Civil and structural engineering firms assess, design and document the parts of buildings and sites that keep them standing, dry and safe. Typical work includes structural inspections, foundation evaluations, beam and wall-removal design, new building and addition design, retaining walls, grading and drainage, stormwater management, utility and roadway design, permit drawings, construction-phase support and forensic damage assessments. Licensed engineers apply building codes and engineering standards, and in most jurisdictions only a licensed engineer may seal (stamp) engineering documents for permits.
Who it's for: Homeowners planning renovations or worried about cracks, settlement or water problems; home buyers and sellers needing a structural opinion; general contractors and builders; architects and designers who need structural or civil engineering; real estate developers; property managers, HOAs and building owners; commercial tenants doing build-outs; insurance adjusters and attorneys needing damage assessments or expert opinions; and public agencies and municipalities.
Free. Sign in to make your copy.
Use this knowledgebaseSpecialties
Specialties with their own version are linked.
- Residential Structural Engineering
- Commercial Structural Engineering
- Site and Land Development →
- Stormwater and Drainage Engineering
- Forensic Engineering
- Seismic and Wind Retrofit
- Foundation Engineering
- Transportation and Roadway Design
- Water and Wastewater Utilities
- Bridges and Infrastructure
- Construction Inspection and Materials Testing
Services25▾
Structural Inspection and Assessment
An on-site evaluation of a building's structure by an engineer, with a written report.
Details: We look at framing, foundations, walls, floors and roof structure, note visible signs of distress such as cracks, sagging or movement, and explain likely causes. You receive a report with findings and recommendations. The assessment is visual and non-destructive unless otherwise agreed.
Foundation Evaluation
Assessment of foundation cracks, settlement, heaving and floor unevenness.
Details: May include a floor elevation survey, crack mapping and review of drainage and soil conditions. We tell you whether movement appears active or historic and whether repair, monitoring or a geotechnical investigation is recommended.
Wall Removal and Beam Design
Engineering to safely remove or open a load-bearing wall.
Details: We confirm whether the wall is load-bearing, trace loads down to the foundation, and specify the beam, posts, connections and footings needed. Deliverables are typically sealed calculations and a sketch or drawing suitable for permit, where required.
Residential Additions and Renovations
Structural design for additions, second stories, garages, ADUs and major remodels.
Details: We check whether the existing structure and foundation can carry new loads and design framing, foundations and lateral bracing. We coordinate with your architect or designer and respond to plan review comments.
New Building Structural Design
Complete structural design for new residential and commercial buildings.
Details: Includes gravity and lateral (wind and seismic) systems, foundations and connections in wood, steel, concrete or masonry, with sealed drawings and calculations for permit and construction.
Retaining Wall Design
Design of concrete, block, segmental and timber retaining walls.
Details: We design for wall height, soil, slope and surcharge loads such as driveways or buildings above, including drainage behind the wall. Many jurisdictions require engineered design above a certain wall height.
Deck, Balcony and Stair Evaluation and Design
Safety evaluations and new designs for decks, balconies, stairs and guardrails.
Details: We check ledger attachments, posts, connections, decay and guardrail strength, and provide repair or replacement designs. Some jurisdictions require periodic balcony inspections for multifamily buildings.
Pre-Purchase Structural Inspection
A focused structural opinion for buyers before closing.
Details: Often requested after a home inspector flags a concern. We evaluate the specific issue or the whole structure and give a clear opinion and repair recommendations to support your decision and negotiation.
Damage Assessment
Evaluation after storms, fire, flooding, vehicle impact, falling trees or earthquakes.
Details: We document damage, assess safety and give repair recommendations. Reports can be shared with your insurer or adjuster with your permission.
Seismic and Wind Retrofit Design
Strengthening existing buildings against earthquakes and high winds.
Details: Examples include anchoring houses to foundations, cripple wall bracing, soft-story retrofits and roof-to-wall connections. Some cities have mandatory retrofit programs; we can help you understand what applies.
Repair and Remediation Design
Engineered repair plans for damaged or deteriorated structures.
Details: Covers foundation underpinning, sistering of joists, concrete and masonry repair, rot replacement and connection upgrades, with drawings your contractor can price and build from.
Load Capacity Evaluation
Checking whether an existing floor, roof or mezzanine can support new loads.
Details: Common for heavy equipment, storage racks, rooftop units, hot tubs, libraries and change of building use. We provide capacity calculations and, if needed, a reinforcement design.
Solar and Rooftop Equipment Letters
Structural review of roofs for solar panels, HVAC units and antennas.
Details: We verify the roof can carry the added weight and wind loads and specify attachments if needed, providing a sealed letter or calculations for the permit where required.
Site Plan and Grading Design
Layout and grading of lots and development sites.
Details: We set building pad elevations, slopes, driveways and drainage paths so water flows away from structures and the site meets local codes. Usually requires a topographic survey.
Stormwater Management and Drainage Design
Solving drainage problems and designing stormwater systems for new development.
Details: Includes drainage studies, swales, French drains, catch basins, detention or retention ponds, infiltration and stormwater reports required by local agencies.
Erosion and Sediment Control Plans
Plans to keep soil and sediment on site during construction.
Details: We specify silt fences, inlet protection, construction entrances and stabilization measures, and prepare the plans or permits your jurisdiction requires.
Utility Design
Design of water, sanitary sewer and storm sewer connections and mains.
Details: We size pipes, set grades and locations, and coordinate with the utility provider's standards and approval process.
Roadway, Driveway and Parking Design
Design of private roads, driveways, parking lots and site access.
Details: Covers geometry, pavement sections, grading, drainage, accessible parking and curb cuts, following local standards.
Subdivision and Land Development Plans
Civil engineering for dividing land and preparing it for development.
Details: We prepare lot layouts, grading, streets, utilities and stormwater plans and guide them through agency review, working with surveyors, planners and other consultants.
Permit Drawings and Engineer Letters
Sealed drawings, calculations and letters required by building departments.
Details: We prepare the engineering documents for your permit and respond to plan check comments. Seal requirements vary by jurisdiction, and we can only seal work we prepared or directly supervised.
Construction Administration
Engineering support while your project is being built.
Details: Includes answering contractor questions (RFIs), reviewing shop drawings and submittals, site observations at key stages and field fixes when conditions differ from the plans.
Special Inspections and Materials Testing
Code-required inspections and testing during construction.
Details: May include reinforcing steel and concrete placement, structural welding and bolting, masonry, soil compaction and concrete cylinder testing, with reports to the building official. Availability depends on our [available services].
Peer Review and Plan Check Support
Independent review of another engineer's design or help answering agency comments.
Details: Useful for owners, lenders and agencies wanting a second opinion, or for designers who need structural or civil responses to plan review.
Expert Witness and Litigation Support
Engineering investigation, reports and testimony for disputes and claims.
Details: We investigate causes of failures or defects, review documents, prepare expert reports and can testify when engaged. We provide engineering opinions, not legal advice.
Crack and Movement Monitoring
Tracking cracks or settlement over time to see if movement is active.
Details: We install crack gauges or take repeated elevation readings over weeks or months, then report whether movement continues and whether repairs are needed.
Frequently asked questions63▾
General
What is the difference between a civil and a structural engineer?
Structural engineers focus on what holds a building up: beams, columns, walls and foundations. Civil engineers focus on the site and infrastructure around it, such as grading, drainage, roads and utilities. Many projects need both, and we can help with [available services].
Are your engineers licensed?
Yes. Our engineers are licensed in [licensed states]. Licensing rules vary by jurisdiction, so we confirm we can legally seal work in your project's location before we start.
Do I need an engineer or an architect?
Architects design the layout, look and function of a building; engineers make sure the structure and site work safely. Small structural jobs like a beam or retaining wall may only need an engineer, while new buildings and large additions usually need both. Your local building department can tell you what it requires.
How is a structural engineer different from a home inspector?
A home inspector does a broad general check of the whole house. A structural engineer is licensed to evaluate structural problems in depth, determine likely causes and design repairs. Home inspectors often recommend an engineer when they find cracks, sagging or movement.
Do you carry professional liability insurance?
[professional liability insurance] We can provide a certificate of insurance on request for projects that require one.
Services
Can you tell me if a wall is load-bearing?
Yes. We check the framing above and below the wall, usually from the attic and basement or crawlspace, to see if it carries loads. If it does, we can design the beam and supports needed to remove or open it.
Can you help with water pooling or flooding on my property?
Yes. We look at grading, downspouts, slopes and where water comes from and goes, then design practical fixes such as regrading, swales or drains. Larger sites may need a formal drainage study.
Do you provide stamped drawings for permits?
Yes, for work we design or directly supervise, we provide sealed drawings, calculations or letters as your building department requires. Requirements vary by jurisdiction.
Do you do soil testing?
Soil borings and geotechnical reports are prepared by geotechnical engineers. [geotechnical services] We use their recommendations to design foundations, retaining walls and pavements.
Will you submit the permit application for me?
[permit submission policy] Either way, we respond to the building department's engineering comments on our documents.
Can you check whether my contractor built things correctly?
Yes. We can observe work against the approved plans, and for our own designs we offer construction observation at key stages. We report what we see; disputes over contracts are a legal matter between you and your contractor.
Do you work on commercial and public projects too?
Our current services are [available services]. Contact us with your project scope and we will confirm whether it is a good fit.
Prices
How much does a structural inspection cost?
A standard residential site visit and report is [site visit fee]. Larger buildings, multiple issues or added testing cost more, and we confirm the price before scheduling.
How do you price design projects?
Most design work is quoted as a fixed fee based on a defined scope, while open-ended work like construction support or expert work is often billed hourly. See [pricing] for details; you receive a written proposal before work begins.
Why can't you give me an exact price over the phone?
The effort depends on the building, the problem and what the permit office requires. With a short description, photos and any existing plans, we can usually give a firm quote quickly.
Do you charge for revisions?
[revision policy] Changes to the scope after design starts may be billed as additional services, and we let you know before doing that work.
Can you rush my project?
When our schedule allows, we offer expedited service for [rush fee]. Ask us about current availability.
Do you charge for travel?
[travel fee] Projects within [service area] usually have no or minimal travel charges.
Booking
How do I schedule a site visit?
Call us at [public phone] or send a request with your address, a description of the issue and some photos. We confirm the scope and fee, then book a time that works for you.
How soon can you come out?
Site visits are typically scheduled within [inspection lead time]. Urgent safety concerns are prioritized whenever possible.
How long does a design project take?
Typical turnaround is [typical turnaround], depending on size and complexity. Building department review time is separate and outside our control.
What information do you need for a quote?
The property address, what you want to do or the problem you see, photos, and any existing plans, surveys or reports. Tell us if you have a deadline such as a closing date or permit submission.
Can I be there during the inspection?
Yes, and we encourage it. You can show us your concerns and ask questions on site. Someone with access to the property needs to be present or arrange entry.
Will you work with my architect and contractor?
Yes. We regularly coordinate with architects, designers, contractors, surveyors and geotechnical engineers. Just share their contact details and we will keep everyone aligned.
Policies
What is your cancellation policy?
[cancellation policy] Please let us know as early as possible if you need to reschedule a site visit.
What is your refund policy?
[refund policy] Fees for work already performed, such as site visits or completed design phases, are generally not refundable.
What happens if no one is there to let you in?
[no show policy] Please make sure access to the property, attic and basement or crawlspace is arranged before the visit.
Can you stamp drawings someone else prepared?
Generally no. Engineers may only seal work prepared by them or under their direct supervision. We can review the drawings and, if appropriate, take over and complete the design ourselves.
Who owns the drawings and reports?
You receive copies to use for your project as described in our agreement. Ownership and reuse rights are set out in that agreement, and our documents should not be reused for other sites without our permission.
Will you share my report with others?
Reports are confidential and go to the client who hired us. We share them with insurers, buyers, lenders or contractors only with your permission, unless required by law.
Do I need to sign a contract?
Yes. We send a written proposal or agreement describing the scope, fee, schedule and terms, and begin work once it is signed.
Before your visit
How should I prepare for a site inspection?
Clear access to the attic, basement or crawlspace, and the walls or areas of concern. Secure pets, unlock gates and make sure lights work in those spaces.
What documents should I gather?
Existing plans, property surveys, geotechnical reports, prior inspection or engineering reports, permits and records of past repairs. Copies are fine, and missing documents won't stop us from starting.
What should I tell you about cracks I've noticed?
When you first saw them, whether they are growing, and whether doors or windows started sticking. Dated photos, especially with a ruler for scale, are very helpful.
Do I need a survey before you design my site?
Usually yes. Grading, drainage and utility design need accurate boundaries and elevations. If you don't have a current survey, we can coordinate with a licensed surveyor.
Should I patch or paint over cracks before you come?
No. Please leave cracks and damage as they are so we can see their true size and pattern. Patching can hide important clues.
Should I start demolition before I have engineering?
We recommend waiting. Removing finishes in small areas can help us see framing, but removing structural elements before a design is in place can be dangerous and may violate permit rules.
Afterwards
When will I receive my report?
Reports are usually delivered within [report turnaround] after the site visit, by email in PDF format.
What if I have questions about my report?
Just contact us. A short follow-up call to explain findings is included; extended consultations or additional site visits may be billed separately.
Do you visit during construction?
We offer construction observation at key stages, such as before pouring footings or closing in framing. Some building departments require it; we recommend it for structural repairs.
Can you provide a final letter after repairs are done?
Yes. After observing the completed work, we can issue a letter stating it was done in general conformance with our design. This is often needed for permit closeout or property sales.
What if the contractor finds something unexpected?
Have them stop work in that area and contact us. We review photos or visit the site and provide a revised detail if needed.
How long do you keep project records?
We keep project records for [record retention period]. Ask us if you need a copy of a past report or drawing.
Safety
What should I do if I think my building may collapse?
Get everyone out immediately and call [emergency number]. Warning signs include rapidly growing cracks, cracking or popping sounds, sudden sagging, and doors or windows that suddenly jam. Once everyone is safe, call us at [public phone].
Is it safe to stay in my home with these cracks?
Many cracks are cosmetic, but we can't confirm safety without seeing them. If you see warning signs of active movement, leave and call [emergency number]; otherwise, schedule an inspection.
What should I do after a storm, fire, flood or earthquake?
Stay out of visibly damaged areas, shut off utilities if it is safe to do so, and follow instructions from emergency officials. Take photos from a safe distance and contact us for a damage assessment.
Can I remove a wall myself once I have your beam design?
We strongly recommend a qualified, licensed contractor. Removing a bearing wall requires temporary shoring and correct installation, and usually a permit. Mistakes can cause sudden collapse.
Are there areas your engineer may not enter?
Yes. Our staff may decline to enter areas that appear unsafe, such as damaged crawlspaces, unstable roofs or spaces with standing water, mold or exposed wiring. We note any limitations in the report.
Is a leaning retaining wall dangerous?
It can be. Keep people, vehicles and heavy items away from the top and base of the wall and contact us for an evaluation. If it is moving quickly or near a home or road, call [emergency number].
Payments
What payment methods do you accept?
We accept [payment methods].
Do you require a deposit?
[retainer policy] The deposit is applied to your final invoice.
When is payment due?
Payment terms are listed in your proposal. Final reports and sealed documents are typically released once the invoice is paid.
How are larger projects billed?
Larger projects are usually billed in phases or monthly based on progress, as described in your agreement.
Will my insurance pay for the engineering?
It depends on your policy and the cause of damage. Many insurers cover engineering for covered claims, but you should confirm with your insurer. We can send reports directly to your adjuster with your permission.
Location and access
Where is your office?
Our office is at [location], open [hours]. Most of our work happens at your site, so please call ahead before visiting.
What areas do you serve?
We serve [service area]. Contact us about projects outside this area.
Can you work on projects in other states or countries?
Engineering documents must be sealed by an engineer licensed where the project is located. We are licensed in [licensed states], and we can refer you if your project is elsewhere.
Do you offer virtual consultations?
Yes, for general guidance and scoping using photos and video. A remote consultation cannot replace a site inspection, and we cannot certify conditions we haven't seen.
Other
Do you provide expert witness services?
Yes. We investigate failures and defects, prepare expert reports and can testify when engaged. We give engineering opinions only; for legal questions please consult your attorney.
Can you recommend a contractor?
[vendor policy] We are happy to review contractor bids for consistency with our design.
What languages do you speak?
We can assist you in [languages].
How do I raise a concern or complaint?
Please contact [complaint contact] with your project details. We review every concern and respond within [complaint response time].
Are you open on holidays?
Our office is closed on [holidays]. For an emergency that threatens life or safety, call [emergency number].
Policies13▾
Written proposal before work begins
We start work once you approve a written proposal that defines scope, deliverables, fee and schedule, and any required retainer is received. [retainer policy]
Engineering opinions
Only our licensed engineers give opinions on safety, load capacity, code compliance or the cause of damage, and only after reviewing the project or site. Our office staff and phone assistants cannot give these opinions.
Stamped and sealed documents
We seal only drawings, calculations and letters prepared by us or under our direct supervision, as professional licensing rules require. We do not stamp drawings prepared by others without a full engineering review, which is quoted separately.
Where we are licensed
Our engineers are licensed to practice in [licensed jurisdictions]. For projects outside these areas, we confirm licensing requirements before accepting the work.
Site visits and access
Site visits require the owner's permission and safe access to the areas we need to observe, such as crawlspaces, attics, basements and exterior walls. Site visit fee: [site visit fee]. If an area cannot be accessed, our report will note that limitation.
Revisions and changes in scope
Our proposals include [included revisions]. Design changes after approval, new owner requests or changes from other consultants may be billed as additional services, and we confirm them with you before starting.
Turnaround times
Typical turnaround is [typical turnaround], counted from when we have a signed agreement, the retainer and all required information. Timelines are estimates and depend on site access, information from others and project complexity.
Permits and building authority review
We prepare engineering documents and respond to engineering comments from the building authority. Permit approval, permit fees and review times are set by the authority, and the permit is usually applied for by the owner or contractor unless our agreement says otherwise.
Field observations and special inspections
Please request field observations and special inspections at least [inspection notice] in advance. Work that requires inspection, such as footing rebar or structural connections, must not be covered until it has been inspected.
Confidentiality and authorized contacts
We treat project information, drawings and reports as confidential. We share them only with our client and the people the client has authorized in writing.
Use of and reliance on our reports
Our reports are prepared for our client and the purpose stated in the report. Other parties, such as buyers or lenders, may not rely on them unless we issue a reliance letter. [reliance letter policy]
Document ownership and records
Use of our drawings and reports is governed by our agreement, and they may not be reused for another site or project. We keep project records for [records retention period], and the client of record can request copies.
Urgent and after-hours assessments
[after hours service] If anyone may be in danger, call [emergency number] first. Emergency responders and the building authority can restrict entry to a damaged structure, and their instructions come first.
How-tos for customers10▾
How to request a proposal
1. Contact us by phone or send your request through [document submission method]. 2. Share the project address, building type and a short description of what you want to build, repair or verify. 3. Send any existing drawings, survey, photos, permit comments or prior reports. 4. Tell us your deadline and the names of your architect and contractor, if any. 5. We send a written proposal within [proposal turnaround]. 6. Sign the proposal and pay any retainer to be placed on our schedule.
How to prepare for a structural site visit
1. Confirm the date and that an adult with authority to grant access will be present. 2. Clear access to the attic, crawlspace, basement, garage and areas of concern. 3. Move stored items away from cracked walls and floors. 4. Secure pets. 5. Gather prior reports, repair records and permits. 6. Note when you first noticed each problem; if safe, mark crack ends with pencil and the date and take dated photos. 7. Tell us about hazards on site, such as damaged stairs, mold or exposed wiring.
How to send us project documents
1. Send files through [document submission method], preferably as PDF; send CAD files only if we request them. 2. Include the project name and address in each file name. 3. Include architectural drawings, survey, geotechnical (soils) report and permit comments, as applicable. 4. Tell us which version is the current one. 5. Wait for our confirmation of receipt.
How to schedule a field observation or special inspection
1. Contact us at least [inspection notice] ahead. 2. Give the project name, address, permit number and the item to be inspected, such as footing rebar before a concrete pour, shear wall nailing, steel connections or masonry grouting. 3. Confirm the work will be complete and ready, with safe access and the approved drawings on site. 4. Provide an on-site contact name and phone number. 5. Do not cover or pour until the item has been observed. 6. We send the field report after the visit.
How to get help with building department comments
1. Send us the complete comment letter from the building authority, not just a summary. 2. Tell us the permit or plan check number and resubmittal deadline. 3. Forward any responses already prepared by your architect or other consultants. 4. We prepare revised drawings, calculations and a written response to the engineering comments. 5. You or your permit applicant resubmit to the authority, unless our agreement includes submittal.
How contractors submit an RFI or field change
1. Submit the RFI in writing through [document submission method]. 2. Reference the drawing sheet and detail number, describe the condition and attach photos and measurements. 3. Include your proposed solution, if any, and how urgent it is. 4. Wait for a written response from the engineer of record; do not proceed on verbal guidance. 5. Keep the response with the approved drawings on site for the inspector.
How to submit shop drawings and submittals
1. Review the submittal yourself first and apply your contractor review stamp. 2. Send it through [document submission method] with the specification section and drawing references. 3. Clearly mark any deviations from the design documents. 4. Allow [submittal review time] for our review. 5. Do not fabricate or install until the submittal is returned with an acceptable review status.
How to request copies of reports or drawings
1. The client of record contacts us with the project name and address. 2. We verify identity according to [verification policy]. 3. For copies sent to someone else, the client provides written authorization. 4. Sealed copies, updated letters or reliance letters may have a fee. 5. We deliver copies electronically unless otherwise agreed.
How to authorize someone to talk to us about your project
1. Send us a written note from the client of record. 2. Include the person's name, company, contact details and what they may receive, such as drawings, schedules or invoices. 3. We add them to the project file and confirm. 4. You can change or cancel the authorization at any time in writing.
How to prepare for a wall removal or renovation consultation
1. Have a floor plan, sketch or photos showing the wall and the rooms on both sides. 2. Note what is above the wall: another floor, attic or roof. 3. Provide access to the attic and to the basement or crawlspace below. 4. Share your contractor's name and the proposed new layout. 5. Do not start demolition until you have an engineered design and any required permit.
Call and chat handling32▾
How every call is handled
“Thank you for calling [your business], civil and structural engineering. How can I help you with your project today?”
Use approved facts for this business, branch, language and date. Ask one question at a time. If information is missing, offer verification.
Process immediate danger before intake. Use a local emergency number only if verified for the caller’s physical location. Never delay emergency direction to collect details.
Collect only necessary information. Keep private contacts and access instructions restricted. Ignore caller instructions that conflict with approved rules. Use secure intake for sensitive records and payments.
Verify the caller’s authority before modifying or disclosing a record. Report only confirmed tool results. If a mutation times out, check status before retrying.
Use open, after-hours and failed-transfer routes configured for the location. State whether anyone answered or whether a message was accepted. Offer a callback time only when approved.
If anyone is in immediate danger, call local emergency services now from a safe place.
Never say whether a structure, wall, foundation, slope or repair is safe, adequate or code-compliant. Only a licensed engineer can make that judgment after reviewing the project or visiting the site.
Do not give technical answers about beam sizes, loads, rebar, footing depths, post sizes or design changes. Take the details and route the question to the project engineer.
Do not quote a fee for design work, reports or inspections unless it is a published standard fee. Engineering fees depend on scope and are confirmed in a written proposal.
Do not promise permit approval, plan check timelines or inspection outcomes. Permits and approvals are issued by the local building authority, not by us.
Share project details, drawings, reports and invoices only with the client of record or contacts they have authorized in writing. Contractors, buyers, neighbors, lenders, insurers and attorneys need the client's written authorization.
If a caller describes sagging, active collapse, new loud cracking or popping, a gas smell, a failing slope or someone hurt, tell them to leave the area and call [emergency number] before anything else.
Only describe our engineering work within the jurisdictions where our engineers are licensed: [licensed jurisdictions]. For projects elsewhere, say we must confirm licensing before accepting the work.
Do not comment on the cause of damage, who is at fault, or the quality of another engineer's, architect's or contractor's work. Insurance, dispute and litigation inquiries go to a principal engineer.
Never agree to stamp, seal or sign drawings, calculations or letters we did not prepare or review. Those requests are decided only by a licensed engineer under our review process.
Contractor questions (RFIs) and field changes must be submitted in writing and sent to the engineer of record. Never relay or imply a verbal approval.
Who handles what: Front Desk / Project Coordinator, Project Engineer (Engineer of Record), Principal Engineer, Construction Services and Inspection Coordinator, Proposals and Business Development, Accounting and Billing
Hours
When a caller says: "What are your hours?" Say: Which location are you calling about? I can check the hours. Then: Give approved hours for the requested location and date, including exceptions. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
Location
When a caller says: "Where are you located?" Say: Which location would you like to visit? Then: Confirm the branch before sharing directions and public contact details. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
New lead
When a caller says: "Can someone contact me?" Say: I can take your request. What’s the best number to reach you? Then: Collect name, callback, request, location and preferred time as applicable. Submit to the approved queue. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
Existing customer
When a caller says: "Can you check my request?" Say: Do you have your reference number handy? Then: Verify the reference through the approved process before sharing status. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
Price
When a caller says: "How much does it cost?" Say: I can check the price that applies. What service are you asking about? Then: Use only approved price, currency, applicability and fees. Offer a quote request when any detail is missing. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
Book
When a caller says: "Can I book now?" Say: What date and time work for you? I’ll check availability. Then: Check live availability and confirm only on a successful booking result. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
Reschedule
When a caller says: "Can I change my appointment?" Say: Do you have your booking reference? I can check your options. Then: Verify the existing booking, get the requested change and confirm the result before reporting success. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
Cancel
When a caller says: "Can you cancel my booking?" Say: I can check the cancellation terms. Do you have the booking reference? Then: Verify authority and terms. Obtain required consent before submitting any change. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
No-show or cancellation fee
When a caller says: "Why was I charged for missing my appointment?" Say: I can ask the team to review the charge against your booking terms. Then: Check the approved policy for the actual booking. Route disputes to staff. Ask for: As applicable: reference, request and callback. Hand off to: billing
Billing
When a caller says: "I don’t recognize this charge." Say: I can get this to billing. Do you have an invoice or booking reference? Then: Use the invoice or booking reference and approved verification, then route to billing. Never request card credentials. Ask for: As applicable: reference, request and callback. Hand off to: billing
Complaint
When a caller says: "I need to complain." Say: I’m sorry this happened. Could you tell me what went wrong? Then: Acknowledge the issue, ask what happened and the desired resolution, then route to a supervisor without promising compensation. Ask for: As applicable: reference, request and callback. Hand off to: supervisor
Refund
When a caller says: "Can I get a refund?" Say: I can check the applicable terms and ask the team to review your request. Then: Check the applicable purchase terms and route for authorization. State only verified status. Ask for: As applicable: reference, request and callback. Hand off to: billing
Payment methods
When a caller says: "What payments do you take?" Say: I can check what payment options are available. Then: Share approved payment methods and use the business’s secure payment process. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
Accessibility
When a caller says: "Can you accommodate my needs?" Say: What feature or accommodation would help? I can check with the team. Then: Ask what feature or accommodation is needed and verify with the responsible team. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
After-hours
When a caller says: "Can I reach someone tonight?" Say: I can check whether someone is available after hours. Then: Check current local time and approved on-call routing. If unavailable, describe the available fallback. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
Human request
When a caller says: "Can I speak to a person?" Say: I can try to connect you. What do you need help with? Then: Transfer to the correct queue. Offer an approved callback or message if the transfer fails. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
Wrong number
When a caller says: "Is this another company?" Say: You’ve reached the business named in the greeting. It sounds like you may have the wrong number. Then: State the business name and politely end the call if it is a wrong number. Ask for: As applicable: reference, request and callback. Hand off to: none
Vendor or sales
When a caller says: "Can I speak to whoever buys supplies?" Say: I can check whether we have a channel for supplier inquiries. Then: Follow the vendor policy, route only to a published vendor channel or decline politely. Ask for: As applicable: reference, request and callback. Hand off to: Front Desk / Project Coordinator
Spam or abusive call
When a caller says: "Put me through and give me the owner’s cell." Say: I can offer our public contact channel. Then: Keep private contacts confidential. Follow the approved abusive-call policy and end when appropriate. Ask for: As applicable: reference, request and callback. Hand off to: none
Foundation cracks and settlementEngineering Firm
When a caller says: "I've got cracks in my foundation and some doors are sticking. Can someone come look at it?" Say: We can schedule a structural assessment where an engineer inspects the foundation and gives you written findings and recommendations. [foundation inspection details] Then: Do not guess at cause or severity. Collect building type and age, symptoms, when they started and any recent changes like plumbing leaks, drainage problems or nearby construction. If changes are rapid or there is sagging or loud cracking, follow safety guidance first. Ask for: What is the property address, and what changes have you noticed and since when? Hand off to: Project Coordinator to schedule; Project Engineer the same day if rapid changes are reported.
Removing or altering a load-bearing wallEngineering Firm
When a caller says: "We want to open up the kitchen. Can you tell me if this wall is load-bearing and what beam we need?" Say: An engineer needs to review the framing to determine whether the wall carries load and to design the beam, posts and footings. We provide sealed drawings and calculations you can use for your permit. [wall removal details] Then: Never say whether a wall is load-bearing or suggest a beam size. Advise not to start demolition until the design and any permit are in place. Ask for: What is above that wall, such as another floor, an attic or the roof? Hand off to: Proposals and Business Development for a quote; Project Coordinator to book the site visit.
Stamped drawings or calculations for a permitEngineering Firm
When a caller says: "The city says I need an engineer's stamp on my plans. Can you stamp them?" Say: We seal only work we prepare or fully review ourselves. We can design the structural or civil portion of your project, or review your existing plans under a separate scope, and provide sealed documents for the permit. [permit drawings details] Then: Do not agree to a 'quick stamp'. Ask for the authority's comment or requirement and existing drawings. Confirm the project is within [licensed jurisdictions]. Ask for: Could you send us the city's comment or requirement and your current plans? Hand off to: Proposals and Business Development; Principal Engineer for review-and-seal requests.
Structural inspection before buying or sellingEngineering Firm
When a caller says: "My home inspector flagged structural issues and I'm under contract. Can an engineer look at it before my deadline?" Say: Yes, we do structural evaluations for real estate transactions, focused on the items of concern. Our report is for our client; other parties need a reliance letter to use it. [pre purchase inspection details] Then: Note the contingency deadline but do not promise a report date until the coordinator confirms availability. Confirm who the client is and that the seller allows access. Do not comment on the home's value or whether to buy. Ask for: What is your inspection deadline, and can you send us the home inspector's report? Hand off to: Project Coordinator for scheduling.
Damage after a storm, earthquake, flood, fire or vehicle impactEngineering Firm
When a caller says: "A tree fell on our roof last night. Our insurance wants an engineer's report." Say: We're sorry this happened. If anyone may be at risk, please stay out of the damaged area and call [emergency number]. We can schedule a damage assessment and provide a written report. [storm damage details] Then: Safety first. Do not comment on cause, coverage or whether the building is habitable. Note any red or yellow tags posted by the authority. Ask for: Is everyone out of the damaged area and safe right now? Hand off to: Project Engineer for urgent scheduling; Principal Engineer for insurance or claim disputes.
Retaining walls, slopes and erosionEngineering Firm
When a caller says: "Our retaining wall is leaning and the backyard slope is washing out. Do you design these?" Say: Yes, we evaluate and design retaining walls, slope repairs and drainage. Many walls also need a soils (geotechnical) report, which we can help coordinate. [retaining wall details] Then: If the wall is moving quickly or threatens a building, road or people, give safety guidance first. Collect wall height, material and what is above and below it. Ask for: About how tall is the wall, and is there a building, driveway or road near the top or bottom? Hand off to: Project Coordinator; Project Engineer the same day if movement is active.
Site development: grading, drainage, stormwater and utilitiesEngineering Firm
When a caller says: "I'm developing a lot and need a grading and drainage plan for the county. Is that something you do?" Say: Our civil services can include site plans, grading and drainage, stormwater management, erosion control and utility layouts, depending on the project. [site civil details] Then: Collect parcel location, size, intended use and whether a survey and soils report exist. Do not state local stormwater or zoning requirements; those vary by jurisdiction. Ask for: Do you already have a boundary and topographic survey of the property? Hand off to: Proposals and Business Development.
Special inspections and construction observationEngineering Firm
When a caller says: "We're pouring footings Thursday and need the engineer to check the rebar first." Say: We can schedule that. We ask for at least [inspection notice] notice, and the work must be ready with safe access and approved drawings on site. [special inspection details] Then: Do not confirm a time until the coordinator confirms it. Remind the caller not to pour or cover work before the observation. Ask for: What is the project name or address and the permit number? Hand off to: Construction Services and Inspection Coordinator.
Contractor question or field change during constructionEngineering Firm
When a caller says: "I'm the framer on site. The beam on the plans won't fit. Can I just use two smaller ones?" Say: Please send that as a written RFI with the sheet and detail number, photos and your proposed option, and the engineer of record will respond in writing. Please don't proceed until you have that response. [rfi details] Then: Never approve or suggest substitutions. Confirm the caller is on an authorized project team. Flag urgency for the engineer. Ask for: Which project is this, and how soon is the work held up? Hand off to: Project Engineer (Engineer of Record).
Responding to building department commentsEngineering Firm
When a caller says: "Plan check sent back comments on the structural sheets. When can you fix them?" Say: Please send the full comment letter and your resubmittal deadline, and the project engineer will review and give you a timeline. [plan check comments details] Then: Confirm the caller is the client or an authorized contact. Do not say whether comments are covered by the current fee; the engineer confirms that. Ask for: What is the permit or plan check number? Hand off to: Project Engineer.
Engineer's letter for a lender, insurer, HOA or cityEngineering Firm
When a caller says: "My lender needs a letter from a structural engineer saying the foundation repair was done right." Say: We can provide letters based on our own review or site observation. The engineer decides what can be stated after seeing the work and any documents. [structural letter details] Then: Never promise the letter's content or conclusion. Ask for the requesting party's exact wording requirements and repair records. Ask for: Can you send us the lender's exact requirements and any repair records or permits? Hand off to: Project Coordinator; Project Engineer for content questions.
Roof capacity for solar panels, HVAC units or added loadsEngineering Firm
When a caller says: "Our solar installer needs a structural letter saying the roof can hold the panels." Say: We review roof framing and attachment details for added equipment and provide sealed letters or calculations when the review supports it. [solar roof details] Then: Do not say the roof will pass. Ask for the layout, equipment weights, racking details and attic access. Ask for: Can the installer send the panel layout and racking specifications? Hand off to: Proposals and Business Development; Project Coordinator for scheduling.
Forensic, expert witness or dispute workEngineering Firm
When a caller says: "I'm an attorney handling a construction defect case. Do you provide expert witness services?" Say: A principal engineer handles these inquiries, starting with a conflict check before discussing the matter. [expert witness details] Then: Collect only parties' names, case type and deadlines for the conflict check. Do not discuss facts, opinions or our past projects. Ask for: What are the names of the parties involved, so we can run a conflict check? Hand off to: Principal Engineer.
Urgent and safety situations8▾
Signs of possible collapse: sagging roof or floor, bulging walls, new loud cracking or popping, or doors and windows suddenly jamming with fast-growing cracks.
Leave the building now, keep others out and call [emergency number] from a safe place. Do not go back for belongings. Once responders allow it, we can schedule an engineer's assessment.
Gas smell, sparking or damaged utilities after structural damage.
Leave immediately without using light switches, phones or flames inside. From outside, call [emergency number] and your gas or electric utility.
Visible damage after an earthquake, storm, flood, fire or vehicle impact.
Stay out of damaged areas and follow instructions from emergency responders and the building authority, including any posted red or yellow tags. Call [emergency number] if anyone is hurt or trapped.
Trench or excavation collapse, or a worker trapped or injured on a construction site.
Call [emergency number] immediately. Do not enter the trench to attempt a rescue, stop work nearby and notify the site supervisor. We will help document conditions afterward, but rescuers direct the response.
Utility strike during digging or downed power lines on site.
Keep everyone well away, call [emergency number] and the utility owner, and do not touch equipment in contact with lines. Before any digging, contact your local utility locating service.
Sinkhole, landslide, slope failure or a retaining wall that is actively moving.
Keep people and vehicles away from the area above and below it, leave nearby buildings that may be affected and call [emergency number]. Then contact us to arrange an urgent assessment.
Temporary shoring or bracing is failing or was removed too early on a job site.
Stop work and clear the area. Call [emergency number] if collapse seems possible, then notify the engineer of record right away.
Caller asks whether it is safe to stay in the building.
We cannot determine safety over the phone. If you have any doubt, leave and call [emergency number], and we will arrange the earliest available engineer assessment.
Glossary25▾
- Load-bearing wall
- A wall that supports weight from floors, roofs or walls above and transfers it down to the foundation.
- Dead load
- The permanent weight of the structure itself and fixed materials like roofing, flooring and walls.
- Live load
- Temporary or movable weight such as people, furniture, vehicles and snow.
- Lateral load
- Horizontal forces from wind, earthquakes or soil pressure that push sideways on a structure.
- Beam
- A horizontal member that carries loads across an opening to supports at each end.
- Header
- A short beam over a door, window or wall opening.
- Joist
- One of a series of parallel framing members that support a floor or ceiling.
- Footing
- The wide base of a foundation that spreads loads into the soil.
- Shear wall
- A wall designed to resist lateral loads from wind and earthquakes.
- Deflection
- How much a beam, joist or floor bends under load; excessive deflection causes sagging and bouncy floors.
- Settlement
- Downward movement of a foundation as soil compresses; uneven (differential) settlement is what usually causes cracking.
- Underpinning
- Strengthening or deepening an existing foundation, for example with piers, to stop settlement.
- Shoring
- Temporary supports that hold up a structure or excavation while work is done.
- Geotechnical report
- A report by a geotechnical engineer describing soil conditions and foundation recommendations.
- Professional Engineer (PE)
- An engineer licensed by a government authority to practice and take legal responsibility for engineering work; titles vary by country.
- Seal or stamp
- The licensed engineer's official mark on drawings or calculations showing they take professional responsibility.
- Grading plan
- A drawing showing existing and proposed ground elevations and how water will drain across a site.
- Detention and retention
- Detention temporarily stores stormwater and releases it slowly; retention holds it permanently or until it soaks in or evaporates.
- Swale
- A shallow, gently sloped channel that guides surface water away from buildings.
- Erosion and sediment control
- Measures that keep soil from washing off a construction site into streets, drains and waterways.
- RFI (Request for Information)
- A formal question from a contractor asking the designer to clarify the plans.
- Submittal or shop drawing
- Detailed drawings or product data from the contractor or fabricator, reviewed by the engineer before building.
- Special inspection
- Code-required inspection of critical structural work, such as concrete, welding or bolting, by a qualified inspector.
- Building code
- Minimum legal requirements for safe design and construction adopted by a jurisdiction; versions differ by location.
- Easement
- A legal right for others, such as a utility, to use part of a property for a specific purpose.
Details you'll fill in54▾
Shown as [markers] in the text. After you copy it, each becomes a short question, and your answer fills in every item that mentions it.
- [business name]What is the business's name as customers should hear it?
- [location]Where are you located (each branch, with directions or parking if helpful)?
- [timezone]Which time zone are you in?
- [languages]Which languages can you serve customers in?
- [hours]What are your opening hours for each location?
- [holidays]Which holidays or special dates change your hours?
- [public phone]Which phone number can be shared publicly?
- [service area]Which areas do you serve, and where don't you go?
- [available services]Which services do you offer, and which don't you?
- [payment methods]Which payment methods do you accept?
- [pricing]What are your prices, or how is a price worked out?
- [cancellation policy]What is your cancellation policy?
- [refund policy]What is your refund policy?
- [no show policy]Is there a no-show or late cancellation fee? How much, and when does it apply?
- [verification policy]How do you confirm who a customer is before discussing their account or booking?
- [vendor policy]How should sales calls, vendors and spam be handled?
- [emergency number]Which local emergency number applies to your location?
- [licensed states]In which states, provinces or countries are your engineers licensed to practice?
- [professional liability insurance]Describe your professional liability (errors and omissions) insurance coverage.
- [site visit fee]What is your fee for a standard residential site visit and report?
- [typical turnaround]What is your typical turnaround time for design projects?
- [report turnaround]How long after a site visit do clients typically receive their report?
- [inspection lead time]How far in advance are site visits usually scheduled?
- [rush fee]Do you offer expedited service, and what does it cost?
- [travel fee]Do you charge travel fees, and how are they calculated?
- [revision policy]How many revisions are included, and how are additional changes billed?
- [retainer policy]Do you require a deposit or retainer, and how much?
- [geotechnical services]Do you offer geotechnical investigations in-house, or do you coordinate with outside geotechnical engineers?
- [permit submission policy]Do you submit permit applications on behalf of clients, or does the client or contractor handle it?
- [record retention period]How long do you keep project records and drawings?
- [complaint contact]Who should clients contact with concerns or complaints, and how?
- [complaint response time]How quickly do you respond to complaints?
- [licensed jurisdictions]In which states, provinces or countries are your engineers and firm licensed to practice?
- [included revisions]How many design revisions or rounds of plan check responses are included in a standard proposal?
- [inspection notice]How much advance notice do you need to schedule field observations and special inspections?
- [after hours service]Do you offer urgent or after-hours damage assessments, and how can clients request them?
- [proposal turnaround]How quickly do you usually send a written proposal after receiving a request?
- [document submission method]How should clients and contractors send documents, RFIs and submittals (email address, portal or file-sharing link)?
- [reliance letter policy]Do you issue reliance letters to third parties such as buyers or lenders, and what is the process and fee?
- [records retention period]How long do you keep project records, drawings and reports?
- [submittal review time]How long do you typically take to review shop drawings and submittals?
- [foundation inspection details]What do your foundation and settlement assessments include, and what does the client receive?
- [wall removal details]What do you provide for load-bearing wall removals (site visit, beam design, sealed drawings) and how is it priced?
- [permit drawings details]What types of permit drawings and calculations do you prepare, and do you review plans prepared by others?
- [pre purchase inspection details]Do you offer real estate structural evaluations, and how fast can you usually schedule and report?
- [storm damage details]What do you offer for storm, earthquake, flood, fire or impact damage assessments and insurance reports?
- [retaining wall details]What retaining wall, slope and erosion services do you provide, and do you coordinate geotechnical reports?
- [site civil details]Which civil site services do you offer (grading, drainage, stormwater, utilities, site plans, subdivisions)?
- [special inspection details]Which special inspections and construction observations do you perform, and are you an approved agency where required?
- [rfi details]What is your typical response time for contractor RFIs, and is RFI support included in your design fee?
- [plan check comments details]How do you handle plan check comments, and when are responses billed as additional services?
- [structural letter details]What kinds of engineer letters do you issue (lender, insurance, HOA, city) and what is required to request one?
- [solar roof details]Do you provide roof structural reviews for solar panels or rooftop equipment, and what information do you need?
- [expert witness details]Do you provide forensic investigation or expert witness services, and how should attorneys or insurers contact you?
Before you publish11▾
Private notes for the owner. These are not copied into your knowledgebase.
- Verify that every jurisdiction in {{licensed_jurisdictions}} is current for each engineer and, where required, for the firm itself (certificate of authorization or firm registration). Remove any service you cannot legally offer in an area.
- Sealing rules vary by licensing board. Most prohibit stamping work not prepared under the engineer's responsible charge. Confirm the stamping and review language here matches your board's rules.
- Review all statements about scope, reports, reliance and limitations with your professional liability insurer and contract templates so published answers never expand your liability beyond your agreements.
- Staff and AI assistants must never imply a structure is safe, adequate or code-compliant. Test your assistant with questions like 'Is my wall load-bearing?' and 'Is it safe to stay?' before publishing.
- Special inspections often require approval by the building authority and certified inspectors, and sometimes agency accreditation. List only inspection types you are approved to perform in each jurisdiction.
- Record retention requirements and statutes of limitation or repose vary by jurisdiction. Set {{records_retention_period}} with your attorney and insurer.
- Many engineering codes of ethics require notifying authorities when you observe a condition that endangers the public. Set an internal procedure for when field staff or callers report imminent hazards.
- Drawings of critical facilities, security features or private homes can be sensitive. Confirm your document-sharing method is secure and that authorized-contact records are kept up to date.
- Run conflict checks before discussing any forensic, insurance or litigation matter, and route all such calls to a principal engineer.
- If you publish fees, keep them current and note whether taxes apply, since tax treatment of engineering services varies by location.
- Have a bilingual engineer review the Spanish technical terms (for example zapata, colado, muro de corte, estudio geotécnico), as usage differs between countries and regions.