knowledgebase.org

Hardwood refinishing and restoration

[business name] brings existing hardwood floors back to life: full sanding and refinishing, stain color changes, screen and recoat maintenance coats, board and plank repairs, gap and pet stain treatment, and finish restoration for solid and engineered wood.

Who it's for: Homeowners uncovering hardwood under carpet, sellers preparing a home for listing, buyers updating before move-in, landlords between tenants, owners of older homes with worn or damaged floors, and businesses with wood floors needing periodic recoats.

Builds on the Flooring knowledgebase: the items specific to this specialty come first, followed by everything in Flooring.

Free. Sign in to make your copy.

Use this knowledgebase
Services33▾
Full sand and refinish

Sanding down to bare wood, then applying new stain (optional) and protective finish coats.

Details: Typically a coarse-to-fine sanding sequence with a drum or belt sander, edger and buffer, followed by [standard finish coats] coats of finish. Removes most scratches, wear and old finish; deep gouges, pet stains or water stains may remain visible.

Screen and recoat (buff and coat)

Lightly abrading the existing finish and adding a fresh topcoat without sanding to bare wood.

Details: Best for floors with dull, lightly scratched finish that is still intact. Cannot fix gray worn areas, deep scratches or color changes. Floors with wax, or some factory finishes and polish products, may not accept a recoat; we test adhesion first.

Stain color change and custom color samples

Changing the floor's color with stain after sanding, with on-floor samples to choose from.

Details: Stain looks different on each species and floor, so we apply test swatches on your sanded floor before final application. Some species such as maple and birch can blotch with dark stains; water-popping or conditioners may be used.

Finish options

Choice of water-based polyurethane, oil-based polyurethane, hardwax oil or penetrating oil finishes in various sheens.

Details: Water-based dries fast, stays clearer and has lower odor; oil-based adds amber warmth and has longer dry and cure times; oils and hardwax oils give a natural look and allow spot repair but need more maintenance. Available finishes: [finish options].

Board replacement and lace-in repairs

Cutting out damaged, cracked, stained or rotted boards and weaving in matching boards.

Details: We source matching species, width and thickness when possible, including salvaged wood from closets or reclaimed suppliers. Repairs are usually blended by sanding and refinishing the whole room for an even color.

Pet stain and water stain treatment

Assessing dark stains and deciding between sanding, bleaching or board replacement.

Details: Surface white or gray marks usually sand out. Black stains from urine or long-term water often penetrate deep into the wood and typically require board replacement; we tell you honestly before work starts.

Gap filling and squeak reduction

Filling gaps, nail holes and cracks, and securing loose boards.

Details: Trowel filling or wood filler is used for small gaps and holes. Large seasonal gaps may reopen, and filler can crack as wood moves; slivers or board replacement may be better for wide gaps. Squeaks can sometimes be reduced by face-nailing or from below.

Refinishing floors uncovered under carpet

Removing carpet, pad, tack strip and staples, then restoring the hardwood beneath.

Details: Hidden floors often have staple holes, paint drips, pad stains and areas never finished. We assess after removal and may adjust the quote if hidden damage or patches are found.

Engineered hardwood refinishing

Light sanding or recoating of engineered floors with enough wear layer.

Details: Engineered floors can be sanded only if the top wood layer is thick enough, often about 2 mm or more, and usually only a limited number of times. We check wear layer thickness at a vent or edge first; thin veneers may only be recoated.

Dust containment sanding

Sanding with vacuum-connected equipment to reduce airborne dust.

Details: Reduces but does not eliminate dust; fine dust may still settle in the work area and nearby rooms. Availability: [dust containment available].

Borders, inlays and parquet restoration

Careful sanding and repair of patterned floors, borders, medallions and parquet.

Details: Mixed grain directions need extra sanding steps and hand work, so these floors usually cost more and take longer. Loose parquet blocks may need re-gluing.

Maintenance coat programs

Scheduled screen and recoat visits for homes and businesses to extend the life of the finish.

Details: Regular recoats before the finish wears through can delay the need for a full sanding. Recommended interval for typical homes: [recoat interval].

In-home measurement and estimate

We visit your home to measure the space, check the subfloor and give you a written quote.

Details: We measure each room, note doorways, stairs and transitions, check for moisture or uneven areas and discuss your goals and budget. Estimate fee: [estimate fee].

Showroom consultation and product selection

Visit our showroom to compare materials, colors and styles with a flooring specialist.

Details: We help you balance look, durability, water resistance, pets, kids and budget. Bring photos, paint or cabinet samples and room sizes if you have them. Brands we carry: [product brands].

Solid hardwood installation

Nail-down or glue-down installation of solid wood floors.

Details: Includes acclimation planning, moisture testing, underlayment where needed, expansion gaps and trim. Solid hardwood is generally not recommended below grade or over high-moisture slabs.

Engineered hardwood installation

Floating, glue-down or nail-down installation of engineered wood.

Details: Engineered wood handles humidity changes better than solid wood and can often go over concrete and in some basements, following the manufacturer's instructions.

Luxury vinyl plank and tile installation

Click-lock or glue-down installation of LVP and LVT.

Details: A water-resistant option for kitchens, bathrooms, basements and laundry rooms. The subfloor must be flat and clean, so leveling may be needed.

Laminate installation

Floating installation of laminate flooring over the right underlayment.

Details: Includes underlayment with vapor barrier when installed over concrete, expansion gaps and finishing trim.

Carpet installation

Wall-to-wall carpet with new padding, tack strip and power stretching.

Details: We plan seams to be as discreet as possible and stretch the carpet to reduce future wrinkles. Carpet tiles and stair runners are also available.

Ceramic and porcelain tile installation

Tile floors installed with proper backer, thinset and grout.

Details: Includes surface preparation, layout planning, leveling systems for large tiles, grouting and sealing where needed. Large-format tile requires a very flat subfloor.

Natural stone installation

Marble, travertine, slate, granite and limestone floors.

Details: Stone needs a rigid subfloor and usually sealing after installation and periodically afterward. Natural variation in color and veining is normal.

Sheet vinyl and linoleum installation

Seamless or low-seam resilient floors for kitchens, baths and laundry rooms.

Details: Installed loose-lay, perimeter-glued or fully adhered depending on the product. Requires a smooth subfloor because imperfections can show through.

Hardwood sanding and refinishing

Full sanding to bare wood, optional stain and new protective finish.

Details: Removes most scratches and wear. Whether a floor can be sanded depends on the remaining wear layer. We use dust containment systems where available and discuss finish options such as oil-based, water-based or hardwax oil.

Screen and recoat

Light abrasion and a fresh coat of finish without sanding to bare wood.

Details: A faster, lower-cost way to refresh floors with surface scuffs. It does not remove deep scratches, stains or color.

Old flooring removal and disposal

We tear out and haul away your existing floor covering.

Details: Covers carpet and pad, vinyl, laminate, wood and tile. Removal fee: [removal disposal fee]. Suspected asbestos-containing materials are not disturbed until properly tested.

Subfloor preparation and leveling

Repairing, flattening and preparing the base so your new floor performs well.

Details: May include self-leveling compound, grinding high spots, replacing damaged plywood, securing loose panels to reduce squeaks, and installing backer board.

Moisture testing

Measuring moisture in concrete and wood subfloors before installation.

Details: Excess moisture is a leading cause of cupping, mold and adhesive failure. We test according to the flooring manufacturer's requirements and recommend vapor barriers when needed.

Stair installation and refinishing

New treads, risers and nosings, or refinishing of existing wood stairs.

Details: Stairs are measured and quoted separately because each step requires individual cutting and fitting.

Baseboards, trim and transitions

Finishing pieces that cover gaps and join different floors.

Details: Includes quarter round, shoe molding, baseboard replacement, T-moldings, reducers, thresholds and stair nosings matched to your floor where available.

Floor repair

Fixing damaged sections without replacing the whole floor.

Details: Board or plank replacement, cracked tile replacement, carpet patching and re-stretching, and squeak repair. Exact color matching depends on available material and aging of the original floor.

Furniture and appliance moving

Moving furniture out of and back into the work area.

Details: Furniture moving: [furniture moving policy]. Appliances: [appliance moving policy]. Please remove small items, valuables and breakables yourself.

Commercial flooring installation

Flooring for offices, stores, restaurants, clinics and rental properties.

Details: Carpet tile, commercial LVT, rubber, sheet vinyl and tile. We can schedule around business hours when possible and coordinate with general contractors.

Concrete coatings

Epoxy, polyaspartic and polished concrete floors.

Details: Common in garages, basements and commercial spaces. Surface grinding and moisture checks are needed for good adhesion.

Frequently asked questions92▾

Services

Do I need a full refinish or just a screen and recoat?

If the finish is dull or lightly scratched but the wood isn't exposed, a screen and recoat is often enough. If you see gray, worn wood, deep scratches, or you want a new color, you need a full sand and refinish. We'll confirm at the estimate.

How many times can a hardwood floor be sanded?

Solid 3/4-inch hardwood can often be sanded several times over its life, depending on how much wood remains above the tongue. Engineered floors depend on the wear layer and may allow only one or two sandings, or none. We check before quoting.

Will sanding remove all scratches, dents and stains?

Sanding removes most surface scratches and wear. Deep dents, gouges and dark pet or water stains that go into the wood may still show and might need board replacement.

Can you get rid of black pet urine stains?

Black urine stains usually go deep into the wood and rarely sand out completely. Replacing the affected boards is typically the most reliable fix, and we'll show you options at the estimate.

Can you refinish engineered hardwood?

Often yes, if the wear layer is thick enough. We check its thickness first; if it's too thin, a screen and recoat may be the only safe option.

I found hardwood under my carpet. Can it be saved?

In many cases yes. Staple holes, pad stains and paint usually sand out or fill in, but we'll check for patches, damage and thickness once the carpet is up.

Can you refinish just one room or a damaged section?

Yes, but new finish on part of a connected floor may not match the rest in color or sheen. We usually recommend stopping at a natural break like a doorway or threshold.

Can you change the color of my floor?

Yes, with a full sand and new stain. We apply sample swatches on your sanded floor so you can choose the color in your own light before we stain the whole floor.

Can you make my floor gray, white or very dark?

Often yes, but results depend on the wood species. Red oak can push gray tones toward brown or pink, and maple can blotch with dark stains. Dark and very light floors also show dust and scratches more.

Which finish should I choose?

Water-based finishes stay clear, dry fast and have less odor; oil-based adds a warm amber tone and takes longer to cure; hardwax oils look natural and allow spot repairs but need more upkeep. We'll recommend one based on your home, pets and traffic.

What sheen should I pick?

Matte and satin are most popular because they hide scratches and dust better. Semi-gloss and gloss look shinier but show wear and imperfections more.

Will refinishing fix the gaps between my boards?

Small gaps and holes can be filled, but wood expands and contracts with the seasons, so filler in moving gaps may crack or pop out. For wide gaps we may suggest wood slivers or board repairs.

Can you fix cupped or buckled boards?

First the moisture source must be found and fixed and the floor allowed to dry. Sanding cupped boards too early can cause crowning later. Buckled boards usually need replacement.

What flooring is best for kitchens and bathrooms?

Tile, porcelain and luxury vinyl are popular because they handle spills and humidity well. Hardwood and many laminates are less forgiving of standing water, so we'll help you weigh the options.

Is laminate waterproof?

Some newer laminates are water-resistant for a limited time, but most are not fully waterproof. Always check the product's specifications and warranty, and wipe up spills quickly.

What flooring is best if I have pets?

Luxury vinyl, tile and laminate resist scratches and accidents well. If you prefer wood, harder species, matte finishes and textured surfaces hide wear better.

Can new flooring go over my existing floor?

Sometimes, if the old floor is flat, solid and compatible with the new product. Added height can affect doors, appliances and transitions, so we decide after inspecting it.

Can you install hardwood in a basement?

Solid hardwood is generally not recommended below ground level because of moisture. Engineered wood, luxury vinyl or tile are usually better choices, after a moisture test.

Can my old hardwood floors be refinished?

Most solid hardwood can be sanded several times, and some engineered wood can be sanded once or twice depending on its wear layer. We'll check the thickness and condition before recommending a full refinish or a screen and recoat.

Can you match my existing floor for a repair or addition?

We'll do our best, but an exact match isn't always possible because of discontinued products, dye lots and natural aging. Bringing a spare piece or a clear photo helps a lot.

Do you install flooring on stairs?

Yes, we install wood, vinyl, laminate and carpet on stairs, with matching nosings where available. Stairs are quoted per step because each one is cut and fitted individually.

Do you work on commercial projects?

Yes, we install flooring for offices, stores, restaurants and rental properties. Tell us your timeline and business hours so we can plan around them.

Prices

How is refinishing priced?

Usually by square foot, with extra charges for stain, additional coats, stairs, repairs and carpet removal. Our current rates: [refinishing price]. Screen and recoat costs [recoat price].

Is refinishing cheaper than new flooring?

In most cases refinishing costs considerably less than replacing hardwood, and it adds no new material. We can compare both options if your floor is near the end of its sandable life.

How much does new flooring cost?

It depends on the material, square footage, subfloor condition, removal, stairs and trim. [pricing] We give you a written quote after measuring.

Do you charge for estimates?

[estimate fee]

What's included in my quote?

Your quote lists materials, labor, underlayment, trim and transitions, plus removal, disposal, furniture moving and subfloor prep if needed. Ask us about any line you don't understand before you sign.

Why do I need to buy more material than my room size?

Cutting around walls, doorways and patterns creates waste, so installers typically add about 5-15% extra depending on the product and layout. Diagonal and herringbone patterns need more.

Could the price change after the work starts?

Sometimes hidden problems appear after the old floor comes up, such as rotted subfloor, water damage or uneven concrete. We'll stop, show you the issue and get your approval before doing any extra work.

Is there a minimum job size?

[minimum job size]

How long is my quote valid?

Quotes are valid for [quote validity], since material prices and availability can change.

Booking

How long does a full refinish take?

A typical job takes [refinish duration], depending on size, stain, repairs, finish type and humidity. Screen and recoat is usually [recoat duration].

Can I stay in my home during refinishing?

Sometimes, if you can live in rooms not being worked on and still reach them without crossing wet finish. With oil-based finishes or if you're sensitive to odors, many clients stay elsewhere for a few days.

Can you refinish in phases so I can keep using part of my home?

Yes, we can split the work into sections, though it may add time and cost and the sections need to meet at a logical break. We'll plan the sequence with you.

Does weather or humidity affect my schedule?

Yes. High humidity or cold slows drying, and finish manufacturers set temperature and humidity ranges. We may extend dry times or reschedule to protect the result.

How do I schedule a measurement or estimate?

Call us at [public phone] or visit us during [hours]. Have the rooms, approximate size and type of flooring you're considering ready if you can.

How soon can you install my floor?

Our typical lead time is [lead time]. Special-order products and busy seasons can take longer, and some materials need time to acclimate before installation.

How long does installation take?

A single room often takes a day, while a whole floor may take several days. Tile, glue-down floors, stairs, subfloor repairs and refinishing add time, and we'll give you an estimate with your quote.

Do I need to be home during installation?

An adult should be present at the start to confirm the plan and at the end for the final walkthrough. During the work, we just need access to the home, water and electricity.

Can I take samples home?

[sample policy] Seeing samples in your own lighting, next to your walls and furniture, is the best way to choose.

Can I reschedule my installation?

Yes, please let us know as early as possible. [cancellation policy]

Before your visit

Do I need to empty the rooms completely?

Yes, rooms being sanded must be fully empty, including rugs, plants and items in closets with floors being done. Our furniture moving policy: [refinish furniture policy].

Should I paint before or after refinishing?

Usually paint walls before refinishing so drips don't land on the new finish, then do final baseboard touch-ups after the floor cures. Sanding can scuff baseboard paint, so plan for touch-ups.

What about my HVAC during refinishing?

We may ask you to turn off forced-air heating or cooling during sanding and finishing to limit dust and help drying, then keep the home at a normal temperature. We'll give you exact instructions for your finish.

Do I need to do anything with pets and gas appliances?

Keep pets out of the home or fully separated until the finish can be walked on. With solvent-based finishes, pilot lights and open flames may need to be turned off; we'll tell you if that applies.

How should I prepare my home before installation?

Remove small items, valuables, breakables and wall decor from the work area, and empty closets if they're getting new floors. Keep heating or air conditioning running at normal living conditions so the material and home stay stable.

What is acclimation and do I need it?

Some products, especially wood, need to sit in your home for a period so they adjust to its temperature and humidity. We follow the manufacturer's instructions, which may mean delivering the material a few days early.

Do I have to remove the old flooring myself?

No, we can remove and dispose of it for you. [removal disposal fee]

Will you move my furniture and appliances?

Furniture: [furniture moving policy]. Appliances: [appliance moving policy]. Items like pianos, safes, aquariums and electronics should be handled by you or a specialist.

Will my doors or baseboards need work?

If the new floor is taller, doors may need trimming and baseboards may need to be removed or covered with quarter round. We'll point this out during the estimate.

Should kids and pets stay away during installation?

Yes, please keep them out of the work area. There are sharp tools, nails, adhesives and dust, and doors may be open during the day.

Will installation be noisy and dusty?

Yes, there will be noise from saws and nailers, and removal and sanding create dust. We use containment and clean up daily, but we recommend covering items in nearby rooms.

Afterwards

When can I walk on my refinished floor?

Usually in socks after [sock traffic time], and with shoes after [shoe traffic time], depending on the finish and conditions. Full cure takes longer.

When can I put furniture and rugs back?

Furniture can usually return after [furniture return time], lifted, not dragged, with felt pads. Wait [rug wait time] before laying rugs, since they can trap curing finish and mark it.

How do I clean the floor while the finish is curing?

Only dry dust mop or vacuum on a hard-floor setting during the cure period. Avoid wet mopping, cleaners and tape on the floor until fully cured.

There's a small bump, hair or speck in my finish. Is that normal?

Small dust nibs can happen because floors are finished on site, not in a factory, and are usually judged from a standing position in normal light. If something bothers you, send us a photo and we'll review it.

Why does my new finish look uneven or have swirl marks?

Some sheen variation can appear while the finish cures. Visible swirls, chatter marks or blotches after cure should be reported so we can inspect.

How often should I recoat my floors?

Most homes benefit from a screen and recoat every [recoat interval], before the finish wears through to bare wood. That can delay the need for another full sanding.

Which cleaning products should I avoid on refinished floors?

Avoid wax, oil soaps, acrylic polishes and 'shine restorer' products on polyurethane, since they can cause buildup and prevent future recoats. Use a pH-neutral cleaner made for finished wood.

When can I walk on my new floor and put furniture back?

Floating floors and carpet can usually be used right away. Glue-down floors, tile grout and refinished wood need curing time, often from 24 hours to several days, and we'll give you exact times for your product and finish.

How do I clean my new floor?

Sweep or vacuum regularly and use the cleaner recommended by the manufacturer. Avoid steam mops, excess water and harsh chemicals on wood and laminate unless the product specifically allows them.

How can I prevent scratches and dents?

Put felt pads under furniture legs, use doormats at entrances and keep pet nails trimmed. Lift heavy items instead of dragging them, and avoid rubber-backed rugs that can discolor some floors.

Why are there small gaps between my wood boards in winter?

Wood shrinks in dry air and expands in humid air, so small seasonal gaps are normal. Keeping indoor humidity steady, often with a humidifier, helps; contact us if gaps are large or don't close in warmer months.

My new carpet is shedding or has wrinkles. Is that normal?

Some shedding in the first weeks is normal and decreases with vacuuming. Wrinkles or ripples are not normal and may need re-stretching, so please call us.

Does tile or stone need sealing?

Natural stone and cement-based grout usually need sealing after installation and every so often afterward. Glazed porcelain and ceramic tile generally don't, but the grout may.

Safety

Is the dust from sanding harmful?

Wood dust can irritate eyes, lungs and allergies, so we use dust collection and ask you to stay out of work areas. In homes built before 1978, old finishes or paint may contain lead and need special handling.

Could my old flooring contain asbestos?

Some older vinyl tiles, sheet flooring and adhesives may contain asbestos, depending on age and region. Don't sand, scrape or break suspect materials; they should be tested by a qualified professional, and rules for removal vary by location.

Are finishes and adhesives safe to breathe?

Many products release odors and VOCs while curing, so we ventilate and can offer low-VOC options. People who are pregnant, have breathing conditions, or have young children or pets may want to stay elsewhere during refinishing; ask your doctor if you have concerns.

What if you find mold or water damage under my floor?

We'll stop work in that area, show you what we found and explain your options. The source of moisture should be fixed, and mold may need a remediation specialist, before new flooring goes down.

Are new floors slippery?

Some polished tile, stone and freshly finished floors can be slippery, especially when wet. We can recommend textured or slip-resistant options for bathrooms, entries and homes with older adults.

Policies

Do you guarantee the stain color will match my sample or another room?

Wood is natural, so color varies by species, age and grain even with the same stain. That's why we test on your floor and ask you to approve the color before we continue.

What does your refinishing warranty cover?

Our workmanship coverage: [refinish warranty]. Normal wear, scratches, pet damage, moisture problems and damage from improper cleaners are generally not covered.

Do you require a deposit?

[deposit policy] The deposit lets us order your materials and reserve your installation date.

What is your cancellation policy?

[cancellation policy] Special-order materials may not be cancelable once ordered.

Can I return unused flooring?

[refund policy] Unopened stock items are usually easier to return than special orders or cut carpet.

What warranty do I get?

Products carry the manufacturer's warranty, and our installation workmanship is covered by [installation warranty]. Manufacturer warranties often require following their care instructions, so keep your paperwork.

What happens to leftover material?

[leftover material policy] We recommend keeping a box or a few pieces for future repairs.

General

What types of flooring do you sell and install?

We offer [available services]. If you don't see what you need, ask us and we'll tell you if we can help.

Will you install flooring I bought somewhere else?

[customer supplied material policy] When we install customer-supplied material, the product warranty comes from the seller or manufacturer, not from us.

Are you licensed and insured?

[licensing info] [insurance info] Licensing requirements for flooring contractors vary by location, and we're happy to share proof of coverage on request.

Who does the installation?

[installer info] Your installer will review the job with you before starting and at the end.

Which brands do you carry?

We carry [product brands]. We can also special-order many other products.

Payments

What payment methods do you accept?

We accept [payment methods].

Do you offer financing?

[financing options] Approval and terms depend on the financing provider.

When is the final payment due?

[final payment terms] We'll do a walkthrough with you first so you can point out anything that needs attention.

Location and access

Where is your showroom and when are you open?

We're located at [location] and open [hours]. We're closed on [holidays].

What areas do you serve?

We install in [service area]. If you're outside this area, call us and we'll let you know if we can help.

Do you deliver materials?

[delivery policy] For installations, materials are usually delivered before or on the install date, depending on acclimation needs.

Other

What should I do if I have a problem after installation?

Call us at [public phone] and send photos of the issue. We'll review it, arrange an inspection if needed and explain what the warranty covers.

My floor was damaged by a leak or flood. What should I do?

First stop the water and, if there's any electrical or safety risk, stay away and call [emergency number]. Then call a plumber or water-damage specialist and your insurer, and contact us to assess and replace the flooring once things are dry.

Can you help with an insurance claim?

We can provide measurements, a written estimate and photos for your claim. Coverage decisions are made by your insurance company, so check your policy with them.

How do I make a complaint?

We want to make it right. Contact us at [public phone] with your name, address and job details, and we'll respond as soon as possible.

Policies21▾
Stain approval

We apply stain samples on your sanded floor and need your approval, in person or by photo, before staining the full area. Color changes after approval may add cost and time: [restain fee].

Limits of refinishing

Refinishing improves but cannot make an old floor new. Deep stains, dents, gaps, prior repairs, color variation and natural character may remain. We point out known limits in your estimate.

Finish inspection standard

Site-applied finishes are inspected from a standing position in normal lighting. Minor dust nibs or slight sheen differences not visible this way are considered normal. Report concerns within [finish report window].

Home conditions during and after work

Rooms must be empty and the home kept within the temperature and humidity range we give you. Damage from entering wet finish, pets, early furniture return or rugs placed too soon is not covered.

Hidden conditions and repairs

If sanding reveals hidden damage, rot, thin boards, exposed nails or old patches, we stop and discuss options and any change in price before continuing.

Recoat eligibility

A screen and recoat requires an intact finish without wax or incompatible polishes. If an adhesion test fails, a full refinish may be needed; any test fee: [adhesion test fee].

Measurements and estimates

We measure on site before giving a final installed price. Measurement visits: [measure fee]. Written quotes are valid for [quote valid days].

Deposits and payment

A deposit of [deposit amount] is required to order materials and reserve installation. The balance is due [balance due terms]. We accept [payment methods].

Returns and special orders

Unopened full boxes of stocked products may be returned within [return window], subject to a restocking fee of [restocking fee]. Special orders, cut carpet and remnants are not returnable. See [refund policy].

Overage and leftover material

We order extra material, usually 5–15% depending on the product and layout, for cuts, pattern matching and waste. We recommend keeping a few leftover boxes for future repairs, since dye lots and styles change.

Acclimation and home conditions

Some products must sit in your home before installation, as the manufacturer requires. Your heating or air conditioning must be running at normal living conditions before, during and after installation.

Subfloor preparation

Subfloors must be flat, dry, clean and sound to meet manufacturer requirements. Leveling, repairs or moisture barriers are quoted separately; if we find issues after removing old flooring, we explain them and get your approval before extra work.

Old flooring removal and disposal

[removal disposal policy] Your quote lists whether removal and haul-away are included.

Furniture and appliances

[furniture moving policy] Please remove small items, breakables and electronics beforehand. Gas appliances must be disconnected and reconnected by a licensed professional.

Trim, transitions and doors

Your quote lists whether baseboards, quarter round, transitions and stair nosing are included. Doors may need trimming to clear the new floor. Painting and caulking touch-ups: [trim painting policy].

Warranties

Our installation is covered by our workmanship warranty: [workmanship warranty]. Product defects are covered by the manufacturer's warranty, which usually requires following its care and maintenance guidelines.

Customer-supplied materials

[customer supplied material policy] We cannot warranty products we did not supply.

Older homes: asbestos and lead

Older homes may have asbestos in old flooring or adhesive, or lead paint on trim. Testing may be required before work begins, and we follow the regulations that apply in your area, which can add time or cost.

Scheduling and delays

Installation dates are set once materials arrive. Supplier or shipping delays can happen, and we will let you know as soon as we hear. Rescheduling follows [cancellation policy].

Changes to your order

Changes to the product, rooms or scope after ordering need your written approval and may change the price and schedule.

Access on installation day

An adult 18 or older must be present at the start of the job and for the final walkthrough. Please keep children and pets away from work areas for their safety.

How-tos for customers16▾
Check if your floor needs a recoat or full refinish

1. Look at high-traffic areas for gray or bare wood. 2. Drop a little water on a worn area: if it beads, finish remains; if it soaks in and darkens, the finish is worn through. 3. Note deep scratches, stains or a desired color change. 4. Send photos to [public phone] or book an estimate.

Choose your stain color

1. Collect inspiration photos. 2. Narrow to 2-4 colors. 3. We apply samples on your sanded floor. 4. View them dry, in daytime and evening light, near walls and cabinets. 5. Approve one color in writing or by text before we continue.

Live around a refinishing project

1. Plan where you'll sleep, eat and keep pets. 2. Pack essentials from affected rooms. 3. Agree on entry routes and keys. 4. Follow HVAC and pilot light instructions. 5. Don't enter finished areas until we say it's safe. 6. Keep windows as directed for ventilation.

First 30 days after refinishing

1. Walk in socks until shoe traffic is allowed. 2. Put felt pads on furniture and lift, don't drag. 3. No rugs until [rug wait time]. 4. Dry dust mop only; no wet cleaning. 5. Don't tape anything to the floor. 6. Keep pet nails trimmed. 7. Report concerns with photos.

Check an engineered floor's wear layer

1. Remove a floor vent cover or find an exposed edge at a stair or threshold. 2. Look at the top wood layer above the plywood or core. 3. Photograph it with a ruler if possible. 4. Send photos so we can advise whether sanding is possible.

Prepare for your in-home measurement

1. Decide which rooms, closets and stairs you want included. 2. Clear a path to every area so we can reach walls and corners. 3. Have product ideas or samples handy. 4. Secure pets. 5. Note any past leaks, squeaks or soft spots. 6. Plan about [measure duration] for the visit.

Rough-measure for a budget estimate

1. Measure the length and width of each room at the longest points. 2. Multiply to get square feet or meters. 3. Add closets and hallways. 4. Count stairs separately. 5. Add about 10% for waste. 6. Remember we confirm final measurements on site before ordering.

Choose the right flooring for a room

1. Consider moisture: kitchens, baths, laundry and basements need water-resistant products. 2. Think about traffic, pets and children. 3. Check whether the area is below ground level or has radiant heat. 4. Set a budget including installation and prep. 5. Take samples home and view them in your own light. 6. Ask us about care requirements before deciding.

Borrow or take samples

1. Visit our showroom or ask your sales consultant. 2. Choose a few options to compare. 3. Review our sample terms: [sample policy]. 4. Look at them in daylight and at night, next to cabinets and walls. 5. Return borrowed samples or share your choice with your consultant.

Prepare your home for installation day

1. Remove small items, breakables, wall decor near work areas and closet floor contents. 2. Unplug and move electronics. 3. Arrange furniture and appliance moving per our policy. 4. Have gas appliances disconnected by a licensed pro if needed. 5. Keep heating or AC running. 6. Clear parking and a path for materials. 7. Plan for noise and some dust, and keep pets and children away.

What to expect on installation day

1. The crew lead walks through with you to confirm rooms, product, layout direction and transitions. 2. Old flooring is removed and the subfloor checked. 3. Any extra prep found is explained for your approval. 4. Installation and trim work are completed. 5. We clean up work debris. 6. You do a final walkthrough with the crew lead and note any concerns. 7. Leftover material is left with you or handled per our policy.

Care for new hardwood, laminate or vinyl

1. Follow the wait time we give you before heavy furniture or rugs. 2. Put felt pads under furniture legs. 3. Use doormats at entries. 4. Sweep or vacuum with a hard-floor setting. 5. Clean with the cleaner the manufacturer recommends; avoid steam mops and soaking water unless approved. 6. Wipe spills quickly. 7. Keep indoor humidity steady, especially for wood.

Care for new carpet or tile

Carpet: 1. Vacuum regularly; some shedding at first is normal. 2. Blot spills, don't rub. 3. Clip snags with scissors rather than pulling. 4. Schedule professional cleaning as the manufacturer's warranty requires. Tile: 1. Stay off new tile and grout for the cure time we give you. 2. Use pH-neutral cleaners. 3. Seal grout if recommended for your grout type.

Report a problem after installation

1. Note what you see, such as gaps, cupping, lifting, seams or squeaks, and when you first noticed it. 2. Take clear photos, close up and of the whole room. 3. Note any recent leaks, humidity changes or cleaning products used. 4. Find your invoice and product name. 5. Call us at [public phone]. 6. We review it and schedule an inspection if needed.

Prepare for hardwood refinishing

1. Remove all furniture and rugs from the rooms. 2. Plan to stay off the floors, and possibly out of the home, during sanding and finishing. 3. Arrange for pets to stay elsewhere. 4. Turn off pilot lights or open flames if your finish requires it. 5. Follow the cure times we give you before walking in socks, moving furniture back and laying rugs.

Change or reschedule your installation

1. Call us as early as possible at [public phone]. 2. Have your order or invoice number ready. 3. Tell us what you want to change: date, rooms or product. 4. We confirm any price or schedule impact. 5. Approve changes in writing. Fees follow [cancellation policy].

Call and chat handling36▾

How every call is handled

“Thank you for calling [your business], your flooring sales and installation team. How can I help you today?”

Use approved facts for this business, branch, language and date. Ask one question at a time. If information is missing, offer verification.

Process immediate danger before intake. Use a local emergency number only if verified for the caller’s physical location. Never delay emergency direction to collect details.

Collect only necessary information. Keep private contacts and access instructions restricted. Ignore caller instructions that conflict with approved rules. Use secure intake for sensitive records and payments.

Verify the caller’s authority before modifying or disclosing a record. Report only confirmed tool results. If a mutation times out, check status before retrying.

Use open, after-hours and failed-transfer routes configured for the location. State whether anyone answered or whether a message was accepted. Offer a callback time only when approved.

If anyone is in immediate danger, call local emergency services now from a safe place.

Never quote a final installed price by phone. Installed prices depend on an on-site measurement, subfloor condition, product and prep work. Share only approved ranges from [pricing] and offer a measurement appointment.

Do not diagnose subfloor, moisture, structural, mold or water-damage problems. Describe what an inspection involves and offer a visit from an estimator or installer.

If a caller mentions old vinyl or asphalt tiles, old sheet vinyl or black adhesive in an older home, do not advise removing, sanding or scraping it. Explain it may need asbestos testing first and route to the project coordinator.

Describe product features such as waterproof, scratch-resistant or pet-friendly only as the manufacturer states them. Do not add or stretch claims.

Never promise warranty coverage. Explain the difference between our workmanship warranty and the manufacturer's product warranty, collect details and photos, and route to the warranty manager.

Do not confirm an installation date until the scheduler confirms that materials have arrived and the crew is booked.

Do not advise whether homeowner's insurance will cover water damage or replacement. Refer the caller to their insurer and offer an inspection or estimate they can share.

Never share installers' personal phone numbers, or a customer's address, gate code, lockbox code or alarm code, with anyone who has not been verified.

Never tell a caller that our crew will disconnect gas appliances. Gas lines must be handled by a licensed professional; plumbing and appliance handling follows [furniture moving policy].

Do not treat a caller's own room measurements as final for ordering. Explain that we confirm measurements on site and include overage for cuts, pattern matching and waste.

Never promise that stains, gouges or pet damage will sand out or that a color will match exactly; say it will be confirmed on site and with stain samples.

Do not confirm that an engineered floor can be sanded until its wear layer has been checked.

Give walk-on, furniture and rug times only from the business's stated figures and note they depend on finish and humidity.

If a caller mentions cupping, buckling or active moisture, advise fixing the moisture source first and route to an assessment rather than booking a refinish.

For homes built before 1978, flag possible lead in old finishes or paint before sanding is booked.

Who handles what: Front desk and showroom coordinator, Flooring sales consultant, Estimator and measure technician, Installation scheduler and project coordinator, Installation crew lead, Warranty and customer service manager

Hours

When a caller says: "What are your hours?" Say: Which location are you calling about? I can check the hours. Then: Give approved hours for the requested location and date, including exceptions. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Location

When a caller says: "Where are you located?" Say: Which location would you like to visit? Then: Confirm the branch before sharing directions and public contact details. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

New lead

When a caller says: "Can someone contact me?" Say: I can take your request. What’s the best number to reach you? Then: Collect name, callback, request, location and preferred time as applicable. Submit to the approved queue. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Existing customer

When a caller says: "Can you check my request?" Say: Do you have your reference number handy? Then: Verify the reference through the approved process before sharing status. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Price

When a caller says: "How much does it cost?" Say: I can check the price that applies. What service are you asking about? Then: Use only approved price, currency, applicability and fees. Offer a quote request when any detail is missing. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Book

When a caller says: "Can I book now?" Say: What date and time work for you? I’ll check availability. Then: Check live availability and confirm only on a successful booking result. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Reschedule

When a caller says: "Can I change my appointment?" Say: Do you have your booking reference? I can check your options. Then: Verify the existing booking, get the requested change and confirm the result before reporting success. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Cancel

When a caller says: "Can you cancel my booking?" Say: I can check the cancellation terms. Do you have the booking reference? Then: Verify authority and terms. Obtain required consent before submitting any change. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

No-show or cancellation fee

When a caller says: "Why was I charged for missing my appointment?" Say: I can ask the team to review the charge against your booking terms. Then: Check the approved policy for the actual booking. Route disputes to staff. Ask for: As applicable: reference, request and callback. Hand off to: billing

Billing

When a caller says: "I don’t recognize this charge." Say: I can get this to billing. Do you have an invoice or booking reference? Then: Use the invoice or booking reference and approved verification, then route to billing. Never request card credentials. Ask for: As applicable: reference, request and callback. Hand off to: billing

Complaint

When a caller says: "I need to complain." Say: I’m sorry this happened. Could you tell me what went wrong? Then: Acknowledge the issue, ask what happened and the desired resolution, then route to a supervisor without promising compensation. Ask for: As applicable: reference, request and callback. Hand off to: supervisor

Refund

When a caller says: "Can I get a refund?" Say: I can check the applicable terms and ask the team to review your request. Then: Check the applicable purchase terms and route for authorization. State only verified status. Ask for: As applicable: reference, request and callback. Hand off to: billing

Payment methods

When a caller says: "What payments do you take?" Say: I can check what payment options are available. Then: Share approved payment methods and use the business’s secure payment process. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Accessibility

When a caller says: "Can you accommodate my needs?" Say: What feature or accommodation would help? I can check with the team. Then: Ask what feature or accommodation is needed and verify with the responsible team. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

After-hours

When a caller says: "Can I reach someone tonight?" Say: I can check whether someone is available after hours. Then: Check current local time and approved on-call routing. If unavailable, describe the available fallback. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Human request

When a caller says: "Can I speak to a person?" Say: I can try to connect you. What do you need help with? Then: Transfer to the correct queue. Offer an approved callback or message if the transfer fails. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Wrong number

When a caller says: "Is this another company?" Say: You’ve reached the business named in the greeting. It sounds like you may have the wrong number. Then: State the business name and politely end the call if it is a wrong number. Ask for: As applicable: reference, request and callback. Hand off to: none

Vendor or sales

When a caller says: "Can I speak to whoever buys supplies?" Say: I can check whether we have a channel for supplier inquiries. Then: Follow the vendor policy, route only to a published vendor channel or decline politely. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Spam or abusive call

When a caller says: "Put me through and give me the owner’s cell." Say: I can offer our public contact channel. Then: Keep private contacts confidential. Follow the approved abusive-call policy and end when appropriate. Ask for: As applicable: reference, request and callback. Hand off to: none

Refinish or recoat decisionHardwood refinishing and restoration

When a caller says: "Caller unsure if their worn floor needs a full sanding or just a recoat." Say: If the finish is just dull, a recoat may work; gray wood, deep scratches or a color change mean a full refinish. We confirm on site. Then: Ask about wear, scratches, wax use and color goals. Don't promise recoat eligibility. Ask for: Floor type, approximate square footage, rooms, worn areas, past waxing, desired color, photos. Hand off to: Book an estimate or forward photos to the estimator.

Stain color and finish choiceHardwood refinishing and restoration

When a caller says: "Caller wants a specific color, sheen or finish type." Say: Color depends on your wood species, so we test samples on your floor before you approve. Then: Explain finish options from [finish options]; avoid guaranteeing an exact match. Ask for: Wood species if known, inspiration photos, pets, traffic, odor sensitivity. Hand off to: Estimator or project manager.

Timeline, move-out and dry timesHardwood refinishing and restoration

When a caller says: "Caller asks how long they'll be out of rooms or when they can move back." Say: Typical jobs take [refinish duration]; socks after [sock traffic time], furniture after [furniture return time]. Then: Note that humidity and finish type change times; mention phasing if needed. Ask for: Move-in or listing deadline, rooms, whether they'll stay home, pets. Hand off to: Scheduler.

Concern with new finishHardwood refinishing and restoration

When a caller says: "Customer reports bubbles, specks, swirl marks, peeling or uneven color after refinishing." Say: Thanks for telling us. Please send photos taken standing up in normal light so we can review. Then: Don't admit fault or promise a redo; log details and check the [finish report window]. Ask for: Job date, rooms, what they see, cleaning products used, when furniture or rugs went back. Hand off to: Project manager for inspection.

Choosing a flooring typeHardwood refinishing and restoration

When a caller says: "What's the best floor for my kitchen? I have two big dogs and kids." Say: Great question. We carry [brands carried]. For busy, wet areas many people choose luxury vinyl or tile; our consultant can show you options that fit your home and budget. Then: Share general differences between hardwood, engineered wood, laminate, luxury vinyl, tile and carpet. Use only manufacturer claims. Offer a showroom visit, samples or a measurement. Ask for: Which rooms are you thinking about, and is any of it below ground level? Hand off to: Flooring sales consultant

In-home measurement and estimateHardwood refinishing and restoration

When a caller says: "Can you just tell me how much it'd cost to do about 800 square feet?" Say: Installed prices depend on the product, layout and subfloor, so we confirm them with a measurement. Measurement visits: [measure fee]. Then: Give only approved ranges from [pricing]. Explain that prep, removal, stairs and trim affect cost. Offer to book a measurement. Ask for: What type of flooring are you considering, and which rooms? Hand off to: Estimator and measure technician

Material lead times and order statusHardwood refinishing and restoration

When a caller says: "I paid my deposit two weeks ago. When is my floor coming in?" Say: Let me check the status for you. Once your material arrives, our scheduler will contact you to set an installation date. Then: Verify identity first. Share only confirmed arrival information. Explain that special orders and backorders can take longer. Never promise a date. Ask for: Could you give me the name and order number on the account? Hand off to: Installation scheduler and project coordinator

Removing old flooringHardwood refinishing and restoration

When a caller says: "Do you take out the old carpet, or do I have to do that? There's old tile under it too." Say: [removal disposal policy] If there is older tile or adhesive underneath, please don't remove it yourself until we check it, since some older materials need testing first. Then: Note the layers and age of the home. Flag possible asbestos for the coordinator. Explain removal is listed in the quote. Ask for: About what year was your home built? Hand off to: Estimator and measure technician

Subfloor, concrete and moisture concernsHardwood refinishing and restoration

When a caller says: "My basement is concrete and sometimes feels damp. Can you put flooring down there?" Say: Many basements can get new flooring, but moisture has to be checked first. Our estimator can test and recommend suitable products and any barrier needed. Then: Don't diagnose. Note signs like water stains, past flooding, efflorescence, musty smells or soft spots. Book an inspection. Ask for: Has that area ever had standing water or a leak? Hand off to: Estimator and measure technician

Moving furniture and appliancesHardwood refinishing and restoration

When a caller says: "Will your guys move my couch and fridge, and what about the toilet in the bathroom?" Say: [furniture moving policy] Gas appliances need a licensed professional to disconnect and reconnect them. Then: Explain what's included and what the customer must do. Note heavy or special items like pianos, aquariums, safes or gun cabinets for the estimator. Ask for: Are there any very heavy or delicate items in the rooms? Hand off to: Installation scheduler and project coordinator

Acclimation and wait timesHardwood refinishing and restoration

When a caller says: "The boxes were dropped off yesterday. Why can't you install today?" Say: Some products need to adjust to your home's temperature and humidity before installation, as the manufacturer requires. This helps prevent gaps and buckling later. Then: Explain acclimation in general terms and keep heating or AC running. Confirm the install date only from the schedule. Ask for: Are the boxes stored inside the rooms where they'll be installed? Hand off to: Installation scheduler and project coordinator

Hardwood sanding and refinishingHardwood refinishing and restoration

When a caller says: "My hardwood floors are scratched and dull. Can you refinish them instead of replacing?" Say: Often, yes. Whether solid or engineered wood can be refinished depends on its wear layer and condition, so we'd take a look first. Then: Confirm refinishing is in [available services]. Explain dust, odor, drying and cure times. Offer an assessment. Ask for: About how many square feet, and do you know if it's solid or engineered wood? Hand off to: Flooring sales consultant

Problems after installationHardwood refinishing and restoration

When a caller says: "My new floor has gaps between the boards and some edges are curling up." Say: I'm sorry to hear that. Let's get the details so our warranty team can review it and set up an inspection if needed. Then: Verify identity. Collect install date, product, rooms, when noticed, photos, recent leaks or humidity changes. Do not assign cause or promise coverage. Ask for: When did you first notice it, and can you send photos? Hand off to: Warranty and customer service manager

Water-damaged flooring and insurance jobsHardwood refinishing and restoration

When a caller says: "My dishwasher leaked and the floor is ruined. Insurance said to get an estimate." Say: We can measure and provide a written estimate you can share with your insurer. First, please make sure the leak is stopped and the area is drying. Then: Ask if water is still present; if so, use safety guidance and suggest a plumber or water mitigation company. Don't advise on coverage. Note if matching existing flooring is needed. Ask for: Is the leak fixed and is the area dry now? Hand off to: Estimator and measure technician

StairsHardwood refinishing and restoration

When a caller says: "I want to replace the carpet on my stairs with wood. Do you do stairs?" Say: Stairs are priced per step and depend on the style, nosing and railings. We'll measure and show you options. Then: Confirm stair work is in [available services]. Note number of steps, landings, open or closed sides and existing material. Ask for: About how many steps are there, and are there any landings? Hand off to: Estimator and measure technician

Installing material the customer bought elsewhereHardwood refinishing and restoration

When a caller says: "I bought flooring online. Can you just install it for me?" Say: [customer supplied material policy] We can't warranty products we didn't supply, but our consultant can review your options. Then: Note product type, quantity and whether it's on site. Explain that quantity, accessories and prep are the customer's responsibility if allowed. Ask for: What type and brand of flooring did you buy, and how much? Hand off to: Flooring sales consultant

Returning leftover or extra materialHardwood refinishing and restoration

When a caller says: "I have four unopened boxes left over. Can I return them?" Say: Unopened full boxes of stocked products may be returned within [return window], with a restocking fee of [restocking fee]. Special orders aren't returnable. Many customers keep a few boxes for future repairs. Then: Verify identity and check purchase date and whether the product was a special order. Don't approve refunds yourself. Ask for: What's the name or invoice number on the order? Hand off to: Front desk and showroom coordinator

Urgent and safety situations11▾

Home built before 1978 with old paint or finish that may contain lead

Sanding can release lead dust. We follow applicable lead-safe practices or recommend testing before work; pregnant people and children should stay away from the work area.

Finish fumes and flammable products

Solvent-based finishes and stains are flammable and have strong vapors. Follow our instructions on pilot lights, open flames and ventilation; if anyone feels dizzy or has trouble breathing, get fresh air and call [emergency number] if severe.

Oil-soaked rags and pads

Rags used with oil-based stains or oils can spontaneously combust. Our crew removes them; never leave such rags piled up if you do touch-ups yourself.

Wood dust exposure

Keep people with asthma or allergies, children and pets away from sanding areas until cleanup is complete.

Active water leak or flooding on the floor

Shut off the water at the main valve if you can do so safely. Stay out of standing water near outlets or appliances; if there is any electrical danger, call [emergency number]. Call a plumber, then take photos and contact us once the area is safe.

Gas smell after appliances were moved

Leave the home right away and don't use light switches, phones or flames inside. From outside, call your gas utility or [emergency number]. Do not go back in until it's declared safe.

Someone is injured at the job site

For serious injuries, call [emergency number] immediately. Once everyone is safe, let us know what happened so we can follow up.

Old flooring or adhesive that may contain asbestos has been disturbed

Stop work and keep people and pets out of the area. Do not sweep, vacuum or keep scraping. Close the area off and contact a licensed asbestos professional; we will help coordinate next steps.

Strong fumes, headache, dizziness or trouble breathing after adhesive or finish work

Get to fresh air and open windows if safe. For trouble breathing, chest pain or fainting, call [emergency number]. For other exposure questions, call poison control at [poison control number].

Exposed tack strip, nails, staples or a loose stair tread

Keep children and pets away and avoid the area. Do not use a loose stair; use another route if possible. Call us at [public phone] so we can arrange an urgent repair.

A fastener may have hit an electrical wire or pipe (sparks, burning smell, water)

Turn off the breaker or water main if you can do so safely. If there is smoke or fire, leave and call [emergency number]. Then call us and a licensed electrician or plumber.

Glossary40▾
Drum sander / belt sander
Large walk-behind machine used to sand the main field of a floor to bare wood.
Edger
Smaller sander used along walls and in tight spaces the main sander can't reach.
Grit sequence
The order of sandpaper grits, from coarse to fine, used to remove finish and smooth the wood.
Water popping
Lightly wetting sanded wood to open the grain so stain absorbs more evenly and looks darker.
Sheen
How shiny the finish is: matte, satin, semi-gloss or gloss.
Polyurethane
Durable film-forming finish that sits on top of the wood; available water-based or oil-based.
Hardwax oil
Penetrating finish blending oils and waxes that gives a natural look and allows spot repairs.
Cure time
Time a finish needs to reach full hardness, longer than the time to be dry to the touch.
Lace-in (weave-in)
Repair method where new boards are staggered into existing ones so the repair blends.
Chatter marks
Evenly spaced ripples left by a sander, visible after staining or in raking light.
Blotching
Uneven, patchy stain absorption, common in maple, birch and pine.
Tongue exposure
When a floor has been sanded so thin that the tongue or nails show, meaning it can't be sanded again.
Trowel fill
Spreading wood filler across the whole floor to fill small gaps and holes before final sanding.
Adhesion test
Test to check whether a new coat will bond to the existing finish before a recoat.
Subfloor
The structural layer, usually plywood, OSB or concrete, that the finished floor is installed on.
Underlayment
A thin layer between subfloor and flooring that adds cushioning, sound reduction or moisture protection.
Vapor barrier
A plastic film or membrane that limits moisture rising from concrete or crawl spaces into the floor.
Acclimation
Letting flooring adjust to the home's temperature and humidity before installation.
Expansion gap
A small space left around the edges so the floor can expand and contract, hidden by baseboards or trim.
Floating floor
A floor that locks together and rests on the underlayment without being nailed or glued down.
Click-lock
Interlocking edges that let planks snap together without glue.
Engineered wood
Flooring with a real wood top layer bonded to a stable plywood or composite core.
LVP / LVT
Luxury vinyl plank and luxury vinyl tile: water-resistant vinyl floors with realistic wood or stone looks.
Wear layer
The top protective layer of vinyl or the real wood layer of engineered flooring; thicker usually means more durable.
AC rating
A durability scale for laminate, from AC1 for light residential use to AC5 for heavy commercial use.
Janka hardness
A test that rates how resistant a wood species is to dents; higher numbers mean harder wood.
Transition strip
A trim piece that joins two floors of different heights or materials, such as a T-molding or reducer.
Quarter round
A small rounded molding along the bottom of baseboards that covers the expansion gap.
Stair nosing
The rounded front edge of a stair tread, often a matching trim piece for the flooring.
Thinset
A cement-based mortar used to bond tile to the floor.
Grout
The material that fills the joints between tiles.
Lippage
An uneven height difference between the edges of neighboring tiles.
Self-leveling compound
A pourable cement-based product used to flatten uneven subfloors.
Cupping
When wood board edges rise higher than their centers, usually caused by moisture from below.
Crowning
When the center of a board is higher than its edges, often after sanding a floor that had cupped.
Screen and recoat
Lightly abrading a wood floor's finish and applying a fresh coat, without sanding to bare wood.
Waste factor
The extra material ordered to cover cuts and mistakes, usually a percentage of the room size.
Dye lot
A production batch; colors can vary slightly between lots, so material for one job should come from the same lot.
Carpet pad
The cushion installed under carpet that adds comfort and helps the carpet last longer.
VOC
Volatile organic compounds released by some finishes and adhesives while they cure.
Details you'll fill in82▾

Shown as [markers] in the text. After you copy it, each becomes a short question, and your answer fills in every item that mentions it.

  • [business name]What is the business's name as customers should hear it?
  • [location]Where are you located (each branch, with directions or parking if helpful)?
  • [timezone]Which time zone are you in?
  • [languages]Which languages can you serve customers in?
  • [hours]What are your opening hours for each location?
  • [holidays]Which holidays or special dates change your hours?
  • [public phone]Which phone number can be shared publicly?
  • [service area]Which areas do you serve, and where don't you go?
  • [available services]Which services do you offer, and which don't you?
  • [payment methods]Which payment methods do you accept?
  • [pricing]What are your prices, or how is a price worked out?
  • [cancellation policy]What is your cancellation policy?
  • [refund policy]What is your refund policy?
  • [no show policy]Is there a no-show or late cancellation fee? How much, and when does it apply?
  • [verification policy]How do you confirm who a customer is before discussing their account or booking?
  • [vendor policy]How should sales calls, vendors and spam be handled?
  • [emergency number]Which local emergency number applies to your location?
  • [estimate fee]Do you charge for in-home measurements or estimates? If so, how much, and is it credited toward the job?
  • [customer supplied material policy]Do you install flooring that customers bought elsewhere? Under what conditions?
  • [licensing info]What contractor licenses or registrations do you hold, if any?
  • [insurance info]What liability or workers' insurance do you carry?
  • [installer info]Are your installers employees or subcontractors, and how are they trained or vetted?
  • [product brands]Which flooring brands and product lines do you carry?
  • [removal disposal fee]How much do you charge to remove and dispose of old flooring, or is it included?
  • [minimum job size]Do you have a minimum job size or minimum charge? What is it?
  • [quote validity]How long are your written quotes valid?
  • [lead time]What is your typical time from signed quote to installation?
  • [sample policy]Can customers take samples home? Is there a deposit, fee or return deadline?
  • [deposit policy]What deposit do you require, when is it due and is it refundable?
  • [installation warranty]What warranty do you offer on installation workmanship, and for how long?
  • [leftover material policy]What do you do with leftover material after a job: leave it, return it for credit or dispose of it?
  • [furniture moving policy]Do you move furniture before and after installation? Is there a fee or any exclusions?
  • [appliance moving policy]Do you move appliances such as refrigerators, stoves and washers, and do you disconnect or reconnect water or gas lines?
  • [financing options]Do you offer financing? Through which provider and with what general terms?
  • [final payment terms]When is the remaining balance due after installation?
  • [delivery policy]Do you deliver flooring materials? Where, and is there a fee?
  • [measure fee]Is the in-home measurement free or is there a fee? Is it credited toward the order?
  • [quote valid days]How long are your written quotes valid?
  • [deposit amount]What deposit do you require to order materials (amount or percentage)?
  • [balance due terms]When is the remaining balance due (e.g., on completion, at delivery)?
  • [return window]How long after purchase can unopened stocked material be returned?
  • [restocking fee]What restocking fee applies to returns?
  • [removal disposal policy]Do you remove and haul away old flooring? Is it included or extra, and how is it priced?
  • [trim painting policy]Do you paint or caulk baseboards and trim after installation, or is that the customer's responsibility?
  • [workmanship warranty]What does your installation workmanship warranty cover and for how long?
  • [measure duration]About how long does a typical in-home measurement visit take?
  • [poison control number]What is the poison control phone number for your country or region?
  • [brands carried]Which flooring types and brands do you carry?
  • [flooring options details]What flooring categories do you sell and install, and what do you generally recommend for kitchens, baths, basements and homes with pets?
  • [in home measure details]How do in-home measurements work: who comes, how far ahead to book, and when the quote is delivered?
  • [material lead time details]What are typical lead times for stocked and special-order materials, and how are customers updated?
  • [old floor removal details]How do you handle removal of carpet, tile, glued-down floors and multiple layers, and suspected asbestos?
  • [subfloor moisture details]How do you test subfloors and concrete for moisture and flatness, and what prep services do you offer?
  • [furniture appliance details]What exactly can your crew move or disconnect, and what must the customer arrange?
  • [acclimation details]Which products you sell require acclimation, and how long do you typically allow?
  • [hardwood refinishing details]Do you sand and refinish hardwood? What finishes, dust control and drying/cure times apply?
  • [warranty claim details]How do you handle post-installation complaints and warranty claims, and how quickly do you inspect?
  • [water damage repair details]Do you do water-damage and insurance replacement jobs? Do you work directly with insurers or adjusters?
  • [stairs installation details]What stair options do you offer (carpet, wood treads, nosing, runners) and how are they priced?
  • [customer supplied material details]What do customers need to know before you install material they purchased elsewhere?
  • [leftover returns details]How are leftover materials handled after installation, and how do customers return extra boxes?
  • [standard finish coats]How many coats of finish do you apply in a standard refinish?
  • [finish options]Which finish types and sheens do you offer?
  • [dust containment available]Do you offer dust containment sanding, and at what cost?
  • [recoat interval]How often do you recommend a screen and recoat?
  • [refinishing price]What are your refinishing rates, including stain, extra coats and stairs?
  • [recoat price]What does a screen and recoat cost?
  • [refinish duration]How long does a typical full refinish take?
  • [recoat duration]How long does a typical screen and recoat take?
  • [refinish furniture policy]Do you move furniture for refinishing jobs, and what does it cost?
  • [sock traffic time]How long before customers can walk in socks?
  • [shoe traffic time]How long before shoes are allowed?
  • [furniture return time]How long before furniture can go back?
  • [rug wait time]How long should customers wait before laying rugs?
  • [refinish warranty]What workmanship warranty do you offer on refinishing?
  • [restain fee]What do you charge to change stain color after approval?
  • [finish report window]Within what period must finish concerns be reported?
  • [adhesion test fee]Is there a fee for a recoat adhesion test?
  • [refinish vs recoat details]How do you decide between recoat and full refinish, and do you assess from photos?
  • [stain color details]How do you handle stain samples and color approval?
  • [refinish schedule details]What scheduling, phasing and move-out guidance do you give?
  • [finish problem details]How do you handle complaints about finish quality?
Before you publish16▾

Private notes for the owner. These are not copied into your knowledgebase.

  • Check whether your area requires lead-safe certification (in the US, EPA RRP for pre-1978 homes when disturbing painted surfaces) and confirm your crew's status.
  • VOC limits for finishes vary by state and country; confirm your products comply where you work.
  • Confirm your liability insurance covers fire risk from solvents and oily rags, and damage to surrounding property from dust.
  • Document existing conditions with photos before sanding (stains, thin boards, prior repairs) to reduce disputes.
  • Make sure your dry and cure times match the finish manufacturer's data sheets and your warranty terms match product warranties.
  • Get written stain color approval to protect against color disputes.
  • Contractor licensing, registration and permit rules for flooring work vary by state, province and country. Confirm what applies to you before publishing any statement about being licensed.
  • Asbestos in old resilient flooring and adhesives is regulated in many places. Confirm your local testing, removal and disposal rules and whether your crews may handle it before describing that service.
  • In the US, work that disturbs painted surfaces such as baseboards in homes built before 1978 may fall under the EPA Renovation, Repair and Painting (RRP) rule. Check equivalent rules in your area.
  • Some jurisdictions give a cooling-off period to cancel contracts signed in the customer's home, and some limit deposit amounts. Check your local consumer protection rules before setting deposit and cancellation terms.
  • Manufacturer warranties often depend on installation methods, moisture testing and site conditions. Keep moisture readings, photos and signed walkthroughs to support claims.
  • Only publish product claims (waterproof, low-VOC, formaldehyde certifications, pet-proof) exactly as the manufacturer documents them for the specific products you carry.
  • Verify your general liability insurance, workers' compensation and any subcontracted installers' coverage. If you use subcontractors, decide how warranty responsibility is explained to customers.
  • Customer home access details such as gate, lockbox and alarm codes are sensitive. Limit who can see them and remove them after the job.
  • Review every placeholder, especially pricing, deposits, return windows and warranty terms, and make sure they match your written contracts before publishing.
  • Confirm the correct emergency and poison control numbers for your country, and whether your crews may reset toilets or disconnect water lines under local plumbing rules.