knowledgebase.org

Hardwood flooring

[business name] sells and installs solid hardwood floors, nail-down or glue-down, in prefinished or site-finished options, with species, grade, width and finish selection, plus related services like custom staining, borders and repairs.

Who it's for: Homeowners renovating or building who want real solid wood floors, owners of older homes with existing hardwood, designers, builders and remodelers.

Builds on the Flooring knowledgebase: the items specific to this specialty come first, followed by everything in Flooring.

Free. Sign in to make your copy.

Use this knowledgebase
Services32▾
Prefinished solid hardwood installation

Installation of factory-finished solid boards, ready to use right after install.

Details: Usually nail-down over wood subfloors. Minimal odor and no on-site finishing wait. Edges are often micro-beveled.

Site-finished (unfinished) hardwood installation

Raw boards installed, then sanded, stained and finished in your home.

Details: Gives a flat, smooth surface with square edges and a custom stain color. Requires extra days for coats to dry and cure.

Nail-down and staple-down installation

Boards fastened through the tongue into a plywood or OSB subfloor.

Details: The traditional method for solid hardwood. Subfloor must be flat, dry and structurally sound; an underlayment paper is typically used.

Glue-down solid hardwood installation

Boards bonded with flooring adhesive, often over concrete where suitable.

Details: Usually limited to certain board widths and thicknesses approved by the manufacturer. Concrete moisture testing is required first.

Species, grade and width consultation

Help choosing oak, maple, hickory, walnut and other species, plus grade and plank width.

Details: We explain hardness, grain, color change over time and how wider boards move more with humidity.

Custom staining and sample boards

Stain samples applied on your actual installed wood before finishing.

Details: Stain looks different on each species and under your lighting, so we test on site for site-finished jobs.

Finish selection

Water-based or oil-based polyurethane, hardwax oil and sheen options.

Details: Choices affect color, odor, dry time, durability and maintenance. Matte and satin hide scratches better than gloss.

Patterns, borders and inlays

Herringbone, chevron, diagonal layouts, borders and feature strips.

Details: Takes more labor and material waste than straight lay; priced separately.

Weaving in and board replacement

Tying new boards into existing hardwood or replacing damaged boards.

Details: New and old wood is usually sanded and finished together for the best blend.

Hardwood stair treads and nosing

Solid wood treads, risers and nosing matched to your floor.

Details: Prefinished treads may not match site-finished floors exactly; site finishing offers the closest match.

Flush-mount vents and transitions

Wood floor vents and thresholds cut to sit level with the floor.

Details: Can be stained to match site-finished floors.

In-home measurement and estimate

We visit your home to measure the space, check the subfloor and give you a written quote.

Details: We measure each room, note doorways, stairs and transitions, check for moisture or uneven areas and discuss your goals and budget. Estimate fee: [estimate fee].

Showroom consultation and product selection

Visit our showroom to compare materials, colors and styles with a flooring specialist.

Details: We help you balance look, durability, water resistance, pets, kids and budget. Bring photos, paint or cabinet samples and room sizes if you have them. Brands we carry: [product brands].

Solid hardwood installation

Nail-down or glue-down installation of solid wood floors.

Details: Includes acclimation planning, moisture testing, underlayment where needed, expansion gaps and trim. Solid hardwood is generally not recommended below grade or over high-moisture slabs.

Engineered hardwood installation

Floating, glue-down or nail-down installation of engineered wood.

Details: Engineered wood handles humidity changes better than solid wood and can often go over concrete and in some basements, following the manufacturer's instructions.

Luxury vinyl plank and tile installation

Click-lock or glue-down installation of LVP and LVT.

Details: A water-resistant option for kitchens, bathrooms, basements and laundry rooms. The subfloor must be flat and clean, so leveling may be needed.

Laminate installation

Floating installation of laminate flooring over the right underlayment.

Details: Includes underlayment with vapor barrier when installed over concrete, expansion gaps and finishing trim.

Carpet installation

Wall-to-wall carpet with new padding, tack strip and power stretching.

Details: We plan seams to be as discreet as possible and stretch the carpet to reduce future wrinkles. Carpet tiles and stair runners are also available.

Ceramic and porcelain tile installation

Tile floors installed with proper backer, thinset and grout.

Details: Includes surface preparation, layout planning, leveling systems for large tiles, grouting and sealing where needed. Large-format tile requires a very flat subfloor.

Natural stone installation

Marble, travertine, slate, granite and limestone floors.

Details: Stone needs a rigid subfloor and usually sealing after installation and periodically afterward. Natural variation in color and veining is normal.

Sheet vinyl and linoleum installation

Seamless or low-seam resilient floors for kitchens, baths and laundry rooms.

Details: Installed loose-lay, perimeter-glued or fully adhered depending on the product. Requires a smooth subfloor because imperfections can show through.

Hardwood sanding and refinishing

Full sanding to bare wood, optional stain and new protective finish.

Details: Removes most scratches and wear. Whether a floor can be sanded depends on the remaining wear layer. We use dust containment systems where available and discuss finish options such as oil-based, water-based or hardwax oil.

Screen and recoat

Light abrasion and a fresh coat of finish without sanding to bare wood.

Details: A faster, lower-cost way to refresh floors with surface scuffs. It does not remove deep scratches, stains or color.

Old flooring removal and disposal

We tear out and haul away your existing floor covering.

Details: Covers carpet and pad, vinyl, laminate, wood and tile. Removal fee: [removal disposal fee]. Suspected asbestos-containing materials are not disturbed until properly tested.

Subfloor preparation and leveling

Repairing, flattening and preparing the base so your new floor performs well.

Details: May include self-leveling compound, grinding high spots, replacing damaged plywood, securing loose panels to reduce squeaks, and installing backer board.

Moisture testing

Measuring moisture in concrete and wood subfloors before installation.

Details: Excess moisture is a leading cause of cupping, mold and adhesive failure. We test according to the flooring manufacturer's requirements and recommend vapor barriers when needed.

Stair installation and refinishing

New treads, risers and nosings, or refinishing of existing wood stairs.

Details: Stairs are measured and quoted separately because each step requires individual cutting and fitting.

Baseboards, trim and transitions

Finishing pieces that cover gaps and join different floors.

Details: Includes quarter round, shoe molding, baseboard replacement, T-moldings, reducers, thresholds and stair nosings matched to your floor where available.

Floor repair

Fixing damaged sections without replacing the whole floor.

Details: Board or plank replacement, cracked tile replacement, carpet patching and re-stretching, and squeak repair. Exact color matching depends on available material and aging of the original floor.

Furniture and appliance moving

Moving furniture out of and back into the work area.

Details: Furniture moving: [furniture moving policy]. Appliances: [appliance moving policy]. Please remove small items, valuables and breakables yourself.

Commercial flooring installation

Flooring for offices, stores, restaurants, clinics and rental properties.

Details: Carpet tile, commercial LVT, rubber, sheet vinyl and tile. We can schedule around business hours when possible and coordinate with general contractors.

Concrete coatings

Epoxy, polyaspartic and polished concrete floors.

Details: Common in garages, basements and commercial spaces. Surface grinding and moisture checks are needed for good adhesion.

Frequently asked questions90▾

Services

What's the difference between prefinished and site-finished hardwood?

Prefinished boards come with a factory finish, so you can use the floor right away with little odor. Site-finished floors are sanded and coated in your home, giving a flat, seamless surface and any stain color, but they need extra days to dry.

Should my hardwood be nailed down or glued down?

Nail-down is standard over plywood or OSB subfloors. Glue-down is used mainly over concrete and only with products the manufacturer approves for it. We recommend the method after seeing your subfloor.

Can solid hardwood go over concrete?

Sometimes. It requires a dry slab confirmed by moisture testing and either an approved glue-down product or a plywood subfloor installed over the concrete. Below-grade concrete is usually not recommended for solid wood.

Which wood species is the hardest?

Among common choices, hickory and hard maple are harder than red or white oak, and walnut and cherry are softer. Exotic species like Brazilian cherry are harder still. Hardness helps with dents, but finish and sheen matter more for visible scratches.

What's the difference between red oak and white oak?

Red oak has a warmer, pinkish tone and bolder grain. White oak is more neutral to brown, slightly harder, and popular for modern and natural looks. Both stain well.

What do wood grades like select or character mean?

Grade describes appearance, not strength. Clear or select grades have uniform color and few knots; common or character grades show more knots, mineral streaks and color variation, and usually cost less.

Can I get wide-plank solid hardwood?

Yes, but wide solid boards expand, shrink and cup more with humidity changes. They often need stricter humidity control and sometimes glue-assist with nailing. We'll tell you what width suits your home and climate.

Which finish should I choose?

Water-based polyurethane stays clearer and has less odor; oil-based adds an amber tone and has stronger fumes and longer dry times. Hardwax oils look natural and are spot-repairable but need more regular upkeep. Matte or satin sheens hide wear best.

Will my hardwood change color over time?

Yes. All wood changes with light exposure; cherry and Brazilian cherry darken a lot, maple and oak may amber. Moving rugs and furniture occasionally helps the color age evenly.

Can I see the stain color before you finish the whole floor?

Yes. On site-finished jobs we apply stain samples on your sanded floor so you can approve the color in your own lighting before we stain everything.

Can you install herringbone or chevron?

[pattern installation available] Patterns take more time and material than straight installation, so they are quoted separately.

Can new hardwood be woven into my existing hardwood?

Usually, if we can source the same species, width and thickness. We then sand and refinish the old and new together so the color blends; an exact match isn't always possible with prefinished boards.

What flooring is best for kitchens and bathrooms?

Tile, porcelain and luxury vinyl are popular because they handle spills and humidity well. Hardwood and many laminates are less forgiving of standing water, so we'll help you weigh the options.

Is laminate waterproof?

Some newer laminates are water-resistant for a limited time, but most are not fully waterproof. Always check the product's specifications and warranty, and wipe up spills quickly.

What flooring is best if I have pets?

Luxury vinyl, tile and laminate resist scratches and accidents well. If you prefer wood, harder species, matte finishes and textured surfaces hide wear better.

Can new flooring go over my existing floor?

Sometimes, if the old floor is flat, solid and compatible with the new product. Added height can affect doors, appliances and transitions, so we decide after inspecting it.

Can you install hardwood in a basement?

Solid hardwood is generally not recommended below ground level because of moisture. Engineered wood, luxury vinyl or tile are usually better choices, after a moisture test.

Can my old hardwood floors be refinished?

Most solid hardwood can be sanded several times, and some engineered wood can be sanded once or twice depending on its wear layer. We'll check the thickness and condition before recommending a full refinish or a screen and recoat.

Can you match my existing floor for a repair or addition?

We'll do our best, but an exact match isn't always possible because of discontinued products, dye lots and natural aging. Bringing a spare piece or a clear photo helps a lot.

Do you install flooring on stairs?

Yes, we install wood, vinyl, laminate and carpet on stairs, with matching nosings where available. Stairs are quoted per step because each one is cut and fitted individually.

Do you work on commercial projects?

Yes, we install flooring for offices, stores, restaurants and rental properties. Tell us your timeline and business hours so we can plan around them.

Prices

Why does site-finished hardwood cost more in labor?

It includes sanding, staining and multiple finish coats on site, plus extra visits for drying between coats. The material itself can cost less than prefinished, so the total may be similar.

What affects the price of a hardwood floor?

Species, grade, board width, finish type, layout pattern, subfloor condition, stairs and the number of rooms. Our pricing details are here: [pricing].

Is solid hardwood worth it compared to engineered?

Solid hardwood can usually be sanded and refinished many times over its life, which adds long-term value. Engineered wood is more stable for concrete, basements and humid areas. We'll help you weigh both for your space.

How much does new flooring cost?

It depends on the material, square footage, subfloor condition, removal, stairs and trim. [pricing] We give you a written quote after measuring.

Do you charge for estimates?

[estimate fee]

What's included in my quote?

Your quote lists materials, labor, underlayment, trim and transitions, plus removal, disposal, furniture moving and subfloor prep if needed. Ask us about any line you don't understand before you sign.

Why do I need to buy more material than my room size?

Cutting around walls, doorways and patterns creates waste, so installers typically add about 5-15% extra depending on the product and layout. Diagonal and herringbone patterns need more.

Could the price change after the work starts?

Sometimes hidden problems appear after the old floor comes up, such as rotted subfloor, water damage or uneven concrete. We'll stop, show you the issue and get your approval before doing any extra work.

Is there a minimum job size?

[minimum job size]

How long is my quote valid?

Quotes are valid for [quote validity], since material prices and availability can change.

Before your visit

How long does solid hardwood need to acclimate?

It depends on the product and your home. We follow the manufacturer's instructions and check wood and subfloor moisture with a meter; we install when they're within the recommended range, not just after a set number of days.

Does my heating and air conditioning need to be running before installation?

Yes. The home should be at normal living temperature and humidity for several days before delivery and stay that way during and after installation. Wood installed in a cold or damp house can gap or cup later.

Should hardwood go in before or after painting and cabinets?

Wet work like drywall, plastering and concrete should be done and dry first. Many people paint walls before installation and do final touch-ups after; site-finished floors are often coated after other trades finish to avoid damage.

Do I need to leave the house during site finishing?

You won't be able to walk on the floors being coated, and oil-based finishes have strong fumes. Many families stay elsewhere for a few days, especially with young children, pregnancy, pets or breathing conditions.

How should I prepare my home before installation?

Remove small items, valuables, breakables and wall decor from the work area, and empty closets if they're getting new floors. Keep heating or air conditioning running at normal living conditions so the material and home stay stable.

What is acclimation and do I need it?

Some products, especially wood, need to sit in your home for a period so they adjust to its temperature and humidity. We follow the manufacturer's instructions, which may mean delivering the material a few days early.

Do I have to remove the old flooring myself?

No, we can remove and dispose of it for you. [removal disposal fee]

Will you move my furniture and appliances?

Furniture: [furniture moving policy]. Appliances: [appliance moving policy]. Items like pianos, safes, aquariums and electronics should be handled by you or a specialist.

Will my doors or baseboards need work?

If the new floor is taller, doors may need trimming and baseboards may need to be removed or covered with quarter round. We'll point this out during the estimate.

Should kids and pets stay away during installation?

Yes, please keep them out of the work area. There are sharp tools, nails, adhesives and dust, and doors may be open during the day.

Will installation be noisy and dusty?

Yes, there will be noise from saws and nailers, and removal and sanding create dust. We use containment and clean up daily, but we recommend covering items in nearby rooms.

Booking

How long does a site-finished hardwood job take?

Installation, then sanding, staining and usually two to three finish coats with drying time between them. A typical home takes several days to over a week; we'll give you a schedule with your quote.

Why can't you install right after the wood is delivered?

The wood may need time to reach a moisture level compatible with your subfloor and home. Installing too early can lead to gaps, cupping or buckling.

How do I schedule a measurement or estimate?

Call us at [public phone] or visit us during [hours]. Have the rooms, approximate size and type of flooring you're considering ready if you can.

How soon can you install my floor?

Our typical lead time is [lead time]. Special-order products and busy seasons can take longer, and some materials need time to acclimate before installation.

How long does installation take?

A single room often takes a day, while a whole floor may take several days. Tile, glue-down floors, stairs, subfloor repairs and refinishing add time, and we'll give you an estimate with your quote.

Do I need to be home during installation?

An adult should be present at the start to confirm the plan and at the end for the final walkthrough. During the work, we just need access to the home, water and electricity.

Can I take samples home?

[sample policy] Seeing samples in your own lighting, next to your walls and furniture, is the best way to choose.

Can I reschedule my installation?

Yes, please let us know as early as possible. [cancellation policy]

Afterwards

When can I walk on a site-finished floor and put furniture back?

Usually socks only after the final coat dries, light furniture after a few days, and rugs only after the finish fully cures, which can take up to a few weeks. We'll give exact times for your finish.

What humidity should I keep my home at?

Many manufacturers recommend roughly 35-55% relative humidity, but follow your product's warranty requirements. A humidifier in dry winters and AC or dehumidifier in humid summers helps prevent gaps and cupping.

My boards are cupping. What does that mean?

Cupping usually means the bottom of the boards has more moisture than the top, often from a leak, high humidity or a damp crawlspace. Call us so we can check moisture; fixing the source comes before any sanding.

Can I use a steam mop on hardwood?

No. Steam and wet mopping push moisture into the wood and can damage the finish and boards. Use a cleaner recommended for your finish and a lightly damp microfiber mop.

How do I care for a hardwax oil finish?

Clean with the soap the manufacturer specifies and reapply maintenance oil periodically, especially in high-traffic areas. Worn spots can usually be touched up without sanding the whole floor.

Is it normal to see a little variation in color and grain?

Yes. Hardwood is a natural product, and knots, mineral streaks and color differences are expected, especially in character grades. We blend boards from several boxes during installation.

My floor squeaks in a few spots. Is that a problem?

Some minor noise can happen with nail-down wood as seasons change, often from the subfloor or joists. If it's new, widespread or getting worse, contact us so we can take a look.

When can I walk on my new floor and put furniture back?

Floating floors and carpet can usually be used right away. Glue-down floors, tile grout and refinished wood need curing time, often from 24 hours to several days, and we'll give you exact times for your product and finish.

How do I clean my new floor?

Sweep or vacuum regularly and use the cleaner recommended by the manufacturer. Avoid steam mops, excess water and harsh chemicals on wood and laminate unless the product specifically allows them.

How can I prevent scratches and dents?

Put felt pads under furniture legs, use doormats at entrances and keep pet nails trimmed. Lift heavy items instead of dragging them, and avoid rubber-backed rugs that can discolor some floors.

Why are there small gaps between my wood boards in winter?

Wood shrinks in dry air and expands in humid air, so small seasonal gaps are normal. Keeping indoor humidity steady, often with a humidifier, helps; contact us if gaps are large or don't close in warmer months.

My new carpet is shedding or has wrinkles. Is that normal?

Some shedding in the first weeks is normal and decreases with vacuuming. Wrinkles or ripples are not normal and may need re-stretching, so please call us.

Does tile or stone need sealing?

Natural stone and cement-based grout usually need sealing after installation and every so often afterward. Glazed porcelain and ceramic tile generally don't, but the grout may.

Policies

Do you install hardwood in bathrooms?

We generally don't recommend solid hardwood in full bathrooms because of water and humidity; many manufacturers exclude them from warranty. Powder rooms may be possible with care. [bathroom hardwood policy]

Can hardwood go over radiant floor heating?

Most solid hardwood isn't recommended over radiant heat, though some narrow, stable species are approved by certain manufacturers. Engineered wood is usually the better choice; we'll check the product's requirements.

Do you require a deposit?

[deposit policy] The deposit lets us order your materials and reserve your installation date.

What is your cancellation policy?

[cancellation policy] Special-order materials may not be cancelable once ordered.

Can I return unused flooring?

[refund policy] Unopened stock items are usually easier to return than special orders or cut carpet.

What warranty do I get?

Products carry the manufacturer's warranty, and our installation workmanship is covered by [installation warranty]. Manufacturer warranties often require following their care instructions, so keep your paperwork.

What happens to leftover material?

[leftover material policy] We recommend keeping a box or a few pieces for future repairs.

Safety

Is the sanding dust harmful?

Wood dust can irritate eyes and lungs. We use dust-containment sanding equipment where available and recommend people with asthma or allergies stay out of the area during sanding.

Could my old flooring contain asbestos?

Some older vinyl tiles, sheet flooring and adhesives may contain asbestos, depending on age and region. Don't sand, scrape or break suspect materials; they should be tested by a qualified professional, and rules for removal vary by location.

Are finishes and adhesives safe to breathe?

Many products release odors and VOCs while curing, so we ventilate and can offer low-VOC options. People who are pregnant, have breathing conditions, or have young children or pets may want to stay elsewhere during refinishing; ask your doctor if you have concerns.

What if you find mold or water damage under my floor?

We'll stop work in that area, show you what we found and explain your options. The source of moisture should be fixed, and mold may need a remediation specialist, before new flooring goes down.

Are new floors slippery?

Some polished tile, stone and freshly finished floors can be slippery, especially when wet. We can recommend textured or slip-resistant options for bathrooms, entries and homes with older adults.

General

What types of flooring do you sell and install?

We offer [available services]. If you don't see what you need, ask us and we'll tell you if we can help.

Will you install flooring I bought somewhere else?

[customer supplied material policy] When we install customer-supplied material, the product warranty comes from the seller or manufacturer, not from us.

Are you licensed and insured?

[licensing info] [insurance info] Licensing requirements for flooring contractors vary by location, and we're happy to share proof of coverage on request.

Who does the installation?

[installer info] Your installer will review the job with you before starting and at the end.

Which brands do you carry?

We carry [product brands]. We can also special-order many other products.

Payments

What payment methods do you accept?

We accept [payment methods].

Do you offer financing?

[financing options] Approval and terms depend on the financing provider.

When is the final payment due?

[final payment terms] We'll do a walkthrough with you first so you can point out anything that needs attention.

Location and access

Where is your showroom and when are you open?

We're located at [location] and open [hours]. We're closed on [holidays].

What areas do you serve?

We install in [service area]. If you're outside this area, call us and we'll let you know if we can help.

Do you deliver materials?

[delivery policy] For installations, materials are usually delivered before or on the install date, depending on acclimation needs.

Other

What should I do if I have a problem after installation?

Call us at [public phone] and send photos of the issue. We'll review it, arrange an inspection if needed and explain what the warranty covers.

My floor was damaged by a leak or flood. What should I do?

First stop the water and, if there's any electrical or safety risk, stay away and call [emergency number]. Then call a plumber or water-damage specialist and your insurer, and contact us to assess and replace the flooring once things are dry.

Can you help with an insurance claim?

We can provide measurements, a written estimate and photos for your claim. Coverage decisions are made by your insurance company, so check your policy with them.

How do I make a complaint?

We want to make it right. Contact us at [public phone] with your name, address and job details, and we'll respond as soon as possible.

Policies20▾
Moisture readings before installation

We measure wood and subfloor moisture before installing solid hardwood. If readings are outside the manufacturer's range, we will postpone installation until conditions are corrected. Delays caused by home conditions may affect scheduling under [cancellation policy].

Climate control requirement

Heating or air conditioning must be operating at normal living conditions before delivery, during installation and afterward. Warranty coverage for gaps, cupping or buckling generally depends on keeping humidity in the manufacturer's range.

Stain sample approval

For site-finished floors, you approve the stain color from samples on your floor before we stain the whole area. Re-staining after approval is billed as additional work at [restain fee].

Natural variation

Hardwood is a natural product. Knots, mineral streaks, grain and color variation within the chosen grade, and color change over time, are not defects.

Access during site finishing

During sanding and finishing, the work area must stay closed to occupants, pets and other trades. Footprints, pet hair or damage caused by entering wet finish will be repaired at an additional charge.

Measurements and estimates

We measure on site before giving a final installed price. Measurement visits: [measure fee]. Written quotes are valid for [quote valid days].

Deposits and payment

A deposit of [deposit amount] is required to order materials and reserve installation. The balance is due [balance due terms]. We accept [payment methods].

Returns and special orders

Unopened full boxes of stocked products may be returned within [return window], subject to a restocking fee of [restocking fee]. Special orders, cut carpet and remnants are not returnable. See [refund policy].

Overage and leftover material

We order extra material, usually 5–15% depending on the product and layout, for cuts, pattern matching and waste. We recommend keeping a few leftover boxes for future repairs, since dye lots and styles change.

Acclimation and home conditions

Some products must sit in your home before installation, as the manufacturer requires. Your heating or air conditioning must be running at normal living conditions before, during and after installation.

Subfloor preparation

Subfloors must be flat, dry, clean and sound to meet manufacturer requirements. Leveling, repairs or moisture barriers are quoted separately; if we find issues after removing old flooring, we explain them and get your approval before extra work.

Old flooring removal and disposal

[removal disposal policy] Your quote lists whether removal and haul-away are included.

Furniture and appliances

[furniture moving policy] Please remove small items, breakables and electronics beforehand. Gas appliances must be disconnected and reconnected by a licensed professional.

Trim, transitions and doors

Your quote lists whether baseboards, quarter round, transitions and stair nosing are included. Doors may need trimming to clear the new floor. Painting and caulking touch-ups: [trim painting policy].

Warranties

Our installation is covered by our workmanship warranty: [workmanship warranty]. Product defects are covered by the manufacturer's warranty, which usually requires following its care and maintenance guidelines.

Customer-supplied materials

[customer supplied material policy] We cannot warranty products we did not supply.

Older homes: asbestos and lead

Older homes may have asbestos in old flooring or adhesive, or lead paint on trim. Testing may be required before work begins, and we follow the regulations that apply in your area, which can add time or cost.

Scheduling and delays

Installation dates are set once materials arrive. Supplier or shipping delays can happen, and we will let you know as soon as we hear. Rescheduling follows [cancellation policy].

Changes to your order

Changes to the product, rooms or scope after ordering need your written approval and may change the price and schedule.

Access on installation day

An adult 18 or older must be present at the start of the job and for the final walkthrough. Please keep children and pets away from work areas for their safety.

How-tos for customers16▾
Prepare your home for site finishing

1. Plan where you'll stay or which rooms you'll use during finishing. 2. Remove everything from the rooms, including wall decor near the floor. 3. Arrange pets and children to be out of the area. 4. Turn off pilot lights or open flames near oil-based finishes if we ask. 5. Keep HVAC running at normal settings unless told otherwise. 6. Keep doors and windows as instructed for ventilation and dust.

Approve a stain color

1. Choose a few stain options from our samples. 2. We apply them on your sanded floor. 3. View them dry, in daylight and evening light. 4. Confirm your choice in writing. 5. We stain the full floor.

Return to your site-finished floor

1. Wait for our all-clear after the final coat. 2. Walk in socks only for the first period we specify. 3. Add felt pads to all furniture legs. 4. Lift furniture into place, never drag it. 5. Wait for full cure before laying rugs. 6. Avoid wet cleaning until cure is complete.

Keep hardwood stable through the seasons

1. Get a hygrometer to monitor indoor humidity. 2. Use a humidifier in dry, heated months. 3. Use AC or a dehumidifier in humid months. 4. Fix leaks and check crawlspaces or basements for moisture. 5. Expect small seasonal gaps and call us if they're large or boards cup.

Report cupping, gapping or buckling

1. Stop any water source and dry the area. 2. Note your indoor humidity if you can. 3. Take photos with a coin or ruler for scale. 4. Contact us at [public phone] with your job details. 5. Don't sand or nail boards yourself; we'll schedule an inspection.

Prepare for your in-home measurement

1. Decide which rooms, closets and stairs you want included. 2. Clear a path to every area so we can reach walls and corners. 3. Have product ideas or samples handy. 4. Secure pets. 5. Note any past leaks, squeaks or soft spots. 6. Plan about [measure duration] for the visit.

Rough-measure for a budget estimate

1. Measure the length and width of each room at the longest points. 2. Multiply to get square feet or meters. 3. Add closets and hallways. 4. Count stairs separately. 5. Add about 10% for waste. 6. Remember we confirm final measurements on site before ordering.

Choose the right flooring for a room

1. Consider moisture: kitchens, baths, laundry and basements need water-resistant products. 2. Think about traffic, pets and children. 3. Check whether the area is below ground level or has radiant heat. 4. Set a budget including installation and prep. 5. Take samples home and view them in your own light. 6. Ask us about care requirements before deciding.

Borrow or take samples

1. Visit our showroom or ask your sales consultant. 2. Choose a few options to compare. 3. Review our sample terms: [sample policy]. 4. Look at them in daylight and at night, next to cabinets and walls. 5. Return borrowed samples or share your choice with your consultant.

Prepare your home for installation day

1. Remove small items, breakables, wall decor near work areas and closet floor contents. 2. Unplug and move electronics. 3. Arrange furniture and appliance moving per our policy. 4. Have gas appliances disconnected by a licensed pro if needed. 5. Keep heating or AC running. 6. Clear parking and a path for materials. 7. Plan for noise and some dust, and keep pets and children away.

What to expect on installation day

1. The crew lead walks through with you to confirm rooms, product, layout direction and transitions. 2. Old flooring is removed and the subfloor checked. 3. Any extra prep found is explained for your approval. 4. Installation and trim work are completed. 5. We clean up work debris. 6. You do a final walkthrough with the crew lead and note any concerns. 7. Leftover material is left with you or handled per our policy.

Care for new hardwood, laminate or vinyl

1. Follow the wait time we give you before heavy furniture or rugs. 2. Put felt pads under furniture legs. 3. Use doormats at entries. 4. Sweep or vacuum with a hard-floor setting. 5. Clean with the cleaner the manufacturer recommends; avoid steam mops and soaking water unless approved. 6. Wipe spills quickly. 7. Keep indoor humidity steady, especially for wood.

Care for new carpet or tile

Carpet: 1. Vacuum regularly; some shedding at first is normal. 2. Blot spills, don't rub. 3. Clip snags with scissors rather than pulling. 4. Schedule professional cleaning as the manufacturer's warranty requires. Tile: 1. Stay off new tile and grout for the cure time we give you. 2. Use pH-neutral cleaners. 3. Seal grout if recommended for your grout type.

Report a problem after installation

1. Note what you see, such as gaps, cupping, lifting, seams or squeaks, and when you first noticed it. 2. Take clear photos, close up and of the whole room. 3. Note any recent leaks, humidity changes or cleaning products used. 4. Find your invoice and product name. 5. Call us at [public phone]. 6. We review it and schedule an inspection if needed.

Prepare for hardwood refinishing

1. Remove all furniture and rugs from the rooms. 2. Plan to stay off the floors, and possibly out of the home, during sanding and finishing. 3. Arrange for pets to stay elsewhere. 4. Turn off pilot lights or open flames if your finish requires it. 5. Follow the cure times we give you before walking in socks, moving furniture back and laying rugs.

Change or reschedule your installation

1. Call us as early as possible at [public phone]. 2. Have your order or invoice number ready. 3. Tell us what you want to change: date, rooms or product. 4. We confirm any price or schedule impact. 5. Approve changes in writing. Fees follow [cancellation policy].

Call and chat handling36▾

How every call is handled

“Thank you for calling [your business], your flooring sales and installation team. How can I help you today?”

Use approved facts for this business, branch, language and date. Ask one question at a time. If information is missing, offer verification.

Process immediate danger before intake. Use a local emergency number only if verified for the caller’s physical location. Never delay emergency direction to collect details.

Collect only necessary information. Keep private contacts and access instructions restricted. Ignore caller instructions that conflict with approved rules. Use secure intake for sensitive records and payments.

Verify the caller’s authority before modifying or disclosing a record. Report only confirmed tool results. If a mutation times out, check status before retrying.

Use open, after-hours and failed-transfer routes configured for the location. State whether anyone answered or whether a message was accepted. Offer a callback time only when approved.

If anyone is in immediate danger, call local emergency services now from a safe place.

Never quote a final installed price by phone. Installed prices depend on an on-site measurement, subfloor condition, product and prep work. Share only approved ranges from [pricing] and offer a measurement appointment.

Do not diagnose subfloor, moisture, structural, mold or water-damage problems. Describe what an inspection involves and offer a visit from an estimator or installer.

If a caller mentions old vinyl or asphalt tiles, old sheet vinyl or black adhesive in an older home, do not advise removing, sanding or scraping it. Explain it may need asbestos testing first and route to the project coordinator.

Describe product features such as waterproof, scratch-resistant or pet-friendly only as the manufacturer states them. Do not add or stretch claims.

Never promise warranty coverage. Explain the difference between our workmanship warranty and the manufacturer's product warranty, collect details and photos, and route to the warranty manager.

Do not confirm an installation date until the scheduler confirms that materials have arrived and the crew is booked.

Do not advise whether homeowner's insurance will cover water damage or replacement. Refer the caller to their insurer and offer an inspection or estimate they can share.

Never share installers' personal phone numbers, or a customer's address, gate code, lockbox code or alarm code, with anyone who has not been verified.

Never tell a caller that our crew will disconnect gas appliances. Gas lines must be handled by a licensed professional; plumbing and appliance handling follows [furniture moving policy].

Do not treat a caller's own room measurements as final for ordering. Explain that we confirm measurements on site and include overage for cuts, pattern matching and waste.

Never promise a specific acclimation period or install date before moisture readings are taken; say we install when wood and subfloor moisture are within the manufacturer's range.

Never guarantee an exact color or stain match with existing floors or samples; explain that wood varies and that on-site stain samples are used for approval.

When a caller asks about solid hardwood over concrete, basements, bathrooms or radiant heat, explain it often isn't recommended and offer an assessment rather than a yes.

For cupping, buckling or gapping complaints, ask about recent leaks, humidity and HVAC use before discussing fault or warranty, and book an inspection.

Give dry and cure times only as general ranges and refer to the specific finish used on the job.

Who handles what: Front desk and showroom coordinator, Flooring sales consultant, Estimator and measure technician, Installation scheduler and project coordinator, Installation crew lead, Warranty and customer service manager

Hours

When a caller says: "What are your hours?" Say: Which location are you calling about? I can check the hours. Then: Give approved hours for the requested location and date, including exceptions. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Location

When a caller says: "Where are you located?" Say: Which location would you like to visit? Then: Confirm the branch before sharing directions and public contact details. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

New lead

When a caller says: "Can someone contact me?" Say: I can take your request. What’s the best number to reach you? Then: Collect name, callback, request, location and preferred time as applicable. Submit to the approved queue. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Existing customer

When a caller says: "Can you check my request?" Say: Do you have your reference number handy? Then: Verify the reference through the approved process before sharing status. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Price

When a caller says: "How much does it cost?" Say: I can check the price that applies. What service are you asking about? Then: Use only approved price, currency, applicability and fees. Offer a quote request when any detail is missing. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Book

When a caller says: "Can I book now?" Say: What date and time work for you? I’ll check availability. Then: Check live availability and confirm only on a successful booking result. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Reschedule

When a caller says: "Can I change my appointment?" Say: Do you have your booking reference? I can check your options. Then: Verify the existing booking, get the requested change and confirm the result before reporting success. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Cancel

When a caller says: "Can you cancel my booking?" Say: I can check the cancellation terms. Do you have the booking reference? Then: Verify authority and terms. Obtain required consent before submitting any change. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

No-show or cancellation fee

When a caller says: "Why was I charged for missing my appointment?" Say: I can ask the team to review the charge against your booking terms. Then: Check the approved policy for the actual booking. Route disputes to staff. Ask for: As applicable: reference, request and callback. Hand off to: billing

Billing

When a caller says: "I don’t recognize this charge." Say: I can get this to billing. Do you have an invoice or booking reference? Then: Use the invoice or booking reference and approved verification, then route to billing. Never request card credentials. Ask for: As applicable: reference, request and callback. Hand off to: billing

Complaint

When a caller says: "I need to complain." Say: I’m sorry this happened. Could you tell me what went wrong? Then: Acknowledge the issue, ask what happened and the desired resolution, then route to a supervisor without promising compensation. Ask for: As applicable: reference, request and callback. Hand off to: supervisor

Refund

When a caller says: "Can I get a refund?" Say: I can check the applicable terms and ask the team to review your request. Then: Check the applicable purchase terms and route for authorization. State only verified status. Ask for: As applicable: reference, request and callback. Hand off to: billing

Payment methods

When a caller says: "What payments do you take?" Say: I can check what payment options are available. Then: Share approved payment methods and use the business’s secure payment process. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Accessibility

When a caller says: "Can you accommodate my needs?" Say: What feature or accommodation would help? I can check with the team. Then: Ask what feature or accommodation is needed and verify with the responsible team. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

After-hours

When a caller says: "Can I reach someone tonight?" Say: I can check whether someone is available after hours. Then: Check current local time and approved on-call routing. If unavailable, describe the available fallback. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Human request

When a caller says: "Can I speak to a person?" Say: I can try to connect you. What do you need help with? Then: Transfer to the correct queue. Offer an approved callback or message if the transfer fails. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Wrong number

When a caller says: "Is this another company?" Say: You’ve reached the business named in the greeting. It sounds like you may have the wrong number. Then: State the business name and politely end the call if it is a wrong number. Ask for: As applicable: reference, request and callback. Hand off to: none

Vendor or sales

When a caller says: "Can I speak to whoever buys supplies?" Say: I can check whether we have a channel for supplier inquiries. Then: Follow the vendor policy, route only to a published vendor channel or decline politely. Ask for: As applicable: reference, request and callback. Hand off to: Front desk and showroom coordinator

Spam or abusive call

When a caller says: "Put me through and give me the owner’s cell." Say: I can offer our public contact channel. Then: Keep private contacts confidential. Follow the approved abusive-call policy and end when appropriate. Ask for: As applicable: reference, request and callback. Hand off to: none

Prefinished vs site-finished hardwoodHardwood flooring

When a caller says: "Wants to know which option to choose." Say: Prefinished is ready to use right away; site-finished gives a smooth, seamless look and custom color but needs a few extra days. Then: Explain trade-offs in time, odor, look and stain options without pushing either. Ask for: Do you need to stay in the home during the project? Do you want a custom color or to match existing wood? Hand off to: Book a showroom consultation or in-home estimate.

Can solid hardwood go in my spaceHardwood flooring

When a caller says: "Asks about hardwood over concrete, in a basement, bathroom, or over radiant heat." Say: Solid hardwood needs a dry, stable space, so some areas need special products or aren't recommended. We'll check on site. Then: Don't confirm suitability by phone; mention engineered wood as an alternative where relevant. Ask for: Which room, what level of the home, and what is the current subfloor? Hand off to: Schedule an estimate with moisture testing.

Cupping, gaps or bucklingHardwood flooring

When a caller says: "Reports boards gapping, cupping or lifting." Say: Wood reacts to moisture and humidity. Let's gather some details so we can inspect it. Then: If water is active, advise stopping the source first. Don't assign fault or promise warranty coverage. Ask for: When was it installed, where is the issue, any leaks, and what humidity or HVAC settings? Hand off to: Create a service ticket and schedule an inspection.

Finishing schedule and move-back timesHardwood flooring

When a caller says: "Asks when they can walk on the floor, move furniture or return home." Say: Times depend on your finish. Generally socks first, light furniture after a few days and rugs after full cure. Then: Check the job record for finish type and give the specific times on file. Ask for: What is your name or job address? Hand off to: Transfer to the project lead if times aren't on file.

Choosing a flooring typeHardwood flooring

When a caller says: "What's the best floor for my kitchen? I have two big dogs and kids." Say: Great question. We carry [brands carried]. For busy, wet areas many people choose luxury vinyl or tile; our consultant can show you options that fit your home and budget. Then: Share general differences between hardwood, engineered wood, laminate, luxury vinyl, tile and carpet. Use only manufacturer claims. Offer a showroom visit, samples or a measurement. Ask for: Which rooms are you thinking about, and is any of it below ground level? Hand off to: Flooring sales consultant

In-home measurement and estimateHardwood flooring

When a caller says: "Can you just tell me how much it'd cost to do about 800 square feet?" Say: Installed prices depend on the product, layout and subfloor, so we confirm them with a measurement. Measurement visits: [measure fee]. Then: Give only approved ranges from [pricing]. Explain that prep, removal, stairs and trim affect cost. Offer to book a measurement. Ask for: What type of flooring are you considering, and which rooms? Hand off to: Estimator and measure technician

Material lead times and order statusHardwood flooring

When a caller says: "I paid my deposit two weeks ago. When is my floor coming in?" Say: Let me check the status for you. Once your material arrives, our scheduler will contact you to set an installation date. Then: Verify identity first. Share only confirmed arrival information. Explain that special orders and backorders can take longer. Never promise a date. Ask for: Could you give me the name and order number on the account? Hand off to: Installation scheduler and project coordinator

Removing old flooringHardwood flooring

When a caller says: "Do you take out the old carpet, or do I have to do that? There's old tile under it too." Say: [removal disposal policy] If there is older tile or adhesive underneath, please don't remove it yourself until we check it, since some older materials need testing first. Then: Note the layers and age of the home. Flag possible asbestos for the coordinator. Explain removal is listed in the quote. Ask for: About what year was your home built? Hand off to: Estimator and measure technician

Subfloor, concrete and moisture concernsHardwood flooring

When a caller says: "My basement is concrete and sometimes feels damp. Can you put flooring down there?" Say: Many basements can get new flooring, but moisture has to be checked first. Our estimator can test and recommend suitable products and any barrier needed. Then: Don't diagnose. Note signs like water stains, past flooding, efflorescence, musty smells or soft spots. Book an inspection. Ask for: Has that area ever had standing water or a leak? Hand off to: Estimator and measure technician

Moving furniture and appliancesHardwood flooring

When a caller says: "Will your guys move my couch and fridge, and what about the toilet in the bathroom?" Say: [furniture moving policy] Gas appliances need a licensed professional to disconnect and reconnect them. Then: Explain what's included and what the customer must do. Note heavy or special items like pianos, aquariums, safes or gun cabinets for the estimator. Ask for: Are there any very heavy or delicate items in the rooms? Hand off to: Installation scheduler and project coordinator

Acclimation and wait timesHardwood flooring

When a caller says: "The boxes were dropped off yesterday. Why can't you install today?" Say: Some products need to adjust to your home's temperature and humidity before installation, as the manufacturer requires. This helps prevent gaps and buckling later. Then: Explain acclimation in general terms and keep heating or AC running. Confirm the install date only from the schedule. Ask for: Are the boxes stored inside the rooms where they'll be installed? Hand off to: Installation scheduler and project coordinator

Hardwood sanding and refinishingHardwood flooring

When a caller says: "My hardwood floors are scratched and dull. Can you refinish them instead of replacing?" Say: Often, yes. Whether solid or engineered wood can be refinished depends on its wear layer and condition, so we'd take a look first. Then: Confirm refinishing is in [available services]. Explain dust, odor, drying and cure times. Offer an assessment. Ask for: About how many square feet, and do you know if it's solid or engineered wood? Hand off to: Flooring sales consultant

Problems after installationHardwood flooring

When a caller says: "My new floor has gaps between the boards and some edges are curling up." Say: I'm sorry to hear that. Let's get the details so our warranty team can review it and set up an inspection if needed. Then: Verify identity. Collect install date, product, rooms, when noticed, photos, recent leaks or humidity changes. Do not assign cause or promise coverage. Ask for: When did you first notice it, and can you send photos? Hand off to: Warranty and customer service manager

Water-damaged flooring and insurance jobsHardwood flooring

When a caller says: "My dishwasher leaked and the floor is ruined. Insurance said to get an estimate." Say: We can measure and provide a written estimate you can share with your insurer. First, please make sure the leak is stopped and the area is drying. Then: Ask if water is still present; if so, use safety guidance and suggest a plumber or water mitigation company. Don't advise on coverage. Note if matching existing flooring is needed. Ask for: Is the leak fixed and is the area dry now? Hand off to: Estimator and measure technician

StairsHardwood flooring

When a caller says: "I want to replace the carpet on my stairs with wood. Do you do stairs?" Say: Stairs are priced per step and depend on the style, nosing and railings. We'll measure and show you options. Then: Confirm stair work is in [available services]. Note number of steps, landings, open or closed sides and existing material. Ask for: About how many steps are there, and are there any landings? Hand off to: Estimator and measure technician

Installing material the customer bought elsewhereHardwood flooring

When a caller says: "I bought flooring online. Can you just install it for me?" Say: [customer supplied material policy] We can't warranty products we didn't supply, but our consultant can review your options. Then: Note product type, quantity and whether it's on site. Explain that quantity, accessories and prep are the customer's responsibility if allowed. Ask for: What type and brand of flooring did you buy, and how much? Hand off to: Flooring sales consultant

Returning leftover or extra materialHardwood flooring

When a caller says: "I have four unopened boxes left over. Can I return them?" Say: Unopened full boxes of stocked products may be returned within [return window], with a restocking fee of [restocking fee]. Special orders aren't returnable. Many customers keep a few boxes for future repairs. Then: Verify identity and check purchase date and whether the product was a special order. Don't approve refunds yourself. Ask for: What's the name or invoice number on the order? Hand off to: Front desk and showroom coordinator

Urgent and safety situations10▾

Oil-based finish or stain fumes near pilot lights or open flames

Fumes can be flammable. Keep flames and sparks away, follow our ventilation instructions and leave if you smell strong fumes in living areas. Call [emergency number] if there is fire.

Finish-soaked rags

Oil-soaked rags can self-ignite. Our crew disposes of them properly; never bunch them up or leave them in a pile.

Feeling unwell from fumes or dust

Leave the area and get fresh air. For breathing difficulty seek medical care; in an emergency call [emergency number].

Active water leak or flooding on the floor

Shut off the water at the main valve if you can do so safely. Stay out of standing water near outlets or appliances; if there is any electrical danger, call [emergency number]. Call a plumber, then take photos and contact us once the area is safe.

Gas smell after appliances were moved

Leave the home right away and don't use light switches, phones or flames inside. From outside, call your gas utility or [emergency number]. Do not go back in until it's declared safe.

Someone is injured at the job site

For serious injuries, call [emergency number] immediately. Once everyone is safe, let us know what happened so we can follow up.

Old flooring or adhesive that may contain asbestos has been disturbed

Stop work and keep people and pets out of the area. Do not sweep, vacuum or keep scraping. Close the area off and contact a licensed asbestos professional; we will help coordinate next steps.

Strong fumes, headache, dizziness or trouble breathing after adhesive or finish work

Get to fresh air and open windows if safe. For trouble breathing, chest pain or fainting, call [emergency number]. For other exposure questions, call poison control at [poison control number].

Exposed tack strip, nails, staples or a loose stair tread

Keep children and pets away and avoid the area. Do not use a loose stair; use another route if possible. Call us at [public phone] so we can arrange an urgent repair.

A fastener may have hit an electrical wire or pipe (sparks, burning smell, water)

Turn off the breaker or water main if you can do so safely. If there is smoke or fire, leave and call [emergency number]. Then call us and a licensed electrician or plumber.

Glossary40▾
Solid hardwood
Boards milled from a single piece of wood through their full thickness, typically 3/4 inch (about 19 mm).
Prefinished
Wood flooring that is stained and sealed at the factory before installation.
Site-finished
Unfinished wood that is sanded, stained and coated after installation in the home.
Tongue and groove
Interlocking board edges; nails or staples go through the tongue at an angle so they're hidden.
Blind nailing
Fastening through the tongue so nails are covered by the next board.
Face nailing
Nails driven through the top of the board, used near walls where a nailer won't fit; holes are filled.
Grade
Appearance classification of wood based on knots, color variation and board length.
Plain-sawn, quarter-sawn, rift-sawn
Ways of cutting the log that change grain pattern and stability; quarter and rift are more stable and costlier.
Moisture meter
Tool used to compare wood and subfloor moisture content before installing.
Racking
Laying out boards of varied lengths so end joints are staggered and look natural.
Hardwax oil
Penetrating finish that soaks into the wood for a natural look and allows spot repairs.
Sheen
Gloss level of the finish, from matte to satin, semi-gloss and gloss.
Buckling
Boards lifting off the subfloor, usually from severe moisture exposure.
Flush-mount vent
Wood floor register installed level with the floor surface.
Subfloor
The structural layer, usually plywood, OSB or concrete, that the finished floor is installed on.
Underlayment
A thin layer between subfloor and flooring that adds cushioning, sound reduction or moisture protection.
Vapor barrier
A plastic film or membrane that limits moisture rising from concrete or crawl spaces into the floor.
Acclimation
Letting flooring adjust to the home's temperature and humidity before installation.
Expansion gap
A small space left around the edges so the floor can expand and contract, hidden by baseboards or trim.
Floating floor
A floor that locks together and rests on the underlayment without being nailed or glued down.
Click-lock
Interlocking edges that let planks snap together without glue.
Engineered wood
Flooring with a real wood top layer bonded to a stable plywood or composite core.
LVP / LVT
Luxury vinyl plank and luxury vinyl tile: water-resistant vinyl floors with realistic wood or stone looks.
Wear layer
The top protective layer of vinyl or the real wood layer of engineered flooring; thicker usually means more durable.
AC rating
A durability scale for laminate, from AC1 for light residential use to AC5 for heavy commercial use.
Janka hardness
A test that rates how resistant a wood species is to dents; higher numbers mean harder wood.
Transition strip
A trim piece that joins two floors of different heights or materials, such as a T-molding or reducer.
Quarter round
A small rounded molding along the bottom of baseboards that covers the expansion gap.
Stair nosing
The rounded front edge of a stair tread, often a matching trim piece for the flooring.
Thinset
A cement-based mortar used to bond tile to the floor.
Grout
The material that fills the joints between tiles.
Lippage
An uneven height difference between the edges of neighboring tiles.
Self-leveling compound
A pourable cement-based product used to flatten uneven subfloors.
Cupping
When wood board edges rise higher than their centers, usually caused by moisture from below.
Crowning
When the center of a board is higher than its edges, often after sanding a floor that had cupped.
Screen and recoat
Lightly abrading a wood floor's finish and applying a fresh coat, without sanding to bare wood.
Waste factor
The extra material ordered to cover cuts and mistakes, usually a percentage of the room size.
Dye lot
A production batch; colors can vary slightly between lots, so material for one job should come from the same lot.
Carpet pad
The cushion installed under carpet that adds comfort and helps the carpet last longer.
VOC
Volatile organic compounds released by some finishes and adhesives while they cure.
Details you'll fill in68▾

Shown as [markers] in the text. After you copy it, each becomes a short question, and your answer fills in every item that mentions it.

  • [business name]What is the business's name as customers should hear it?
  • [location]Where are you located (each branch, with directions or parking if helpful)?
  • [timezone]Which time zone are you in?
  • [languages]Which languages can you serve customers in?
  • [hours]What are your opening hours for each location?
  • [holidays]Which holidays or special dates change your hours?
  • [public phone]Which phone number can be shared publicly?
  • [service area]Which areas do you serve, and where don't you go?
  • [available services]Which services do you offer, and which don't you?
  • [payment methods]Which payment methods do you accept?
  • [pricing]What are your prices, or how is a price worked out?
  • [cancellation policy]What is your cancellation policy?
  • [refund policy]What is your refund policy?
  • [no show policy]Is there a no-show or late cancellation fee? How much, and when does it apply?
  • [verification policy]How do you confirm who a customer is before discussing their account or booking?
  • [vendor policy]How should sales calls, vendors and spam be handled?
  • [emergency number]Which local emergency number applies to your location?
  • [estimate fee]Do you charge for in-home measurements or estimates? If so, how much, and is it credited toward the job?
  • [customer supplied material policy]Do you install flooring that customers bought elsewhere? Under what conditions?
  • [licensing info]What contractor licenses or registrations do you hold, if any?
  • [insurance info]What liability or workers' insurance do you carry?
  • [installer info]Are your installers employees or subcontractors, and how are they trained or vetted?
  • [product brands]Which flooring brands and product lines do you carry?
  • [removal disposal fee]How much do you charge to remove and dispose of old flooring, or is it included?
  • [minimum job size]Do you have a minimum job size or minimum charge? What is it?
  • [quote validity]How long are your written quotes valid?
  • [lead time]What is your typical time from signed quote to installation?
  • [sample policy]Can customers take samples home? Is there a deposit, fee or return deadline?
  • [deposit policy]What deposit do you require, when is it due and is it refundable?
  • [installation warranty]What warranty do you offer on installation workmanship, and for how long?
  • [leftover material policy]What do you do with leftover material after a job: leave it, return it for credit or dispose of it?
  • [furniture moving policy]Do you move furniture before and after installation? Is there a fee or any exclusions?
  • [appliance moving policy]Do you move appliances such as refrigerators, stoves and washers, and do you disconnect or reconnect water or gas lines?
  • [financing options]Do you offer financing? Through which provider and with what general terms?
  • [final payment terms]When is the remaining balance due after installation?
  • [delivery policy]Do you deliver flooring materials? Where, and is there a fee?
  • [measure fee]Is the in-home measurement free or is there a fee? Is it credited toward the order?
  • [quote valid days]How long are your written quotes valid?
  • [deposit amount]What deposit do you require to order materials (amount or percentage)?
  • [balance due terms]When is the remaining balance due (e.g., on completion, at delivery)?
  • [return window]How long after purchase can unopened stocked material be returned?
  • [restocking fee]What restocking fee applies to returns?
  • [removal disposal policy]Do you remove and haul away old flooring? Is it included or extra, and how is it priced?
  • [trim painting policy]Do you paint or caulk baseboards and trim after installation, or is that the customer's responsibility?
  • [workmanship warranty]What does your installation workmanship warranty cover and for how long?
  • [measure duration]About how long does a typical in-home measurement visit take?
  • [poison control number]What is the poison control phone number for your country or region?
  • [brands carried]Which flooring types and brands do you carry?
  • [flooring options details]What flooring categories do you sell and install, and what do you generally recommend for kitchens, baths, basements and homes with pets?
  • [in home measure details]How do in-home measurements work: who comes, how far ahead to book, and when the quote is delivered?
  • [material lead time details]What are typical lead times for stocked and special-order materials, and how are customers updated?
  • [old floor removal details]How do you handle removal of carpet, tile, glued-down floors and multiple layers, and suspected asbestos?
  • [subfloor moisture details]How do you test subfloors and concrete for moisture and flatness, and what prep services do you offer?
  • [furniture appliance details]What exactly can your crew move or disconnect, and what must the customer arrange?
  • [acclimation details]Which products you sell require acclimation, and how long do you typically allow?
  • [hardwood refinishing details]Do you sand and refinish hardwood? What finishes, dust control and drying/cure times apply?
  • [warranty claim details]How do you handle post-installation complaints and warranty claims, and how quickly do you inspect?
  • [water damage repair details]Do you do water-damage and insurance replacement jobs? Do you work directly with insurers or adjusters?
  • [stairs installation details]What stair options do you offer (carpet, wood treads, nosing, runners) and how are they priced?
  • [customer supplied material details]What do customers need to know before you install material they purchased elsewhere?
  • [leftover returns details]How are leftover materials handled after installation, and how do customers return extra boxes?
  • [pattern installation available]Do you install herringbone, chevron or other patterns? Describe what you offer.
  • [bathroom hardwood policy]What is your policy on installing hardwood in bathrooms or powder rooms?
  • [restain fee]What do you charge to re-stain after the customer has approved a color?
  • [prefinished vs site finished details]Which prefinished and site-finished options and finishes do you offer?
  • [hardwood subfloor suitability details]Where will and won't you install solid hardwood (concrete, basements, radiant heat, bathrooms)?
  • [seasonal wood movement details]How do you handle calls about gapping, cupping or buckling, and what do inspections cost?
  • [site finish schedule details]What walk-on, furniture and rug times do you give for each finish you use?
Before you publish16▾

Private notes for the owner. These are not copied into your knowledgebase.

  • Confirm each manufacturer's installation and humidity requirements; ignoring them can void the warranty, and record moisture readings for every job.
  • VOC limits on finishes and stains vary by state and country; verify that the products you use are compliant locally.
  • Sanding older floors may disturb lead paint or old finishes; check local lead-safe work rules (such as RRP in the US) for pre-1978 homes.
  • Have a written process for disposing of oily rags and finish waste to reduce fire risk and meet local rules.
  • Document stain approval and expected natural variation in writing to prevent color disputes.
  • Confirm whether your insurance covers fire or fume-related incidents during site finishing.
  • Contractor licensing, registration and permit rules for flooring work vary by state, province and country. Confirm what applies to you before publishing any statement about being licensed.
  • Asbestos in old resilient flooring and adhesives is regulated in many places. Confirm your local testing, removal and disposal rules and whether your crews may handle it before describing that service.
  • In the US, work that disturbs painted surfaces such as baseboards in homes built before 1978 may fall under the EPA Renovation, Repair and Painting (RRP) rule. Check equivalent rules in your area.
  • Some jurisdictions give a cooling-off period to cancel contracts signed in the customer's home, and some limit deposit amounts. Check your local consumer protection rules before setting deposit and cancellation terms.
  • Manufacturer warranties often depend on installation methods, moisture testing and site conditions. Keep moisture readings, photos and signed walkthroughs to support claims.
  • Only publish product claims (waterproof, low-VOC, formaldehyde certifications, pet-proof) exactly as the manufacturer documents them for the specific products you carry.
  • Verify your general liability insurance, workers' compensation and any subcontracted installers' coverage. If you use subcontractors, decide how warranty responsibility is explained to customers.
  • Customer home access details such as gate, lockbox and alarm codes are sensitive. Limit who can see them and remove them after the job.
  • Review every placeholder, especially pricing, deposits, return windows and warranty terms, and make sure they match your written contracts before publishing.
  • Confirm the correct emergency and poison control numbers for your country, and whether your crews may reset toilets or disconnect water lines under local plumbing rules.