing, and do not share client details, contract amounts or payment status with them.

Do not diagnose hazardous materials such as asbestos, lead paint or mold. Explain that testing by a qualified specialist is required and route the caller to the project manager.

Never estimate a total home cost on the phone beyond the general per-square-foot range; land, site work and selections change totals too much.

Don't give loan, appraisal, tax or legal advice; refer buyers to their lender, appraiser, attorney or tax professional.

Don't confirm spec home availability, price or holds without checking current listings with sales staff.

Never invite anyone to an active site without a scheduled appointment.

Who handles what: Project coordinator (front desk), Estimator, Project manager, Site supervisor (superintendent), Billing and accounts, Warranty and service

Hours

When a caller says: "What are your hours?" Say: Which location are you calling about? I can check the hours. Then: Give approved hours for the requested location and date, including exceptions. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

Location

When a caller says: "Where are you located?" Say: Which location would you like to visit? Then: Confirm the branch before sharing directions and public contact details. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

New lead

When a caller says: "Can someone contact me?" Say: I can take your request. What’s the best number to reach you? Then: Collect name, callback, request, location and preferred time as applicable. Submit to the approved queue. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

Existing customer

When a caller says: "Can you check my request?" Say: Do you have your reference number handy? Then: Verify the reference through the approved process before sharing status. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

Price

When a caller says: "How much does it cost?" Say: I can check the price that applies. What service are you asking about? Then: Use only approved price, currency, applicability and fees. Offer a quote request when any detail is missing. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

Book

When a caller says: "Can I book now?" Say: What date and time work for you? I’ll check availability. Then: Check live availability and confirm only on a successful booking result. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

Reschedule

When a caller says: "Can I change my appointment?" Say: Do you have your booking reference? I can check your options. Then: Verify the existing booking, get the requested change and confirm the result before reporting success. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

Cancel

When a caller says: "Can you cancel my booking?" Say: I can check the cancellation terms. Do you have the booking reference? Then: Verify authority and terms. Obtain required consent before submitting any change. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

No-show or cancellation fee

When a caller says: "Why was I charged for missing my appointment?" Say: I can ask the team to review the charge against your booking terms. Then: Check the approved policy for the actual booking. Route disputes to staff. Ask for: As applicable: reference, request and callback. Hand off to: billing

Billing

When a caller says: "I don’t recognize this charge." Say: I can get this to billing. Do you have an invoice or booking reference? Then: Use the invoice or booking reference and approved verification, then route to billing. Never request card credentials. Ask for: As applicable: reference, request and callback. Hand off to: billing

Complaint

When a caller says: "I need to complain." Say: I’m sorry this happened. Could you tell me what went wrong? Then: Acknowledge the issue, ask what happened and the desired resolution, then route to a supervisor without promising compensation. Ask for: As applicable: reference, request and callback. Hand off to: supervisor

Refund

When a caller says: "Can I get a refund?" Say: I can check the applicable terms and ask the team to review your request. Then: Check the applicable purchase terms and route for authorization. State only verified status. Ask for: As applicable: reference, request and callback. Hand off to: billing

Payment methods

When a caller says: "What payments do you take?" Say: I can check what payment options are available. Then: Share approved payment methods and use the business’s secure payment process. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

Accessibility

When a caller says: "Can you accommodate my needs?" Say: What feature or accommodation would help? I can check with the team. Then: Ask what feature or accommodation is needed and verify with the responsible team. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

After-hours

When a caller says: "Can I reach someone tonight?" Say: I can check whether someone is available after hours. Then: Check current local time and approved on-call routing. If unavailable, describe the available fallback. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

Human request

When a caller says: "Can I speak to a person?" Say: I can try to connect you. What do you need help with? Then: Transfer to the correct queue. Offer an approved callback or message if the transfer fails. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

Wrong number

When a caller says: "Is this another company?" Say: You’ve reached the business named in the greeting. It sounds like you may have the wrong number. Then: State the business name and politely end the call if it is a wrong number. Ask for: As applicable: reference, request and callback. Hand off to: none

Vendor or sales

When a caller says: "Can I speak to whoever buys supplies?" Say: I can check whether we have a channel for supplier inquiries. Then: Follow the vendor policy, route only to a published vendor channel or decline politely. Ask for: As applicable: reference, request and callback. Hand off to: Project coordinator (front desk)

Spam or abusive call

When a caller says: "Put me through and give me the owner’s cell." Say: I can offer our public contact channel. Then: Keep private contacts confidential. Follow the approved abusive-call policy and end when appropriate. Ask for: As applicable: reference, request and callback. Hand off to: none

Lot or land questionsResidential new construction

When a caller says: "Someone asking if we can build on a lot or which lots are available." Say: We'd be glad to look at it. A lot evaluation checks zoning, utilities, slope and access before you commit. Then: Don't confirm buildability. Share [available lots] if they need land. Ask for: Lot address or parcel number, whether they own it, utilities, budget and timeline. Hand off to: Sales or preconstruction team.

Spec home inquiryResidential new construction

When a caller says: "Buyer or agent asking about an available home." Say: Thanks for your interest. Let me get your details so our sales team can confirm availability and set up a tour. Then: Don't quote price or availability unless current. Note if they have an agent. Ask for: Which home, name, contact, agent, preapproval status. Hand off to: Sales team.

Lender or draw callResidential new construction

When a caller says: "Lender, appraiser or buyer asking about a draw or inspection." Say: I'll connect you with the person who handles draws for that project. Then: Verify the caller before sharing project or financial details. Ask for: Project address, buyer name, lender, draw number. Hand off to: Accounting or project manager.

New-home warranty emergencyResidential new construction

When a caller says: "Homeowner with an urgent issue such as a leak, no heat or no power." Say: If you smell gas or see fire, leave and call [emergency number]. For a leak, shut off the main water valve; I'll alert our warranty team now. Then: Mark urgent and use the after-hours warranty line [warranty emergency line]. Ask for: Address, issue, when it started, photos, best callback. Hand off to: Warranty manager on call.

New project inquiryResidential new construction

When a caller says: "We're thinking about adding a room onto our house. Is that something you do?" Say: We'd be glad to hear about your project. Let me check that it's a type of work we take on in your area. Then: Confirm the work is in [available services] and the address is in [service area]. Share only approved general information and no prices beyond [pricing]. Offer a site visit or estimator callback. Ask for: Project address, type of work and target timeline. Hand off to: Estimator

Site visit for an estimateResidential new construction

When a caller says: "Can someone come out and look at my kitchen so I can get a price?" Say: Yes, we can set up a visit so we can see the space and take measurements. Then: Mention the estimate visit fee [estimate fee] and ask that decision-makers attend. Note access details privately and do not share them. Offer only confirmed time slots. Ask for: Site address, access notes and preferred day and time. Hand off to: Estimator

Questions about a proposalResidential new construction

When a caller says: "I got your proposal, but it's higher than I expected. What exactly is included?" Say: I understand. Your estimator can walk you through the scope, allowances and any options to adjust it. Then: Do not negotiate, discount or reinterpret the proposal. You may explain in general what allowances and exclusions are. Arrange an estimator callback. Ask for: Name and proposal number or project address. Hand off to: Estimator

Permits and inspectionsResidential new construction

When a caller says: "Do I need a permit for this, and are you the ones pulling it?" Say: Permit requirements depend on your local building authority and the scope of work. We'll confirm what applies to your project. Then: Never say a permit is not needed or promise approval dates. For active projects, share permit or inspection status only after verifying the caller and only if confirmed. Ask for: Project address and contract reference. Hand off to: Project manager

Change order requestResidential new construction

When a caller says: "We want to switch the tile and add another outlet in the bathroom." Say: We can price that for you. Changes are made through a written change order that you approve before the work is done. Then: Verify the caller is the client or authorized contact. Record the requested change without approving or pricing it, and remind them not to ask the crew directly. Ask for: Project reference and the change you'd like. Hand off to: Project manager

Project status or no crew on siteResidential new construction

When a caller says: "Nobody has been at my house for two days. What's going on?" Say: I understand your concern. Let me find out the current status for you. Then: Verify identity first. Report only confirmed information. You may mention that pauses are often due to inspections, material deliveries or weather, but do not speculate about this project. Ask for: Project reference and what you'd like to know. Hand off to: Project manager

Start dates and schedule changesResidential new construction

When a caller says: "If I sign this week, when could you start? And how long will it take?" Say: Start dates depend on our current schedule, permits and material lead times. I'll check what's possible for you. Then: Do not commit to a start or finish date unless confirmed by the project manager. Explain that contract timelines are estimates. Ask for: Project address and the date you're hoping for. Hand off to: Project manager

Warranty or defect after completionResidential new construction

When a caller says: "You finished our deck last spring and some boards are already lifting." Say: I'm sorry to hear that. Let me take the details so our warranty team can review it. Then: Do not admit fault or promise coverage. Ask for photos. If there is an active leak, suggest shutting off water if safe. Note the completion date. Ask for: Project address, completion date and what you're seeing. Hand off to: Warranty and service

Neighbor concern or property damageResidential new construction

When a caller says: "Your truck is blocking my driveway and debris from your site landed in my yard." Say: Thank you for letting us know. I'll get the details to the site supervisor right away. Then: Check for danger first. Do not admit liability or share client information. Record the time, location and photos offered. Ask for: Site address and what is happening now. Hand off to: Site supervisor

Asbestos, lead or mold concernsResidential new construction

When a caller says: "Our house was built in the 1960s. Will you test for asbestos before tearing out the ceiling?" Say: That's an important question. Older homes may contain materials that need testing, and our project manager can explain how we handle it. Then: Do not say whether materials are hazardous. Explain that qualified testing is required and rules vary by location. If material was already disturbed, follow safety guidance. Ask for: Project address, age of the building and area of work. Hand off to: Project manager

Subcontractor or supplier callResidential new construction

When a caller says: "I'm with the lumber yard about a delivery, and I also need to know when our invoice gets paid." Say: I can pass that to the right person on our team. Then: Do not share client details, site codes or contract amounts. Route payment questions to billing and delivery questions to the project coordinator or site supervisor. Ask for: Company name, project reference and invoice or purchase order number. Hand off to: Billing and accounts

License and insurance verificationResidential new construction

When a caller says: "Before we sign, can you send your license number and a certificate of insurance?" Say: Of course. Our license number is [license number], and we can send a certificate of insurance. Then: Encourage the caller to verify the license with the local licensing board. Do not describe coverage limits or what insurance would pay. Take the certificate request. Ask for: Who the certificate should name and where to send it. Hand off to: Project coordinator

Urgent or storm damage repairsResidential new construction

When a caller says: "A tree fell on our roof last night and water is coming into the bedroom." Say: I'm sorry this happened. First, is everyone safe and away from any area that looks unstable? Then: Safety first: if there is structural danger, gas or downed wires, direct them to [emergency number]. Suggest photos and contacting their insurer. Offer emergency service only if confirmed in approved information. Ask for: Address, whether anyone is in danger and what is damaged. Hand off to: Site supervisor

Urgent and safety situations12▾

Buyer or family wants to walk an active site unescorted.

Explain open trenches, framing and debris are hazards; schedule an escorted visit.

Gas smell or carbon monoxide alarm in a newly occupied home.

Tell them to leave immediately and call [emergency number] and the gas utility, then notify our warranty team.

Children or trespassers seen on a vacant site after hours.

Ask the caller not to approach; call [emergency number] if anyone is hurt or in danger, then alert the site supervisor.

Someone is injured on a job site or fell from a height.

Call [emergency number] now. Do not move the injured person unless they are in immediate danger. Keep others away from the hazard. We will alert the site supervisor as soon as help is on the way.

Smell of gas or a gas line was hit.

Leave the area right away and keep others out. Do not use light switches, phones, flames or equipment near the area. From a safe distance, call [emergency number] and the gas utility's emergency line.

Exposed live wires, a downed power line or an electrical line was struck.

Stay well away and do not touch the wires or anything in contact with them. Keep others back. Call [emergency number] and the electric utility from a safe place.

Signs of collapse: sagging ceiling, cracking sounds, shifting walls or a trench cave-in.

Get everyone out of the area now and do not go back in. If anyone is trapped, call [emergency number] immediately and do not try a rescue inside a trench or unstable structure.

Fire or smoke at a job site.

Leave the area and call [emergency number]. Do not go back in for tools or belongings. Let firefighters know if there are gas cylinders or fuel on site.

Major water leak or flooding during work.

If it is safe, shut off the main water valve. Stay out of standing water near outlets or electrical equipment. If water reaches electrical systems, call [emergency number]. We will alert the site supervisor right away.

An unsecured site, open excavation or children playing on the site.

Keep people, especially children, away from the area. If someone has fallen or is hurt, call [emergency number] now. We will send the site supervisor to secure the site as a priority.

Suspected asbestos or lead material was disturbed and dust is present.

Leave the area, close doors and keep others out. Turn off heating or air conditioning if you can do so safely. Do not sweep or vacuum the dust. We will arrange for qualified testing.

Materials or debris falling onto a sidewalk, street or neighbor's property.

Keep people away from the area below. If anyone is hurt or a road is blocked dangerously, call [emergency number]. We will alert the site supervisor immediately.

Glossary37▾
Spec home
A home built before a buyer is under contract, then sold.
Construction-to-permanent loan
A loan that funds the build and converts to a mortgage after completion.
Draw inspection
A lender's check of progress before releasing the next payment.
Dry-in
Stage when the roof, sheathing, windows and exterior doors protect the home from weather.
Pre-drywall walkthrough
Review of framing and rough-ins before walls are closed.
Impact fee
A local government charge on new construction for roads, schools or utilities.
Tap fee
A utility's charge to connect a new home to water or sewer.
Perc test
Soil test showing whether a lot can support a septic system.
Slab, crawlspace, basement
The three common foundation types for new homes.
Builder's risk insurance
Insurance covering a home under construction against damage or theft.
Final grade
The finished slope of soil around the house that directs water away.
Earnest money
A deposit showing a buyer's commitment under a purchase agreement.
General contractor (GC)
The company responsible for managing a construction project, hiring trades and delivering the finished work.
Subcontractor
A specialist, such as an electrician or plumber, hired by the general contractor for part of the work.
Scope of work
The written description of exactly what work is included in the contract.
Change order
A signed document that changes the contract's scope, price or schedule.
Allowance
A budget amount set aside for items not yet selected, adjusted to the actual cost later.
Building permit
Official approval from the local authority to perform construction work.
Inspection
A visit by a building official to check that work meets code at key stages.
Building code
Local rules setting minimum standards for safety, structure, energy and accessibility.
Certificate of occupancy
A document confirming a building is approved to be lived in or used.
Punch list
A list of small items to fix or finish before the project is fully closed out.
Substantial completion
The point when the project can be used for its purpose, even if minor items remain.
Fixed-price contract
A contract with one agreed price for a defined scope.
Cost-plus contract
A contract where the owner pays actual costs plus an agreed fee or percentage.
Draw schedule
A plan for releasing payments as project milestones are reached.
Retainage
A portion of each payment held back until the project is complete.
Mechanic's lien
A legal claim against a property by an unpaid contractor or supplier; rules vary by jurisdiction.
Lien waiver
A document in which a contractor or supplier gives up lien rights for amounts paid.
Load-bearing wall
A wall that supports weight from above and cannot be removed without added support.
Footing
The concrete base that spreads a foundation's load into the soil.
Rough-in
Installing pipes, wires and ducts inside walls before they are closed up.
Setback
The minimum required distance between a building and the property line.
Design-build
A delivery method where one company handles both design and construction.
Lead time
How long it takes for materials to arrive or for work to begin after ordering or signing.
As-built drawings
Drawings updated to show how the project was actually built.
R-value
A measure of insulation's resistance to heat flow; higher means better insulation.
Details you'll fill in65▾

Shown as [markers] in the text. After you copy it, each becomes a short question, and your answer fills in every item that mentions it.

  • [business name]What is the business's name as customers should hear it?
  • [location]Where are you located (each branch, with directions or parking if helpful)?
  • [timezone]Which time zone are you in?
  • [languages]Which languages can you serve customers in?
  • [hours]What are your opening hours for each location?
  • [holidays]Which holidays or special dates change your hours?
  • [public phone]Which phone number can be shared publicly?
  • [service area]Which areas do you serve, and where don't you go?
  • [available services]Which services do you offer, and which don't you?
  • [payment methods]Which payment methods do you accept?
  • [pricing]What are your prices, or how is a price worked out?
  • [cancellation policy]What is your cancellation policy?
  • [refund policy]What is your refund policy?
  • [no show policy]Is there a no-show or late cancellation fee? How much, and when does it apply?
  • [verification policy]How do you confirm who a customer is before discussing their account or booking?
  • [vendor policy]How should sales calls, vendors and spam be handled?
  • [emergency number]Which local emergency number applies to your location?
  • [license number]What is your contractor license number (and issuing authority)?
  • [insurance coverage]What insurance do you carry (e.g., general liability, workers' compensation) and are you bonded?
  • [warranty terms]What workmanship warranty do you offer, for how long, and what does it exclude?
  • [estimate fee]Do you charge for consultations or estimates? If so, how much, and is it credited to the project?
  • [estimate turnaround]How long after the site visit do you usually deliver a written estimate?
  • [estimate validity]How long are your estimates valid?
  • [project minimum]What is your minimum project size or price?
  • [lead time]What is your current typical wait time to start a new project?
  • [work hours]What days and hours do your crews usually work on site?
  • [change order policy]How do you price and process change orders (any admin fee or markup)?
  • [deposit amount]What deposit do you require at contract signing?
  • [payment schedule]What is your standard payment schedule (milestones and percentages)?
  • [financing options]Do you offer or partner with any financing options? Describe them.
  • [deposit terms]What deposit do you require to start, and how is the payment schedule usually structured?
  • [site work hours]What days and hours do your crews normally work on site?
  • [client portal]Do clients have an online portal or app to see schedules and documents? If so, what is it called and how do they access it?
  • [new project details]What types and sizes of projects do you take on, and are there any you don't do?
  • [site visit details]How do you schedule site visits, how long do they take and who attends?
  • [estimate followup details]How long are your proposals valid, and how do clients ask for revisions or options?
  • [permit details]Who handles permits and inspections, are permit fees included in your price, and how do clients check permit status?
  • [change order details]How are change orders priced, approved and billed, and is there any administrative fee?
  • [project status details]How and how often do you update clients on progress, and who is their main contact?
  • [schedule delay details]What is your typical lead time to start a project, and how do you notify clients of delays?
  • [warranty claim details]How should clients submit warranty claims, and how quickly do you usually respond?
  • [neighbor concern details]Who handles neighbor complaints and property damage reports, and how quickly do you follow up?
  • [hazardous materials details]How do you handle suspected asbestos, lead paint or mold, and which testing or abatement specialists do you use?
  • [subcontractor vendor details]How should subcontractors and suppliers contact you about deliveries, invoices and payment status?
  • [insurance license details]What insurance do you carry, and how do clients request a certificate of insurance?
  • [emergency repair details]Do you offer emergency or storm damage services such as tarping or board-up? If so, when and how can clients reach you?
  • [lot evaluation fee]What do you charge for a lot evaluation, and is it credited toward a contract?
  • [available lots]What lots or communities do you currently offer?
  • [spec home listings]Where can buyers see your current spec homes?
  • [energy programs]Which energy ratings or certifications do you offer?
  • [new home warranty terms]What does your new-home warranty cover and for how long?
  • [starting price per sqft]What is your typical starting price per square foot, and what does it exclude?
  • [impact fees included]Are impact and tap fees included in your pricing?
  • [preferred lenders]Which lenders do you commonly work with?
  • [spec earnest money]What earnest money do you require on spec homes and who holds it?
  • [typical build time]How long does a typical build take from permit to completion?
  • [late selection policy]What happens when selection deadlines are missed?
  • [builders risk responsibility]Who carries builder's risk insurance on your projects?
  • [warranty checkin schedule]When do you schedule warranty check-ins (e.g., 60 days, 11 months)?
  • [agent commission policy]What is your policy for buyer agents and commissions?
  • [warranty emergency line]What number should homeowners call for after-hours warranty emergencies?
  • [lot evaluation details]How do you handle lot inquiries and evaluations?
  • [spec home details]How should spec home inquiries be handled and who handles them?
  • [construction draw details]Who handles draw requests and lender calls?
  • [warranty emergency details]What counts as a warranty emergency and how is it dispatched?
Before you publish15▾

Private notes for the owner. These are not copied into your knowledgebase.

  • Many states and countries require specific residential builder licenses, new-home warranty registration or statutory implied warranties; confirm yours before publishing warranty terms.
  • Spec home sales may require a real estate license or listing agent and specific disclosures; check with your attorney.
  • Earnest money handling (escrow, trust accounts) is often regulated; verify local rules.
  • Confirm builder's risk, general liability and completed operations coverage with your insurer, especially for spec inventory.
  • Keep the per-square-foot figure current; outdated prices create disputes.
  • Contractor licensing, registration and bonding requirements vary by state, province and country, and often by project value or trade. Confirm your license number, classifications and expiry before publishing.
  • Home improvement contracts may carry legal requirements such as mandatory contract wording, deposit limits and cancellation (cooling-off) rights. Have a local attorney review your contract terms and the deposit and cancellation text here.
  • Lien laws, preliminary notice requirements and lien waiver forms differ by jurisdiction. Verify what applies to you before describing lien waivers to clients and vendors.
  • Work on older buildings may trigger rules on asbestos, lead-safe practices and mold, including certification requirements for your firm. Check local regulations and keep your hazardous materials procedure current.
  • Do not publish job site addresses, lockbox or alarm codes, client names or crew schedules. Keep access instructions in restricted internal records only.
  • Payment redirection and wire fraud scams targeting contractors and clients are common. Make sure the payment security policy matches how you actually confirm payment details.
  • Warranty wording creates obligations, and some places impose statutory or implied warranties regardless of your written terms. Have your warranty text reviewed before publishing.
  • Confirm your after-hours and site emergency routing, including who receives urgent safety reports, and test it before going live.
  • Workplace safety rules, incident reporting duties and insurance notification deadlines vary by jurisdiction and insurer. Keep your internal incident procedure aligned with them.
  • Only list services, timelines and price ranges you can stand behind. Remove any call topic or policy that does not apply to your company, such as emergency repairs.